Loading...
HomeMy WebLinkAboutP122 - BUILDING PLUMBING PLANS - BUILDING BUNIT B2 202 UNIT B2 201 UNIT A4 204 UNIT A1 205 UNIT A2 207 UNIT A2 209 UNIT A2 210 UNIT A2 208 UNIT A1 IDD 206 UNIT A1 IDD 212 UNIT A1 IDD 211 UNIT A4 213 UNIT B2 215 UNIT B2 216 ELEC. ROOM E201 MECH. ROOM M201 MECH. ROOM M202 ELEC. ROOM E202 4 1 2 1 2 4 1 2 1 2 1 2 4 3 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 3 1 2 4 1 2 4 1 2 4 1 2 4 4 1 2 1 2 4 12 1 2 6 555 6 1 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P122BUILDING PLUMBINGPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT STACK. 3 3" WASTE STACK. 4 3/4" COLD WATER RISER. 5 6" STORM RISER. 6 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 1/8" = 1'-0" BUILDING B PLUMBING SECOND FLOOR PLAN1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 07/08/21