Loading...
HomeMy WebLinkAboutM110a - BUILDING MECHANICAL PLANS - BUILDING AUH-1 UH-1 UH-2 RISER ROOM 002 ST2-0 ST2-0 ST1-0 ST1-0 ELV-1 ELV-1 GARAGE 001 1 2 3 3 4 CO CO CO CARBON MONOXIDE CONTROLLER5 6 6 6 CO6 GEF-1GEF-2 COMBINATION MOTOR STARTER FOR GEF-2 PROVIDED BY DIV. 26 BELOW GRADE CONCRETE WELL ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET M110aBUILDING MECHANICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO SHEET M000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFERENCE M501 SERIES FOR MECHANICAL DETAILS. C REFERENCE M601 SERIES FOR MECHANICAL SCHEDULES. D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO FABRICATION. E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED CONSTRUCTION TO MAINTAIN CONSTRUCTION RATING. F THERMOSTATS TO BE 44" A.F.F. OR ALIGNED TO ADJACENT SWITCHES UNLESS OTHERWISE NOTED. G SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE NON-METALLIC COMPONENTS LARGER THAN 4"Ø (I.E. PVC OR CONDUIT) PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE DUCTWORK LARGER THAN 4"Ø PENETRATES RATED ASSEMBLIES, INSTALL FIRE DAMPER. H SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER MANUFACTURES RECOMMENDATIONS. I ALL EXTERIOR VENT CAP AND VENT HOOD COLORS TO BE VERIFIED IN SHOP DRAWINGS. J ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED. COORDINATE MOUNTING HEIGHT WITH OTHER DISCIPLINES AND SPACE. K THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN ATTACHED TO THE DRYER BOX IN EACH APARTMENT. THE TAG SHALL DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET 90 DEG. ELBOW: COUNT=X 45 DEGREE ELBOWS: COUNT=X L PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE AND LOCAL CODES. M DRYER AND BATHROOM EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE. N ALL HVAC SUPPLY REGISTERS, RETURN GRILLES AND DUCT TERMINATIONS ARE TO BE PROTECTED DURING CONSTRUCTION ACTIVITIES AGAINST THE INTRODUCTION OF DUST AND POLLUTANTS FROM ENTERING THE SYSTEM. O ALL DUCTS ARE TO BE AIR SEALED AS PER UL181A OR UL181B. P ALL DUCT SYSTEMS ARE TO BE TESTED IN ACCORDANCE WITH 2015 IECC R403.3.2 THROUGH R403.3.5. SHEET KEYNOTES 1 PROVIDE WALL MOUNTED EXHAUST FAN AND COORDINATE MOUNTING HEIGHT WITH GENERAL CONTRACTOR. FAN IS TO RUN CONTINUOUSLY. REFER TO SCHEDULE M601 FOR SIZE OF FAN. 2 PROVIDE WALL MOUNTED EXHAUST FAN AND COORDINATE MOUNTING HEIGHT WITH GENERAL CONTRACTOR. FAN IS TO RUN ON CARBON MONOXIDE CONTROLLER OPERATION. REFER TO SCHEDULE M601 FOR SIZE OF FAN. 3 PROVIDE AND INSTALL RECESSED WALL MOUNTED UNIT HEATER 8-INCHES AF.F.. 4 PROVIDE AND INSTALL WALL HUNG UNIT HEATER 6-FEET AF.F.. 5 PROVIDE CARBON MONOXIDE CONTROLLER AND MOUNT ON WALL IN APPROXIMATE LOCATION. CONTROLLER IS TO BE INTERLOCKED WITH GEF-2 TO TURN ON UPON DETECTION OF CARBON MONOXIDE. 6 PROVIDE CARBON MONOXIDE SENSOR AND MOUNT 48-INCHES A.F.F. ON WALL. 1/8" = 1'-0" BUILDING A MECHANICAL LOWER FLOOR PLAN - AREA A 1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 07/08/21