Loading...
HomeMy WebLinkAboutS0-2A-STANDARD FOUNDATION NOTES AND SCHEDULESldh ldh 180° HOOK 2" MIN. CLR 4xdb (2 1 2" MIN.) BAR SIZE #3 #4 #5 #6 #7 #8 #9 #10 #11 #14 f'c = 3,000PSI 9" 11" 14" 17" 20" 22" 25" 28" 31" 37" f'c = 4,000PSI 8" 10" 12" 15" 17" 19" 22" 25" 27" 33" f'c = 5,000PSI 7" 9" 11" 13" 15" 17" 20" 22" 24" 29" #3 #4 #5 #6 #7 #8 #9 #10 #11 f'c = 3,000PSI 22" 29" 36" 43" 63" 72" 81" 91" 101" f'c = 4,000PSI f'c = 5,000PSI FY = 60,000PSI, NON-EPOXY COATED, NORMAL WEIGHT CONCRETE TOP BARS 17" 22" 28" 33" 48" 55" 62" 70" 78" OTHER BARS #14 121" 93" 19" 25" 31" 37" 54" 62" 70" 79" 87" TOP BARS 15" 19" 24" 29" 42" 48" 54" 61" 67" OTHER BARS 105" 81" 17" 22" 28" 33" 49" 55" 63' 70" 78" TOP BARS 13" 17" 22" 26" 37" 43" 48" 54" 60" OTHER BARS 94" 72" 2" MIN. CLR BAR SIZE f'c = 6000PSI f'c = 7,000PSI f'c = 8,000PSI 6" 8" 10" 12" 14" 16" 18" 20" 22" 27" 6" 8" 9" 11" 13" 15" 17" 19" 21" 25" 5" 7" 9" 10" 12" 14" 16" 17" 19" 23"dbBØf'c = 6,000PSI 15" 20" 25" 31" 44" 51" 57" 64" 71" TOP BARS 12" 16" 20" 24" 34" 39" 44" 49" 55" OTHER BARS 86" 66" f'c = 7,000PSI 14" 19" 24" 28" 41" 47" 53" 59" 66" TOP BARS 12" 15" 18" 22" 32" 36" 41" 46" 51" OTHER BARS 79" 61" f'c = 8,000PSI 13" 18" 22" 26" 38" 44" 49" 56" 62" TOP BARS 12" 14" 17" 20" 30" 34' 38" 43" 48" OTHER BARS 74" 57" BAR #3 #4 #5 #6 #7 #8 #9 #10 #11 f'c = 3,000PSI 22" 29" 37" 43" 63" 72" 81" 91" 102" f'c = 4,000PSI f'c = 5,000PSI SIZE CLASS A 29" 38" 47" 56" 82" 94" 106" 119" 132" 20" 25" 32" 38" 55" 63" 71" 80" 87" 25" 33" 41" 48" 71" 81" 91" 103" 104" 17" 22" 29" 34" 48" 56" 63" 71" 78" 22" 29" 37" 43" 64" 72" 82" 91" 102" CLASS B CLASS A CLASS B CLASS A CLASS B f'c = 6,000PSI 16" 21" 26" 32" 45" 51" 58" 64" 72" 20" 26" 33" 41" 58" 67" 74" 84" 93" CLASS A CLASS B f'c = 7,000PSI 16" 20" 24" 29" 42" 47" 54" 60" 67" 19" 25" 32" 37" 54" 61" 69" 77" 86" CLASS A CLASS B f'c = 8,000PSI 16" 19" 22" 26" 39" 45" 50" 56" 63" 17" 24" 29" 34" 50" 58" 64" 73" 81" CLASS A CLASS Bdb NOTES FOR SCHEDULES ABOVE: 1. THE FOLLOWING ASSUMPTIONS HAVE BEEN MADE IN PREPARING THE SCHEDULE: fy = 60 KSI, CONCRETE WEIGHT IS 150 PCF, AND NON EPOXY COATED BARS. IF CONDITIONS VARY FROM THAT NOTED ABOVE, ADJUSTMENTS SHALL BE MADE TO SCHEDULED VALUES IN ACCORDANCE WITH ACI 318. 2. ADJUSTMENT VALUES FOR BARS WITH A CLEAR COVER OF LESS THAN 2.0 X db AND A CLEAR SPACING BETWEEN BARS OF LESS THAN 4.0 x db ARE NOT INCLUDED ABOVE. FABRICATOR SHALL MAKE SUCH ALLOWANCE IN ACCORDANCE WITH ACI 318. 3. TOP BARS SHALL BE DEFINED AS BARS WITH MORE THAN 12" OF FRESH CONCRETE CAST BELOW THE BAR - THIS IS ONLY APPLICABLE FOR BARS THAT RUN HORIZONTALLY. 4. TENSION LAP LENGTHS SHOWN ARE FOR TOP BARS: FOR OTHER BARS DIVIDE VALUES SHOWN BY 1.316db (#3 THRU #8)17db (#9,#10,#11)18db (#14,#18)BØ = 6Xdb (#3 THRU #8) 90° HOOK BEND DIAMETER SCHEDULE BØ = 8Xdb (#9, #10, & #11) BØ = 10Xdb (#14 & #18)BØ INTERIOR PLAN MARK ASSOCIATED HOLDOWN U.N.O. NOTES: 1. LARGER FOOTING MAY BE SHOWN ON PLAN IF MORE THAN ONE HOLDOWN IS PRESENT. 2. NO HOLDOWN FOOTING REINFORCEMENT IS REQUIRED OTHER THAN GRADE BEAM OR GRAVITY FOOTING REINFORCEMENT THAT MAY BE PRESENT IN THE SAME AREA. 3. HOLDOWN FOOTING TO BE CENTERED ON HOLDOWN ANCHOR EXCEPT WHERE SLAB EDGE PREVENTS THIS. 4. RE: SHEARWALL PLAN(S) FOR HOLDOWN LOCATIONS. H2 HF2 HF# FOOTING H3 HF3 H4 HF4 H5 HF5 H6 HF6 EXTERIOR FOOTING DEPTH (FROM TOP OF SLAB)HF#WIDTHWIDTHWIDTHWIDTHHF# FOOTING MARK (TYP.) WIDTHWIDTH HOLDDOWN ANCHOR HOLDOWN ANCHOR H1 0' - 9" HF1 HOLDOWN ANCHOR SLAB ON GRADE HOLDOWN FOOTING SCHEDULE 0' - 11" 1' - 0" 1' - 4" 1' - 8" 0' -11" 1' - 2" 1' - 4" 1' - 10" 2' - 1" 2' - 1" FOOTING WIDTH (PLAN DIMENSIONS) 1' - 0" 1' - 6" 2' - 0" 2' - 6" 3' - 0" 3' - 6" PLAN VIEW INTERIOR CONDITION PLAN VIEW EXTERIOR EDGE CONDITION PLAN VIEW EXTERIOR CORNER CONDITION 1' - 11" EDGE OF SLAB, DROP, OR CONST. JOINT HF#WIDTH WIDTH HOLDOWN ANCHOR PLAN VIEW INTERIOR CORNER CONDITION THICKENED SLAB; RE: SCHEDULE ON DETAILS PAGE. FOUNDATION LEGEND DROP DROP W/ SLOPE SLOPE / RAMPSLAB DEPRESSION (VERIFY W/ ARCH.) -X"TOP OF CONCRETE RELATIVE TO 0'-0" (CONSTANT SLOPE BETWEEN TAGS W/ DIFFERING ELEVATIONS) STONE OR BRICK LEDGE (U.N.O. RE. ARCH.) CURB WALL C.W. S.W.STEM WALL R.W.RETAINING WALL SLAB DROP/SLOPE BELOW F.F.E. 1. THESE DRAWINGS HAVE BEEN PREPARED UNDER THE PRESUMPTION OF A FINISHED LEVEL GRADE AROUND THE ENTIRE FOUNDATION THAT IS 8" BELOW THE TOP OF SLAB (U.N.O. ON PLAN) BASED ON INFORMATION PROVIDED TO THE ENGINEER ABOUT THE SITE. IF THE GRADE AROUND THE STRUCTURE IS OTHER THAN THIS, OR IF IT VARIES, THE ENGINEER MUST BE NOTIFIED OF THIS AS THE DESIGN OF THE FOUNDATION MAY BE AFFECTED AND STEM WALLS OR RETAINING WALLS MAY BE REQ'D. DO NOT SLOPE GRADE AWAY FROM BUILDING STEEPER THAN 5 HORIZONTAL TO 1 VERTICAL W/ GEOTECHNICAL ENGINEER APPROVAL AND VERIFICATION THAT BEARING CAPACITY SETTLEMENT LIMITS AND GLOBAL STABILITY DESIGN IS NOT ADVERSELY AFFECTED. 2. CONTRACTOR SHALL VERIFY ALL SLAB DIMENSIONS, DROPS, AND SLOPES PRIOR TO THE PLACEMENT OF CONCRETE. ANY DISCREPANCY BETWEEN THESE PLANS AND ARCHITECTURAL PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY. ADDITIONAL SLAB REINFORCEMENT DETAILS (NOT SHOWN IN PLAN) 45°0 '1 1/2"CLEAR1 12 "SEPARATIONEXTERIOR OF SLAB OR LOW SIDE OF DROP EXTERIOR EDGE OF SLAB OR DROP EXTERIOR EDGE OF BRICK LEDGE 2~#4 BARS X 5'-0" LONG, CENTER ON CORNER, 1 1/2" CLEAR FROM TOP OF SLAB WHEN PRESENT PLAN VIEW NOTE: BARS SHOWN MUST BE PROVIDED AT ALL RE-ENTRANT CORNERS AT EXTERIOR EDGES AND RE-ENTRANT CORNERS AT DEPRESSIONS GREATER THAN 2" RE-ENTRANT STEEL REQUIRED AT DROP AND EDGE CORNERS STANDARD SLAB ON GRADE FOUNDATION NOTES AND SCHEDULES NTS S0-2A SHEET NUMBER NORTH END APARMENTS SMOKY ROW ROAD & U.S. 31 CARMEL,IN ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.003.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.10.26 DESIGN DEVELOPMENT DZ / MD 2020.12.04 PERMIT SET DZ / MD 2021.01.15 BID DOCUMENTS DZ / MD 04/15/22