Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P131 - BUILDING PLUMBING PLANS - BUILDING C
FIRE PUMP (FP-1) JOCKEY PUMP (JP-1) FIRE PUMP CONTROLLER JOCKEY PUMP CONTROLLER DOMESTIC BOOSTER PUMP (DBP-1) WATER METER DOUBLE CHECK VALVE ASSEMBLY (DCVA-1) FIRE MAIN ECO 2 1 2 1 5 2 1 21 5 2 1 4 52 1 5 2 1 5 2 1 5 2 1 5 2 1 5 2 1 5 2 1 5 2 1 5 2 1 2 1 5 5 2 1 2 1 5 2 1 4 1 3 1 ECO RISER ROOM R101 FIRE PUMP TEST HEADER FDC BACKFLOW PREVENTER (RPBP-1) 4" W 7 7 7 FD-3 FD-2 FD-2 1" CW 1" CW 1" CW 2" CW 2" CW 1" CW 1" CW 2" CW 1" CW 1" CW 1" CW1" CW 1" CW 1" CW 1" CW 1" CW 8 1" CW 3" W 1 1 3 6 1 1 8 10 10 10 10 9 1" CW 2" CW 2" CW 1 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P131BUILDING PLUMBINGPLANS - BUILDING CNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT UP. 3 4" WASTE UP. 4 3" WASTE STACK. 5 3/4" COLD WATER RISER. 6 3/4" COLD WATER DOWN IN WALL TO SERVE UNIT. 3/4" COLD WATER UP IN WALL ABOVE. 7 6" STORM RISER. 8 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 9 TO SPRINKLER SYSTEM FOR 1ST, 2ND, 3RD, AND 4TH FLOORS. 10 VAPOR MITIGATION RISER. 4-INCH SCHEDULE 40 PVC. 1/8" = 1'-0" BUILDING C PLUMBING FIRST FLOOR PLAN 1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21