Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EP125 - BUILDING ELECTRICAL PLANS - BUILDING B
1 2 3 HP-1 HP-1 HP-1 HP-1 HP-2 HP-2HP-2 HP-2 HP-1 HP-1 HP-1HP-1 HB4-21,23 HB4-22,24 HB4-25,27 HB4-26,28 HP-2 HP-2 HP-2HP-2 HP-2 HP-2 HP-2 HP-2 HP-1 HP-1 HP-1HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1 HP-1HP-1 HP-1 HP-1 HP-1 HP-1HP-1 HP-1 HP-1 HP-1HP-1 HP-1 HP-2 HP-2 HP-2HP-2 HB4-29 WP WP HB4-291 2 2 2 3 3 3 2 2 2 2 22 22 2 2 HB4-29 WP HB4-29 WP HB4-29 WP 22 22 1 1 1 1 2 2 2 HB4-29 WP HB4-30,32 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 HB4-31,33 HB4-34,36 HB4-35,37 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EP125BUILDING ELECTRICALPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE WEATHER PROOF WHILE IN USE GFI PROTECTED RECEPTACLE. COORDINATE MOUNTING LOCATION WITH EQUIPMENT BEING PROVIDED. 2 REFER TO E400 SERIES DRAWINGS FOR CIRCUITING INFORMATION TO CONDENSING UNIT. 3 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR CONDENSING UNIT. 1/8" = 1'-0" BUILDING B ELECTRICAL ROOF PLAN1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR TO ROUHG-IN. # DESCRIPTION DATE 07/08/21