HomeMy WebLinkAboutID003 - FLOORING TRANSITIONSCENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
STAINLESS STEEL TRANSITION STRIP
VINYL PLANK TILE FLOORING AS
SCHEDULED, FLOAT FLOOR AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
SOUND MAT
PORCELAIN TILE FLOORING
AS SCHEDULED
THIN SETTING BED TO BE
FEATHERED FOR LEVELING
LEVELING STRIP
TOP OF DECK (TOP OF SLAB
@ CLUBHOUSE)
CENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
STAINLESS STEEL TRANSITION STRIP
PORCELAIIN TILE FLOORING
AS SCHEDULED
PORCELAIN TILE FLOORING
AS SCHEDULED
THIN SETTING BED TO BE
FEATHERED FOR LEVELING
TOP OF DECK (TOP OF SLAB @ CLUBHOUSE)
CENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
STAINLESS STEEL TRANSITION STRIP
CARPET AS SCHEDULED; FLOAT AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
PORCELAIN TILE FLOORING
AS SCHEDULED
THIN SETTING BED TO BE
FEATHERED FOR LEVELING
ACOUSTICAL MAT
TOP OF DECK (TOP OF SLAB
@ CLUBHOUSE)
CENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
STAINLESS STEEL DIVIDER STRIP
CARPET AS SCHEDULED; FLOAT AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
ACOUSTICAL MAT
TOP OF DECK (TOP OF SLAB
@ CLUBHOUSE)
VINYL PLANK TILE FLOORING AS
SCHEDULED, FLOAT FLOOR AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
SOUND MAT
LEVELING STRIP
CENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
METAL TRANSITION STRIP
CARPET AS SCHEDULED; FLOAT AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
ACOUSTICAL MAT
TOP OF DECK (TOP OF SLAB
@ CLUBHOUSE)
CENTER FLOORING TRANSITION
WITH SCHEDULED DOOR (WHERE
APPLICABLE)
REF. DOOR SCHEDULE FOR REQ.
DISTANCE BETWEEN FLOORING AND
BOTTOM OF DOOR
STAINLESS STEEL TRANSITION STRIP
VINYL PLANK TILE FLOORING AS
SCHEDULED, FLOAT FLOOR AS
REQUIRED TO PROVIDE SMOOTH
TRANSITION
LUAN BOARD
TOP OF DECK ARCHITECTCLIENT CONSULTANT PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO INDIANAPOLIS, INREVISIONS 20031
JANUARY 15, 2021
BID DOCUMENTS
ID003FLOORINGTRANSITIONSNORTH ENDAPARTMENTSCARMEL, INSCALE: 3" = 1'-0"1 FLOOR TRANSITION DETAIL (PTX-VPX)
SCALE: 3" = 1'-0"2 FLOOR TRANSITION DETAIL (PTX-PTX)
SCALE: 3" = 1'-0"3 FLOOR TRANSITION DETAIL (PTX-CPTX)
SCALE: 3" = 1'-0"4 FLOOR TRANSITION DETAIL (VPX-CPTX)
SCALE: 3" = 1'-0"5 FLOORING TRANSITION DETAIL (CPTX-CPTX)
SCALE: 3" = 1'-0"6 FLOORING TRANSITION DETAIL (VPX-VPX)
# DESCRIPTION DATE
07/08/21