Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P132 - BUILDING PLUMBING PLANS - BUILDING C
UNIT A4 203 UNIT B1 207 UNIT A2 IDD 209 UNIT A2 211 UNIT B1 206 UNIT A2 IDD 208 UNIT A2 IDD 210 UNIT A1 212 UNIT A1 213 UNIT A4 215 UNIT B2 217 UNIT B2 216 MECH. ROOM M201 ELEC. ROOM E201 MECH. ROOM M202 ELEC. ROOM E202 2 1 2 1 4 2 1 2 1 4 2 1 3 42 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 2 1 4 4 2 1 2 1 4 2 1 3 4 2 1 4 21 2 1 555 6 6 2 1 1 1 1 1 7 7 7 7 1 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P132BUILDING PLUMBINGPLANS -BUILDING CNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT STACK. 3 3" WASTE STACK. 4 3/4" COLD WATER RISER. 5 6" STORM RISER. 6 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 7 VAPOR MITIGATION RISER. 4-INCH SCHEDULE 40 PVC. 1/8" = 1'-0" BUILDING C PLUMBING SECOND FLOOR PLAN 1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21