Loading...
HomeMy WebLinkAboutM112b - BUILDING MECHANICAL PLANS - BUILDING AT FCU-4 SG2SG2 -200 SG2SG2 -200 SG2SG2 -200 UH-1 FD FD RG1 12/10 8ø 8ø 8ø UNIT A2 218 UNIT A1 IDD 220 UNIT A1 IDD 222 UNIT A1 IDD 223 UNIT A2 221 UNIT A1 IDD 219 UNIT A2 IDD 225 UNIT B3b 224 UNIT B2 226 UNIT B2 227 3 M404 1 2 2 2 3 5 4 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET M112bBUILDING MECHANICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO SHEET M000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFERENCE M501 SERIES FOR MECHANICAL DETAILS. C REFERENCE M601 SERIES FOR MECHANICAL SCHEDULES. D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO FABRICATION. E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED CONSTRUCTION TO MAINTAIN CONSTRUCTION RATING. F THERMOSTATS TO BE 44" A.F.F. OR ALIGNED TO ADJACENT SWITCHES UNLESS OTHERWISE NOTED. G SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE NON-METALLIC COMPONENTS LARGER THAN 4"Ø (I.E. PVC OR CONDUIT) PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE DUCTWORK LARGER THAN 4"Ø PENETRATES RATED ASSEMBLIES, INSTALL FIRE DAMPER. H SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER MANUFACTURES RECOMMENDATIONS. I ALL EXTERIOR VENT CAP AND VENT HOOD COLORS TO BE VERIFIED IN SHOP DRAWINGS. J ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED. COORDINATE MOUNTING HEIGHT WITH OTHER DISCIPLINES AND SPACE. K THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN ATTACHED TO THE DRYER BOX IN EACH APARTMENT. THE TAG SHALL DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET 90 DEG. ELBOW: COUNT=X 45 DEGREE ELBOWS: COUNT=X L PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE AND LOCAL CODES. M DRYER AND BATHROOM EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE. N ALL HVAC SUPPLY REGISTERS, RETURN GRILLES AND DUCT TERMINATIONS ARE TO BE PROTECTED DURING CONSTRUCTION ACTIVITIES AGAINST THE INTRODUCTION OF DUST AND POLLUTANTS FROM ENTERING THE SYSTEM. O ALL DUCTS ARE TO BE AIR SEALED AS PER UL181A OR UL181B. P ALL DUCT SYSTEMS ARE TO BE TESTED IN ACCORDANCE WITH 2015 IECC R403.3.2 THROUGH R403.3.5. SHEET KEYNOTES 1 PROVIDE AND INSTALL RECESSED WALL MOUNTED UNIT HEATER 8-INCHES AF.F.. 2 PROVIDE CEILING RADIATION DAMPER. 3 RETURN AIR GRILL LOW IN THE WALL DUCTED TO THE FCU. 4 OUTSIDE AIR DUCT RISER UP TO LEVEL ABOVE. PROVIDE FIRE DAMPER AT FIRE RATED FLOOR PENETRATIONS. SEE RISER SECTION DETAIL. 5 INSTALL FCU VERTICALLY PER MANUFACTURER'S RECOMMENDATION TO WALL PER M-501 DETAIL. ROUTE REFRIGERANT LINES THRU WALL AND UP TO ROOF LEVEL TO CORRESPONDING CONDENSING UNIT. FIRE SEAL ANY OPENINGS THROUGH FIRE RATED ASSEMBLIES. ROUTE CONDENSATE PVC PIPING TO NEAREST FLOOR DRAIN. 1/8" = 1'-0" BUILDING A MECHANICAL SECOND FLOOR -AREA B1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 07/08/21