HomeMy WebLinkAboutM125 - BUILDING MECHANICAL PLANS - BUILDING BHP-2HP-2
HP-2 HP-2
HP-2HP-2
HP-2 HP-2
HP-2HP-2
HP-2 HP-2
HP-2HP-2
HP-2 HP-2
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1 HP-1
HP-1HP-1
HP-1 HP-1
HP-1HP-1
HP-1 HP-1
HP-1HP-1
HP-1 HP-1
HP-1HP-1
HP-1 HP-1
HP-1HP-1
HP-1 HP-1
HP-1 HP-1
HP-1HP-1
R 10' - 0"R 1 0' - 0 "
1
2
TYP OF ALL
2
PEV-1
PEV-1 3
3 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031
JANUARY 15, 2021
BID SET
M125BUILDING MECHANICALPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES
A REFER TO SHEET M000 FOR GENERAL MECHANICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFERENCE M501 SERIES FOR MECHANICAL DETAILS.
C REFERENCE M601 SERIES FOR MECHANICAL SCHEDULES.
D COORDINATE WITH STRUCTURAL AND FRAMING PLANS PRIOR TO
COMMENCING WORK. COORDINATE ALL ROUTING WITH ALL TRADES PRIOR TO
FABRICATION.
E SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND TYPES OF RATED
CONSTRUCTION TO MAINTAIN CONSTRUCTION RATING.
F THERMOSTATS TO BE 44" A.F.F. OR ALIGNED TO ADJACENT SWITCHES UNLESS
OTHERWISE NOTED.
G SEAL ALL FLOOR, CEILING, AND WALL PENETRATIONS. USE FIRE CAULK AT
RATED ASSEMBLIES AND GENERAL SEALANT ELSEWHERE. WHERE
NON-METALLIC COMPONENTS LARGER THAN 4"Ø (I.E. PVC OR CONDUIT)
PENETRATES RATED ASSEMBLIES, INSTALL INTUMESCENT COLLAR. WHERE
DUCTWORK LARGER THAN 4"Ø PENETRATES RATED ASSEMBLIES, INSTALL
FIRE DAMPER.
H SIZE AND INSTALL REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURES RECOMMENDATIONS.
I ALL EXTERIOR VENT CAP AND VENT HOOD COLORS TO BE VERIFIED IN SHOP
DRAWINGS.
J ALL FAN COIL UNITS TO BE WALL MOUNTED UNLESS OTHERWISE INDICATED.
COORDINATE MOUNTING HEIGHT WITH OTHER DISCIPLINES AND SPACE.
K THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SIGN
ATTACHED TO THE DRYER BOX IN EACH APARTMENT. THE TAG SHALL
DOCUMENT THE ASSOCIATED INSTALLED DRYER VENT AND READ AS
FOLLOWS: CONNECTED VENT DUCT: STRAIGHT DUCT: X FEET 90 DEG. ELBOW:
COUNT=X 45 DEGREE ELBOWS: COUNT=X
L PROVIDE MECHANICAL SYSTEMS IN COMPLIANCE WITH STATE AND LOCAL
CODES.
M DRYER AND BATHROOM EXHAUST DUCTWORK TO BE MINIMUM 28 GAUGE.
N ALL HVAC SUPPLY REGISTERS, RETURN GRILLES AND DUCT TERMINATIONS
ARE TO BE PROTECTED DURING CONSTRUCTION ACTIVITIES AGAINST THE
INTRODUCTION OF DUST AND POLLUTANTS FROM ENTERING THE SYSTEM.
O ALL DUCTS ARE TO BE AIR SEALED AS PER UL181A OR UL181B.
P ALL DUCT SYSTEMS ARE TO BE TESTED IN ACCORDANCE WITH 2015 IECC
R403.3.2 THROUGH R403.3.5.
SHEET KEYNOTES
1 CONDENSING UNIT SHALL BE MOUNTED ON NON-SKID NEOPRENE PAD AND
FIBERGLASS BASE. LABEL EACH UNIT WITH A COORESPONDING FAN COIL
UNIT TAG IT SERVES. SIZE REFRIGERANT PIPING AND ACCESSORIES PER
MANUFACTURER'S RECOMMENDATIONS AND SERVICE CLEARANCES. ROUTE
REFRIGERANT PIPING THROUGH ADJACENT SIDE WALL PER DETAIL ON M501.
2 OUTSIDE AIR DUCT WITH GOOSENECK TERMINATING MINIMUM 3-FEET ABOVE
ROOF LEVEL. KEEP A 10-FEET CLEARANCE FROM ANY VENT PIPING OR
EXHAUSTING VENTS.
3 PROVIDE AND INSTALL PENTHOUSE ELEVATOR VENT LIKE MODEL
"GREENHECK-PEV-400" OR EQUAL. COORDINATE WITH ELECTRICAL
CONTRACTOR FOR POWER CONNECTION.
1/8" = 1'-0"
BUILDING B MECHANICAL ROOF PLAN1
# DESCRIPTION DATE
1 BID DOCUMENT 01/15/2021
1
07/08/21