HomeMy WebLinkAboutM120 - BUILDING MECHANICAL PLANS - BUILDING BUH-1
UH-1
2
M405
PARKING
GARAGE
001
RISER ROOM
002
UH-2
1
M405
2
3
2
12
CO
CO
CO
CO
CARBON MONOXIDE
CONTROLLER
5
GEF-4 GEF-3
4
4
4
4 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
M120BUILDING MECHANICALPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES
A REFER TO SHEET M000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFERENCE M501 SERIES FOR MECHANICAL DETAILS.
C REFERENCE M601 SERIES FOR MECHANICAL SCHEDULES.
D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO
COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO
FABRICATION.
E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED
CONSTRUCTION TO MAINTAIN CONSTRUCTION RATING.
F THERMOSTATS TO BE 44" A.F.F. OR ALIGNED TO ADJACENT SWITCHES UNLESS
OTHERWISE NOTED.
G SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT
RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE
NON-METALLIC COMPONENTS LARGER THAN 4"Ø (I.E. PVC OR CONDUIT)
PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE
DUCTWORK LARGER THAN 4"Ø PENETRATES RATED ASSEMBLIES, INSTALL
FIRE DAMPER.
H SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURES RECOMMENDATIONS.
I ALL EXTERIOR VENT CAP AND VENT HOOD COLORS TO BE VERIFIED IN SHOP
DRAWINGS.
J ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED.
COORDINATE MOUNTING HEIGHT WITH OTHER DISCIPLINES AND SPACE.
K THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN
ATTACHED TO THE DRYER BOX IN EACH APARTMENT. THE TAG SHALL
DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS
FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET 90 DEG. ELBOW:
COUNT=X 45 DEGREE ELBOWS: COUNT=X
L PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE AND LOCAL
CODES.
M DRYER AND BATHROOM EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE.
N ALL HVAC SUPPLY REGISTERS, RETURN GRILLES AND DUCT TERMINATIONS
ARE TO BE PROTECTED DURING CONSTRUCTION ACTIVITIES AGAINST THE
INTRODUCTION OF DUST AND POLLUTANTS FROM ENTERING THE SYSTEM.
O ALL DUCTS ARE TO BE AIR SEALED AS PER UL181A OR UL181B.
P ALL DUCT SYSTEMS ARE TO BE TESTED IN ACCORDANCE WITH 2015 IECC
R403.3.2 THROUGH R403.3.5.
SHEET KEYNOTES
1 PROVIDE WALL MOUNTED EXHAUST FAN AND COORDINATE MOUNTING
HEIGHT WITH GENERAL CONTRACTOR. FAN IS TO RUN CONTINUOUSLY.
REFER TO SCHEDULE M601 FOR SIZE OF FAN.
2 PROVIDE WALL MOUNTED EXHAUST FAN AND COORDINATE MOUNTING
HEIGHT WITH GENERAL CONTRACTOR. FAN IS TO RUN ON CARBON
MONOXIDE CONTROLLER OPERATION. REFER TO SCHEDULE M601 FOR SIZE
OF FAN.
3 PROVIDE AND INSTALL WALL HUNG UNIT HEATER 6-FEET AF.F..
4 PROVIDE CARBON MONOXIDE SENSOR AND MOUNT 48-INCHES A.F.F. ON
WALL.
5 PROVIDE CARBON MONOXIDE CONTROLLER AND MOUNT ON WALL IN
APPROXIMATE LOCATION. CONTROLLER IS TO BE INTERLOCKED WITH GEF-2
TO TURN ON UPON DETECTION OF CARBON MONOXIDE.
1/8" = 1'-0"
BUILDING B MECHANICAL LOWER FLOOR PLAN1
# DESCRIPTION DATE
1 BID DOCUMENT 01/15/2021
1
07/08/21