Loading...
HomeMy WebLinkAboutP123 - BUILDING PLUMBING PLANS - BUILDING BUNIT B2 302 UNIT B2 301 UNIT A4 304 UNIT A1 305 UNIT A2 307 UNIT A2 308 UNIT A2 309 UNIT A2 310 UNIT A1 IDD 312 UNIT A1 IDD 311 UNIT A4 313 UNIT B2 316 UNIT B2 315 UNIT A1 306 ELEC. ROOM E301 MECH. ROOM M301 MECH. ROOM M302 ELEC. ROOM E302 4 1 2 1 2 4 1 2 1 2 1 2 4 3 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 1 2 4 4 12 1 2 4 1 2 1 2 6 55 5 6 1 1 1 1 3 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P123BUILDING PLUMBINGPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT STACK. 3 3" WASTE STACK. 4 3/4" COLD WATER RISER. 5 6" STORM RISER. 6 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 1/8" = 1'-0" BUILDING B PLUMBING THIRD FLOOR PLAN 1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21