Loading...
HomeMy WebLinkAboutEP113a - BUILDING ELECTRICAL PLANS - BUILDING AS S S S S S S F S F S FS SDCESCRJ DCESCR J S J DHCOCOHA3 HA3-1 HA3-1 HA3-1 HA3-1 HA3-1 HA3-1 15cd 15cd 15cd 15cd15cd15cd 15cd 15cd E HA3-2 HA3-2 HA3-2HA3-2 HA3-2HA3-2 FCU-4 HA3-3,5 FCU-4 HA3-4,6 3 / E403 3 / E403 3 / E403 3 / E403 1 / E4031 / E4031 / E403 1 / E403 1 / E403 1 / E401 1 / E401 1 / E401 3 / E402 3 / E401 4 / E403 UNIT B2 302 UNIT A1 304 ELEC. ROOM E301 UNIT B2 301 UNIT A4 303 UNIT A1 305 UNIT B1 306 UNIT B1 307 UNIT B1 308 UNIT B1 309 UNIT A2 310 UNIT B1 311 UNIT A5 313 ELEC. ROOM E302 MECH. ROOM M302 UNIT B3 317 UNIT B2 315 UNIT A1 312 STORAGE S301 MECH. ROOM M301 STAIRS M203 STAIRS M208 ELEVATOR M207 3 2 5 4 1 1 HA3-25 3 HA3-25 HA3-26 6 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EP113aBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR FCU. 2 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL. 3 PROVIDE POWER FOR ACCESS CONTROL. COORDINATE WITH DOOR HARDWARE BEING PROVIDED ON EXACT REQUIREMENTS. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL CONNTECTIONS. 4 PROVIDE 4" SLEEVE THROUGH FLOOR FOR TELECOMMUNICATIONS CABLING. COORDINATE WITH UTILITY PROVIDER ON EXACT REQUIREMENTS AND LOCATION PRIOR TO ROUGH-IN. 5 PROVIDE PLYWOOD BACKBOARD AND ALL REQUIRED GROUNDING FOR TELECOMMUNICATIONS PROVIDER. COORDINATE EXACT REQUIREMENTS WITH UTILITY PROVIDER PRIOR TO ROUGH-IN. 6 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR MAGNETIC DOOR HOLD OPENS. 1/8" = 1'-0" BUILDING A ELECTRICAL THIRD FLOOR PLAN -AREA A 1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR TO ROUHG-IN. # DESCRIPTION DATE 07/08/21