Loading...
HomeMy WebLinkAboutEP132 - BUILDING ELECTRICAL PLANS - BUILDING CFF F F S F S F S S S S S S SS DC ES CRJ DC ES CRJ ELEC. ROOM-2 E201-2 MECH. ROOM-3 M201-3 MECH. ROOM-3 M202-3 ELEC. ROOM-3 E202-3 HC1-10 HC1-10 HC1-10 HC1-10 HC1-10 HC1-10 HC1-11 HC1-11 HC1-11 HC1-11 HC1-11 E E HC1-14,16 FCU-4 HC1-13,15 HC1-12 15cd 15cd 15cd 15cd 15cd 15cd 15cd 15cd 1 2 2 5 4 3 3 1 HC1-9 HC1-9 FCU-4 UNIT B1 206 UNIT A2 IDD 208 UNIT A2 IDD 210 UNIT A1 212 UNIT A4 203 UNIT B1 207 UNIT A2 IDD 209 UNIT A2 211 UNIT A1 213 UNIT A4 215 UNIT B2 216 UNIT B2 217 1 / E404 2 / E401 1 / E403 4 / E401 4 / E401 1 / E401 3 / E403 3 / E403 3 / E402 1 / E4013 / E4014 / E4011 / E4032 / E401 3 / E402 UNIT B2 202 UNIT A1 IDD 204 UNIT B2 201 1 / E404 UNIT A1 IDD 205 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EP132BUILDING ELECTRICALPLANS -BUILDING CNORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE ELECTRICAL CONNECTION AND DISCONNECT FOR FCU. 2 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL. 3 PROVIDE POWER FOR ACCESS CONTROL. COORDINATE WITH DOOR HARDWARE BEING PROVIDED ON EXACT REQUIREMENTS. ELECTRICAL CONTRACTOR TO MAKE ALL FINAL CONNTECTIONS. 4 PROVIDE 4" SLEEVE THROUGH FLOOR FOR TELECOMMUNICATIONS CABLING. COORDINATE WITH UTILITY PROVIDER ON EXACT REQUIREMENTS AND LOCATION PRIOR TO ROUGH-IN. 5 PROVIDE PLYWOOD BACKBOARD AND ALL REQUIRED GROUNDING FOR TELECOMMUNICATIONS PROVIDER. COORDINATE EXACT REQUIREMENTS WITH UTILITY PROVIDER PRIOR TO ROUGH-IN. 1/8" = 1'-0" BUILDING C ELECTRICAL SECOND FLOOR PLAN 1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR TO ROUHG-IN. # DESCRIPTION DATE 07/08/21