Loading...
HomeMy WebLinkAboutP133 - BUILDING PLUMBING PLANS - BUILDING CUNIT A4 303 UNIT A1 IDD 305 UNIT B1 307 UNIT A2 IDD 309 UNIT A2 311 UNIT A1 IDD 304 UNIT B1 306 UNIT A2 IDD 308 UNIT A2 IDD 310 UNIT A1 312 UNIT A1 313 UNIT A4 315 UNIT B2 317 UNIT B2 316 MECH. ROOM M301 MECH. ROOM M302 ELEC. ROOM E302 ELEC. ROOM E301 2 1 2 1 4 2 1 2 1 4 2 1 3 42 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 4 2 1 2 1 4 4 2 1 2 1 4 2 1 3 4 2 1 4 2 1 2 1 555 6 6 2 1 1 1 1 1 7 7 7 7 1 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P133BUILDING PLUMBINGPLANS -BUILDING CNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 4" WASTE STACK. 2 3" VENT STACK. 3 3" WASTE STACK. 4 3/4" COLD WATER RISER. 5 6" STORM RISER. 6 STANDPIPE RISER WITH HOSE VALVE AT INTERMEDIATE LANDING. 7 VAPOR MITIGATION RISER. 4-INCH SCHEDULE 40 PVC. 1/8" = 1'-0" BUILDING C PLUMBING THIRD FLOOR PLAN 1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21