Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P121 - BUILDING PLUMBING PLANS - BUILDING B
2"CW 4 1 1 2 5 3 1 2 5 1 2 5 1 2 5 1 2 5 1 2 5 3 1 2 5 1 2 5 1 2 5 1 2 5 5 12 1 2 5 1 2 1 2 4" W ELEC. ROOM E101 MECH. ROOM M101 1 2 2 1 6 6 6 7 7 1" CW 1" CW 5 1" CW 1" CW 1" CW 1" CW 1" CW 1" CW1" CW 1" CW FLOOR CONTROL VALVE, FLOW SWITCH AND TEST/ DRAIN 8 1"CW 1"CW 1"CW 2"CW 2"CW 2"CW 2"CW 2"CW 2"CW 1 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P121BUILDING PLUMBINGPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 VENT STACK. 3 4" WASTE STACK. 4 4" WASTE UP. 5 3/4" COLD WATER RISER. 6 6" STORM RISER. 7 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 8 TO SPRINKLER SYSTEM FOR 1ST, 2ND, 3RD, AND 4TH FLOORS. 1/8" = 1'-0" BUILDING B PLUMBING FIRST FLOOR PLAN1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21