HomeMy WebLinkAboutEP113a - BUILDING ELECTRICAL PLANS - BUILDING AS
S
S
S
S
S
S
F S F S
FS SDCESCRJ DCESCR J
S
J
DHCOCOHA3
HA3-1
HA3-1
HA3-1
HA3-1
HA3-1
HA3-1
15cd
15cd
15cd
15cd15cd15cd
15cd
15cd E
HA3-2
HA3-2
HA3-2HA3-2
HA3-2HA3-2
FCU-4
HA3-3,5
FCU-4
HA3-4,6
3 / E403
3 / E403 3 / E403 3 / E403
1 / E4031 / E4031 / E403
1 / E403 1 / E403 1 / E401
1 / E401
1 / E401
3 / E402
3 / E401
4 / E403
UNIT B2
302
UNIT A1
304
ELEC. ROOM
E301
UNIT B2
301
UNIT A4
303
UNIT A1
305
UNIT B1
306
UNIT B1
307
UNIT B1
308
UNIT B1
309
UNIT A2
310
UNIT B1
311
UNIT A5
313
ELEC. ROOM
E302
MECH. ROOM
M302
UNIT B3
317
UNIT B2
315
UNIT A1
312
STORAGE
S301
MECH. ROOM
M301
STAIRS
M203
STAIRS
M208
ELEVATOR
M207
3
2
5
4 1
1
HA3-25 3
HA3-25
HA3-26
6 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EP113aBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR FCU.
2 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL.
3 PROVIDE POWER FOR ACCESS CONTROL. COORDINATE WITH DOOR
HARDWARE BEING PROVIDED ON EXACT REQUIREMENTS. ELECTRICAL
CONTRACTOR TO MAKE ALL FINAL CONNTECTIONS.
4 PROVIDE 4" SLEEVE THROUGH FLOOR FOR TELECOMMUNICATIONS CABLING.
COORDINATE WITH UTILITY PROVIDER ON EXACT REQUIREMENTS AND
LOCATION PRIOR TO ROUGH-IN.
5 PROVIDE PLYWOOD BACKBOARD AND ALL REQUIRED GROUNDING FOR
TELECOMMUNICATIONS PROVIDER. COORDINATE EXACT REQUIREMENTS
WITH UTILITY PROVIDER PRIOR TO ROUGH-IN.
6 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR MAGNETIC DOOR HOLD OPENS.
1/8" = 1'-0"
BUILDING A ELECTRICAL THIRD FLOOR PLAN -AREA A 1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM
TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING
ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR
TO ROUHG-IN.
# DESCRIPTION DATE
07/08/21