Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P112b - BUILDING PLUMBING PLANS - BUILDING A
UNIT A2 218 UNIT A2 221 UNIT B3b 224 UNIT B2 226 UNIT B2 227 MECH. ROOM M203 UNIT A2 IDD 225 UNIT A1 IDD 223 UNIT A1 IDD 222 UNIT A1 IDD 220 UNIT A1 IDD 219 1 2 2" FD-1 2" W 2"FD 1 2 3 4 3 12 1 2 1 2 33 4 1 212 33 12 3 12 1 2 3 12 1 2 1 2 1 2 33 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 3/4" CW 1" CW 2" CW 2" CW 2" CW 2" CW 2" CW ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P112bBUILDING PLUMBINGPLANS - BUILDING ANORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT STACK. 3 3/4" COLD WATER RISER. 4 6" STORM RISER. 1/8" = 1'-0" BUILDING A PLUMBING SECOND FLOOR - AREA B1 # DESCRIPTION DATE 07/08/21