Loading...
HomeMy WebLinkAboutP130 - BUILDING PLUMBING PLANS - BUILDING C8" WASTE I.E. 95.62 SEE CIVIL ENG. DRAWINGS FOR CONTINUATION SEE CIVIL ENG. DRAWINGS FOR CONTINUATION 8" STORM I.E. 95.62 8" ST 6" ST 6" ST ECO 1 1 1 1 2 1 1 1 1 1 1 2 1 1 2"W 2"W 2" W 2" W 2" W 4" W 4" W 3"W 3" W 2"W 2"W 2" W 2" W 2" W 4" W 4" W 3"W 3" W 2" W 2" W 2" W 2"W 2"W 3"W 2"W 2"W 2" W 2" W 2" W 4" W 4" W 3"W 3" W 2"W 2"W 2" W 2" W 2" W 4" W 4" W 3"W 3" W 2" W 2"W2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 2" W 2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 2" W 2"W2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 2" W 2"W 2"W 2" W 2" W 4" W 2" W 2"W 2"W 2"W 2" W 2" W 4" W 3"W 2" W 2"W 2"W 2" W 2" W 4" W 3" W 2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 1 3" W 2" W 2"W 2" W 1 3"W3"W 1 3" W 6" ST 6" ST 3 6" ST 1 2" W 2"W 2" W 2"W 3 1 2"W 2"W 2" W 2" W 4" W 3"W 2" W 2"W 3" W 2" W 2"W 2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 2" W 2"W 2"W 2"W 2" W 2" W 2" W 4" W 3"W 3" W 2"W 2" W 2" W 4" W 3"W 3" W 1 2" W 2"W 2"W 2"W 2" W 2" W 3"W 3" W 1 2" W 2"W 3 4" W 1 PIPE SLEEVE PIPE SLEEVE PIPE SLEEVE PIPE SLEEVE 4" W 4" W 4" W 4" W 4" FD 4" FD 4" FD 4" CW 6" F 4"CW UP 4"F UP PIPE SLEEVE PIPE SLEEVE SEE CIVIL ENG. DRAWINGS FOR CONTINUATION ECO 8" W 2"W 8" W 6" W 6" W 6" W 6" W 2"W 2"W 3"W 2"W 3"W 2"W 8" ST 4" W 4" W 4" R 4" R 4" R 4" R 4" R 3" W 5 5 2"W 5 5 4" R 4" R 4" R 4" R 4" R 4" R 4" R 4" R 4" R 4" R 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P130BUILDING PLUMBINGPLANS -BUILDING CNORTH ENDAPARTMENTSCARMEL, IN1/8" = 1'-0" BUILDING C UNDERSLAB PLUMBING PLAN1 SHEET KEYNOTES 1 4" WASTE UP. 2 3" WASTE UP. 3 6" STORM UP. 4 VAPOR MITIGATION AIR CHANNELING MATERIAL, VAPORMAT OR ENGINEERED EQUIVALENT. SCHEDULE 40, 4-INCH PVC. AIR CHANNELING MATERIAL IS TO BE INSTALLED ON TOP OF THE LAST LAYER OF BACKFILL AND UNDERNEATH THE SEALED VAPOR BARRIER. THE AIR CHANNELING MATERIAL IS TO BE INSTALLED ON THE INSIDE PERIMETER OF THE FOUNDATION FOOTING. 5 VAPOR MITIGATION RISER. 4-INCH SCHEDULE 40 PVC. # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 1 GENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION 07/08/21