HomeMy WebLinkAboutEP114b - BUILDING ELECTRICAL PLANS - BUILDING AHP-1
HP-1
HP-1
HP-1
HP-1
HP-1
HP-1
HP-1
HP-2
HP-2
HP-2 HP-1
HP-1HP-2
HP-2
HP-2
HP-4
HP-1
HP-1
HP-1
HP-1
HP-1
HP-1
WP
WP
WP
WP
HA3-27
HA3-27
HA3-27
HA3-27
1
2
3
2
2
2
2
2
2
2
2
2
1
2
2
2
2
2
2
1
2
2
2
2
HA3-12,14
HA3-16,18
3
PEV-1
HA3-19 4 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EP114bBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 PROVIDE WEATHER PROOF WHILE IN USE GFI PROTECTED RECEPTACLE.
COORDINATE MOUNTING LOCATION WITH EQUIPMENT BEING PROVIDED.
2 REFER TO E400 SERIES DRAWINGS FOR CIRCUITING INFORMATION TO
CONDENSING UNIT.
3 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR CONDENSING
UNIT.
4 PROVIDE CONNECTION TO PEV-1. COORDINATE EXACT REQUIREMENTS WITH
EQUIPMENT BEING PROVIDED.
1/8" = 1'-0"
BUILDING A ELECTRICAL ROOF PLAN - AREA B1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM
TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING
ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR
TO ROUHG-IN.
# DESCRIPTION DATE
07/08/21