HomeMy WebLinkAboutEP123 - BUILDING ELECTRICAL PLANS - BUILDING BS F S FF S
S
S
S
S
SF FF DC ES
CRJ
DC ES CRJ
HB4-9
HB4-9 HB4-9
HB4-9
HB4-9
HB4-14
HB4-14
HB4-14
HB4-14
HB4-14
HB4-15
FCU-4 FCU-4
HB4-10,12 HB4-11,13
15cd
15cd 15cd15cd 15cd
15cd
E
E
3
3HB4-16
1
2
2
5
4
1
HB4-16
3 / E403
3 / E402 1 / E401 3 / E401
3 / E401 2 / E401
3 / E403
3 / E403
3 / E4022 / E4013 / E4013 / E4011 / E401
3 / E403
UNIT B2
302
UNIT A4
304
UNIT A1
306
UNIT A2
308
UNIT A2
310
UNIT A1 IDD
312
UNIT B2
316
UNIT B2
315
UNIT A4
313
ELEC. ROOM
E302
MECH. ROOM
M302
UNIT A1 IDD
311
UNIT A2
309
UNIT A2
307
UNIT A1
305
ELEC. ROOM
E301
MECH. ROOM
M301
UNIT B2
301 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
EP123BUILDING ELECTRICALPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES
1 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR FCU.
2 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL.
3 PROVIDE POWER FOR ACCESS CONTROL. COORDINATE WITH DOOR
HARDWARE BEING PROVIDED ON EXACT REQUIREMENTS. ELECTRICAL
CONTRACTOR TO MAKE ALL FINAL CONNTECTIONS.
4 PROVIDE 4" SLEEVE THROUGH FLOOR FOR TELECOMMUNICATIONS CABLING.
COORDINATE WITH UTILITY PROVIDER ON EXACT REQUIREMENTS AND
LOCATION PRIOR TO ROUGH-IN.
5 PROVIDE PLYWOOD BACKBOARD AND ALL REQUIRED GROUNDING FOR
TELECOMMUNICATIONS PROVIDER. COORDINATE EXACT REQUIREMENTS
WITH UTILITY PROVIDER PRIOR TO ROUGH-IN.
1/8" = 1'-0"
BUILDING B ELECTRICAL THIRD FLOOR PLAN 1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES
FOR EACH DWELLNG UNIT TYPE.
C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM
TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING
ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR
TO ROUHG-IN.
# DESCRIPTION DATE
07/08/21