Loading...
HomeMy WebLinkAboutEP122 - BUILDING ELECTRICAL PLANS - BUILDING BS F S FF S S S S S SF FF DC ES CRJ DC ES CRJ ELEC. ROOM-1 E202-1 MECH. ROOM-1 M202-1 ELEC. ROOM-1 E201-1 MECH. ROOM-1 M201-1 3 3HB1-29 1 2 2 5 4 1 E E HB1-22 HB1-22 HB1-22 HB1-22 HB1-22 HB1-24 FCU-4 HB1-25,27 HB1-2315cd 15cd 15cd 15cd 15cd 15cd FCU-4 HB1-26,28 HB1-29 HB1-23 HB1-23 HB1-23 HB1-36 HB1-13 UH-1 UH-1 6 6 3 / E403 3 / E403 3 / E4022 / E4013 / E401 3 / E4013 / E401 3 / E4011 / E401 3 / E402 3 / E403 3 / E403 2 / E401 2 / E401 UNIT B2 202 UNIT B2 201 UNIT A4 204 UNIT A1 IDD 206 UNIT A1 205 UNIT A2 207 UNIT A2 208 UNIT A2 210 UNIT A2 209 UNIT A1 IDD 211 UNIT A1 IDD 212 UNIT A4 213 UNIT B2 215 UNIT B2 216 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EP122BUILDING ELECTRICALPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR FCU. 2 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL. 3 PROVIDE POWER FOR ACCESS CONTROL. COORDINATE WITH DOOR HARDWARE BEING PROVIDED ON EXACT REQUIREMENTS. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL CONNTECTIONS. 4 PROVIDE 4" SLEEVE THROUGH FLOOR FOR TELECOMMUNICATIONS CABLING. COORDINATE WITH UTILITY PROVIDER ON EXACT REQUIREMENTS AND LOCATION PRIOR TO ROUGH-IN. 5 PROVIDE PLYWOOD BACKBOARD AND ALL REQUIRED GROUNDING FOR TELECOMMUNICATIONS PROVIDER. COORDINATE EXACT REQUIREMENTS WITH UTILITY PROVIDER PRIOR TO ROUGH-IN. 6 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR UH-1. 1/8" = 1'-0" BUILDING B ELECTRICAL SECOND FLOOR PLAN1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR TO ROUHG-IN. # DESCRIPTION DATE 07/08/21