HomeMy WebLinkAboutS0-2B-STANDARD WOOD FRAMING NOTES AND SCHEDULESDECKING ATTACHMENT SCHEDULE
LOCATION NAIL SIZE OPTION BOUNDARY NAILING FIELD NAILING
0.131" OR 8d 6" O.C. 6" O.C.
6" O.C.12" O.C.
OR 10d RING-SHANK 4" O.C.6" O.C.
PANEL EDGE BLOCKING
UNBLOCKED
BLOCKED
UNBLOCKED
BASIC FLOORS
(TYP. U.N.O.)
ROOFS
BLOCKED FLOORS
(WHERE NOTED ON PLAN)
OR 10d RING SHANK
0.131" RING-SHANK
0.148" RING-SHANK
NOTES:
1. NAIL LENGTH CHOICE MUST PROVIDE A MINIMUM PENETRATION OF 1-3/4" INTO ROOF FRAMING MEMBERS AND 1-1/2" INTO FLOOR FRAMING
MEMBER. (SUBTRACT THICKNESS OF DECKING USED FROM NAIL LENGTH.)
2. ALL BLOCKED DIAPHRAGMS TO HAVE ALL PANEL EDGES BLOCKED W/ MIN. 2X4 MATERIAL AND NAILED PER BOUNDARY NAILING
REQUIREMENT.
3. "BOUNDARY NAILING" REFERS TO NAILING REQUIRED ALONG ALL THE EDGES OF EACH DECKING PANEL. AT ALL CHANGES IN PLANE ALL
DECKING EDGES MUST BE FULLY BLOCKED WITH ADJOINING/OVERLAPPING BLOCKINGTHAT IS ALSO STITCHED TOGETHER WITH BOUNDARY
NAILLING.SEE FRAMING DETAILS FOR ADDITIONAL LOCATIONS THAT REQUIRE BOUNDARY NAILING AND/OR BLOCKING.
4. "FIELD NAILING" REFERS TO NAILING REQUIRED ALONG ALL INTERMEDIATE SUPPORTS UNDER EACH DECKING PANEL SHEET.
5. AT ROOTS, CUT NAIL SPACING IN HALF AT OVERHANGS AND WITHIN ASCE ZONE 3 (CORNERS).
6. ADDITIONALLY GLUE FLOOR DECKING WHEN REQUIRED BY ARCHITECT.
STANDARD WOOD CONNECTION
DESCRIPTION OF BUILDING ELEMENT NAIL OPTION
JOIST TO SILL OR GIRDER, TOENAIL 3~8d
SOLE OR TOP (BOTTOM PLY) PLATE 2~16d
STUD TO SOLE PLATE, TOENAIL 4~8d
BUILT-UP STUD PACKS, FACE NAIL
JOIST OR RAFTER BLOCKING TO 3~8d
RIM JOIST TO TOP PLATE, TOENAIL 8d @ 6" o.c.
TOP PLATE CORNER/INTERSECTION
CEILING JOIST TO TOP PLATE,3~8d
CONTINUOUS HEADER TO STUD,4~8d
CEILING JOIST LAPS AND RAFTER 3~16d
RAFTER TO PLATE, TOENAIL 3~8d
BUILT-UP CORNER STUDS,16d @ 24" o.c.
NAIL OPTION
3
3
4
3
6" o.c.
3
4
4
3
@ 16" o.c.
BRIDGING TO JOIST, TOENAIL 2~8d 2
SOLE PLATE ANCHORAGE SEE SCHEDULE SEE SCHEDULE
TOP PLATE SPLICE NAILING, SEE TYPICAL SEE TYPICAL
2~16d 3
BUILT-UP 2X HEADERS AND BEAMS
COLLAR TIE TO RAFTER, TOENAIL
JACK RAFTER TO HIP, TOENAIL 3~10d 4
3~10d 4
JACK RAFTER TO HIP, FACE NAIL 2~16d 3
RAFTER TO RIDGE BEAM, TOENAIL 2~16d 3
RAFTER TO RIDGE BEAM, FACE NAIL 2~16d 3
JACK RAFTER TO HIP, FACE NAIL 2~16d 3
JOIST TO RIM/BAND JOIST, END NAIL 3~16d 4
Pennyweight Diameter Length
6d 0.113" 2"
8d 0.131" 2 1/2"
10d 0.148" 3"
16d 0.162" 3 1/2"
TOP PLATE PLY NAILING, FACE NAIL 16d @16" o.c. 12" o.c.
10d @ 12" o.c. @ 8" o.c.
2X RIBBON TO END OF FLOOR 2~16d 3
TOP CHORD OF ROOF TRUSSES,2~16d 3
COMMON 0.131"X3"
ON PLANS ON PLANS
DETAIL DETAIL
TO STUD, END NAIL
TOP PLATE, TOENAIL
LAPS, FACE NAIL
LAPS, FACE NAIL
FACE NAIL
TOENAIL
TOENAIL
FACE NAIL
TRUSS, FACE NAIL
TOENAIL
NOTES:
1. PENNY SIZES ARE FOR COMMON NAILS (NOT SINKER OR BOX) AND
ARE DEFINED AS FOLLOWS:
2. ANY DESCRIPTION OF BUILDING ELEMENTS NOT NOTED ABOVE MAY
BE FOND IN THE IBC, TABLE 2304.9.1.
3. SEE ICC ESR-1539 FOR ALL ADDITIONAL FASTENER REQUIREMENTS
NOT NOTED HERE.
4. WHERE CONNECTION IS MADE TO FRT LUMBER ADD ADDITIONAL
NAIL.
FASTENING SCHEDULE
SEE SCHEDULE SEE SCHEDULE
COLUMN SCHEDULE
MARK
SP326
SP426
WP44
WP46
WP66
PC44
PC46
PC48
(3) 2X6 STUD PACK
(4) 2X6 STUD PACK
4X4 WOOD POST
4X6 WOOD POST
6X6 WOOD POST
PC66
SC1
PC68
PODIUM
3RD FLOOR"@3" COLUMNS SUPPORT ROOF FRAMING
"@2" COLUMNS SUPPORT 3RD FLOOR FRAMING
ROOF
AT HEADERS AND DROP BEAMS
KING/JACK STUD REQUIREMENTS
-
SP224 (1) KING & (1) JACK
SP324
SP424
(3) 2X4 STUD PACK
(4) 2X4 STUD PACK
(2) KING & (1) JACK
(2) KING & (2) JACK
LEGEND FOR MULTIPLE LEVEL COLUMN CALL-OUTS (2-STORY)
NOTE: WHERE ONLY ONE LEVEL IS BEING SHOWN BY A FRAMING
PLAN, THE COLUMNS DO NOT HAVE AN "@" NOTATION AND ARE
SIMPLY LOCATED IN THE ARCHITECTURAL BACKGROUND WALLS
SHOWN, WHICH ARE BELOW THE FRAMING SHOWN ON THAT PLAN.
SP524 (5) 2X4 STUD PACK (3) KING & (2) JACK
SP526 (5) 2X6 STUD PACK
(2) KING & (1) JACK
(2) KING & (2) JACK
(3) KING & (2) JACK
XXXRE: SCHED.
XXX
BEAM SIZE
SC2 -
LEGEND COLUMN SIZE
(TYPICAL EA. END UNLESS
NOTED OTHER WISE.
SC3 -
COLUMN TYPE & SIZE
(2) 2X4 STUD PACK
SP624 (6) 2X4 STUD PACK (4) KING & (2) JACK
SP226 (1) KING & (1) JACK(2) 2X6 STUD PACK
SP626 (6) 2X6 STUD PACK (4) KING & (2) JACK
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
SP528 (5) 2X8 STUD PACK (3) KING & (2) JACK
SP428 (4) 2X8 STUD PACK (2) KING & (2) JACK
SP328 (3) 2X8 STUD PACK (2) KING & (1) JACK
SP228 (1) KING & (1) JACK(2) 2X8 STUD PACK
SP628 (6) 2X8 STUD PACK (4) KING & (2) JACK
RP88 8 X 8 REALPOST -
PROVIDE COLUMN
MATCHING & CONCENTRIC
W/ COLUMN ABOVE.
PACK UP ONLY
COLUMN / STUDCOL.U.C.
A
.
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
NOTES:
1. STUD PACKS SHALL MATCH WALL STUDS IN DEPTH, SPECIES, AND
GRADE.
2. RE: STANDARDS FOR TYPICAL LOAD BEARING HEADER/BEAM
SUPPORT DETAIL FOR MIN. STUD PACKS SIZES. IN NO CASE SHALL
BEAMS, HEADERS, OR GIRDER TRUSSES BE SUPPORTED BY LESS
THAN A DOUBLE STUB PACK.
3. SHEATHING SHALL BE NAILED TO ALL COLUMNS LOCATED WITHIN A
WALL.
4. ORIENT COLUMN AS REQUIRED TO MATCH WALL WIDTH. STUD
PACKS MUST BE ORIENTED SUCH THAT THE 2X ENDS WILL HAVE
SHEATHING NAILED INTO THEM.
5. EXTEND FLUSH BEAMS FULLY OVER ENTIRE COLUMN; EXTEND
HEADERS AND AND DROP BEAMS FULLY ONTO JACK STUDS/POST.
6. SEE TYPICAL DETAILS FOR STUD PACK NAILING DETAIL.
7. WHERE OPENINGS OCCUR AT AN EXTERIOR WALL, THE STUD PACK
SIZE SHALL BE EQUAL TO THE NUMBER OF STUDS REQUIRED TO
COVER HALF OF THE OPENING'S SPAN BASED SCHEDULED WALL STUD
SPACING. U.N.O. IN PLAN.
8. ALL STANDALONE POSTS TO HAVE CAPS, STRAPS, AND BASES AS
PER TYPICAL STANDALONE POST DETAILS ON THE STANDARDS.
9. COLUMN MATERIAL OR GRADE MAY NOT BE CHANGED WITHOUT
PRIOR APPROVAL FROM E.O.R.
10. AT FLUSH BEAM LOCATIONS, INSTALL ALL OF THE POST OR STUD
PACK PLYS UNDER THE BEAM.
11. ALL COLUMNS PRESENT AT ROOF OR ANY OTHER LEVEL MUST
CONTINUE DOWN THROUGH ALL FRAMING LEVELS BELOW, IN
ADDITION TO ANY COLUMN CALLOUTS SHOWN.
12. COLUMN SIZES ARE TYPICALLY SHOWN ONLY ON ONE END OF
HEADERS / BEAMS. COLUMN SIZE SHALL BE THE SAME AT OPPOSITE
END U.N.O.
13. REALPOST TO BE SPF#2 MANUFACTURED BY WOODTONE &
INSTALLED IN ACCORDANCE W/ THEIR RECOMMENDATIONS.
14. REFERENCE LUMBER SPECIFICATIONS FOR REQUIRED DESIGN
VALUES FOR LUMBER, PARALLAM (PSL) AND GLULAM (GL) COLUMNS.
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
PC88
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
INSTALL POST AS TRIMMER
AND ADD (2) 2x KING
TBD
TBD
TBD
U.N.O. IN PLAN
3 1 2" X 3 1 2" PSL OR GL
3 1 2" X 5 1 4" PSL OR GL
3 1 2" X 7" PSL OR GL
5 1 4" X 5 1 4" PSL OR GL
5 1 4" X 7" PSL OR GL
7" X 7" PSL OR GL
FOUNDATION
2ND FLOOR
3RD FLOOR
4TH FLOOR"@4" COLUMNS SUPPORT ROOF FRAMING
"@3" COLUMNS SUPPORT 4TH FLOOR FRAMING
"@2" COLUMNS SUPPORT 3RD FLOOR FRAMING
"@1" COLUMNS SUPPORT 2ND FLOOR FRAMING
ROOF
LEGEND FOR MULTIPLE LEVEL COLUMN CALL-OUTS (4-STORY)
NOTE: WHERE ONLY ONE LEVEL IS BEING SHOWN BY A FRAMING
PLAN, THE COLUMNS DO NOT HAVE AN "@" NOTATION AND ARE
SIMPLY LOCATED IN THE ARCHITECTURAL BACKGROUND WALLS
SHOWN, WHICH ARE BELOW THE FRAMING SHOWN ON THAT PLAN.
COLUMN / STUD
OR PODIUM
FLOOR FRAMING NOTES
1. THE BACKGROUND SHOWN IS THE FLOOR BELOW IN ORDER TO
SHOW THE BEARING WALLS REQUIRED TO SUPPORT THE
REFERENCED FLOOR FRAMING.
2. GENERAL FLOOR FRAMING IS SHOWN ON THE MAIN FLOOR FRAMING
SHEETS. FRAMING FOR REPETITIVE OR COMPLICATED FRAMING
AREAS SUCH AS UNITS OR PUBLIC ROOMS IS SHOWN ON THE UNIT
FRAMING SHEETS AS REFERENCED BY UNIT FRAMING TAGS.
3. ALL INTERMEDIATE STAIR LANDINGS ARE LOCATED BETWEEN THE
REFERENCED FLOOR FRAMING AND THE FLOOR BELOW.
4. 2x6 STRONGBACKS SHALL BE USED ON ALL TRUSSES WITH SPANS
LONGER THAN 10'-0" SEE STANDARD FRAMING DETAILS FOR
STRONGBACK REQUIREMENTS.
5. THE STABILITY OF THE FLOOR WILL NOT BE ACHIEVED UNTIL THE
DECKING HAS PROPERLY BEEN INSTALLED AND FASTENED TO THE
TRUSSES IN ACCORDANCE WITH THE DECKING NAILING SCHEDULE
SHOWN BELOW.
6. SHEAR BLOCKING AND DRAG TRUSSES MUST BE PROVIDED BY
TRUSS MANUFACTURER ABOVE SHEARWALLS. SEE THE ASSOCIATED
SCHEDULE AND DETAILS ON THE STANDARD FRAMING DETAILS SHEET.
7. ALL TRUSSES SHOWN ON UNIT FRAMING PLANS ARE FT-1 @24" O.C.
U.N.O. AND ALL TRUSSES SHOWN ON MAIN FLOOR FRAMING PLANS
ARE CT-1 @24" O.C. U.N.O. SEE TRUSS LOADING SCHEDULE FOR
FURTHER INFORMATION.
8. TRUSS LOCATIONS ARE REPRESENTATIVE BASED ON SPAN AND
SPACING. FRAME TRUSSES AROUND PLENUMS WHERE NECESSARY.
TRUSS SPACING NOT TO EXCEED SPACING SHOWN ON PLANS.
RE: MEP FOR PLENUM LOCATIONS.
9. BEARING WALLS ARE INDICATED IN PLAN WITH THE FOLLOWING
HATCH: . ALL EXTERIOR WALLS REGARDLESS OF
HATCHING AND ALL LOAD BEARING INTERIOR WALLS SHALL BE
CONSTRUCTED PER THE LOAD BEARING STUD WALL SCHEDULE. ALL
SHEAR WALLS NOT MARKED AS LOAD-BEARING SHALL BE
CONSTRUCTED AT A MINIMUM WITH 2x4 @ 16" O.C.
UNIT FRAMING REFERENCE LEGEND
A2
A1
S0-4
UNIT ABOVE (NOT SHOWN)
UNIT BACKGROUND SHOWN
UNIT FRAMING SHEET SERIES
NOTE:
VERIFY ALL UNIT LOCATIONS AND ORIENTATIONS WITH
ARCHITECTURAL DRAWINGS
STEEL FRAMING LEGEND
W18 X 46 (+18)
(24K)(24K)
AISC SHAPE UNFACTORED
END REACTION
TOP OF STEEL RELATIVE
TO PLATE HEIGHT OF TYPICAL
WOOD WALLS IN SAME AREA
(+18" U.N.O.)
SUPPORTING
BEAM
NOTE: ALL SIZES AND REACTIONS SHOWN HERE ARE FOR GRAPHIC
SAMPLE PURPOSES ONLY, REFER TO PLAN FOR PROJECT RELEVANT
INFORMATION.
SC1
STEEL COL,
RE: SCHED
XXXLL / XXXDL
TRANSFER TRUSS LEGEND
/SEC. A A2x BLOCKING
AS REQUIRED
(2) 2x8 U.W.A. W/ HU28-2 (MAX)
AT EA. END (NOT SHOWN ON
PLAN), ONLY REQUIRED AT
TRUSS SPACINGS GREATER
THAN 16" O.C.
SEC. A / AXXXL L / X XXDLPLAN VIEW
NOTES:
1. DESIGN TRUSSES FOR POINT LOAD AND/OR LINE LOAD TRIBUTARY
IN ADDITION TO SCHEDULED LOADS.
2. TRUSS MANUFACTURER SHALL DESIGN TRUSSES TO SUPPORT
LOADS SHOWN ON PLAN.
3. TRUSS MANUFACTURER MAY ADJUST SPACING OR PROVIDE BEAMS
IF REQUESTED AND APPROVED BY ENGINEER OF RECORD.
4. TRUSS MANUFACTURER SHALL NOTIFY ENGINEER OF RECORD
DURING BIDDING IF TRUSSES ARE NOT ABLE TO BE DESIGNED AS
SHOWN.
5. TRUSSES USED AS TRANSFER ELEMENTS UNDER POINT LOADS
SHALL BEAR ON SP224 OR SP226 MIN. U.N.O. ON PLAN.
LIVE LOAD POINT
LOAD (LBS)
DEAD LOAD POINT
LOAD (LBS)
PROVIDE TRUSS
UNDER EACH POINT
LOAD ( NOT SHOWN
IN PLAN)
DEAD LOAD LINE
LOAD (PLF)
LIVE LOAD LINE
LOAD (PLF)SPAN DIRECTIONSTUD PACK /
COLUMN UP
OUTLINE OF WALL ABOVE
PROVIDE QUADRUPLE SYP
OR DFL VERTICALS IN TRUSS
FOR BLOCKING CONNECTION
AT TRUSS SPACINGS
GREATER THAN 16" O.C.
BEAM & HEADER SCHEDULE
MARK
226
228
2210
2212
326
328
3210
3212
410
2~2x6
2~2x8
2~2x10
2~2x12
3 1 2" x 9 1 4 " PSL OR GL
3 1 2" x 11 7 8 " PSL OR GL
3 1 2" x 14" PSL OR GL
3 1 2" x 16" PSL OR GL
3 1 2 " x 18" PSL OR GL
5 1 4" x 9 1 4 " PSL OR GL
412
414
5 1 4 " x 117 8 " PSL OR GL
5 1 4" x 14" PSL OR GL
416
418
5 1 4 " x 16" PSL OR GL
610
612
5 1 4 " x 18" PSL OR GL
614
7" x 11 7 8" PSL OR GL
616
7" x 14" PSL OR GL
618
7" x 16" PSL OR GL
712
7" x 18" PSL OR GL
PLAN LEGEND
3~2x8
3~2x10
3~2x12
3~2x6
714
716
718
SIZE SIZEMARK
- HEADER OR DROP BEAM - FLUSH BEAM
3 1 2" x 7 1 4" PSL OR GL 48
5 1 2" x 7 1 4" PSL OR GL68
7" x 9 1 4" PSL OR GL710
NOTES:
1. CONVENTIONAL HEADERS SHALL HAVE FULL SIZE 1/2" PLYWOOD
FLITCHES BETWEEN EACH PLY WHEN FRAMED INTO WALLS.
2. TRUSS MANUFACTURER MAY SUBSTITUTE BEAMS WITH DESIGN
COMPONENTS.
3. SEE MULTI-PLY CONVENTIONAL LUMBER BEAM CONNECTION
SCHEDULE FOR BUILT BEAM CONSTRUCTION. DO NOT SPLICE PLYS.
4. BEAM MATERIAL AND GRADE MAY NOT BE CHANGED WITHOUT
PRIOR APPROVAL FROM E.O.R.
5. RE: LUMBER SPECIFICATIONS FOR REQUIRED DESIGN VALUES FOR
LUMBER, PARALLAM (PSL) AND GLULAM (GL) BEAMS.
6. BEAMS SHALL BE SUPPORTED BY STUD PACKS THAT MATCH THE
BEAM WIDTH U.N.O. IN NO CASE SHALL THE BEAM BEARING LENGTH
BE LESS THAN 3 1/2".
7. ALL HEADERS AND BEAMS ARE 228 & 326 FOR 2X4 & 2X6 WALLS
RESPECTIVELY U.N.O.
ROOF FRAMING NOTES
1. BACKGROUND SHOWN IS THE ARCHITECTURAL BACKGROUND OF
THE FLOOR BELOW.
2. TOP CHORD TRUSS SLOPES ARE SHOWN ON THE ARCHITECTURAL
ROOF PLANS.
3. TRUSS FRAMING SHOWN SHALL NOT BE MODIFIED WITHOUT PRIOR
APPROVAL OF THE ENGINEER OF RECORD.
4. TRUSS BEARING POINTS SHALL OCCUR ON BEARING WALLS
INDICATED ON THE PLAN.
5. ROOF AREAS WITH CROSS SLOPES AND DORMERS MUST BE
OVERFRAMED WITH TRUSSES, OR BUILT INTO THE MAIN TRUSSES.
6. INDICATES ROOF TRUSS SPAN DIRECTION.
7. THE BEARING POINTS OF EACH ROOF TRUSS, RAFTER, AND ROOF
SUPPORTING BEAM SHALL BE SECURED AT ALL TRUSS BEARING
LOCATIONS WITH HARDWARE PER THE ROOF FRAMING UPLIFT
HARDWARE SCHEDULE IN ADDITION TO STANDARD BCSI-B8
TOE-NAILING.
8. THE ROOF DECKING THICKNESS AND PROPERTIES ARE NOTED IN
THE DECKING AND SHEATHING SPECIFICATIONS AND ATTACHMENT IS
NOTED IN THE DECKING ATTACHMENT SCHEDULE.
9. CONTINUOUS LATERAL BRACING (CLB) SHALL BE ATTACHED TO
THE INSIDE FACE OF THE TOP AND BOTTOM CHORDS AND SHALL BE
2x4 STUD GRADE DFL SPACED AT 10 FEET ON CENTER. CLB SHALL BE
ATTACHED TO EACH TRUSS WITH 2~16D COMMON NAILS.
10. PERMANENT BRACING (PB) SHALL BE 2x4 STUD GRADE DFL
ATTACHED TO THE INSIDE FACE OF THE TOP AND BOTTOM CHORDS
AND SHALL SPAN DIAGONALLY IN A HORIZONTAL PLANE ACROSS 6
TRUSSES, IF POSSIBLE, AS SHOWN ON PLAN. PB SHALL BE ATTACHED
TO EACH TRUSS WITH 2~16D COMMON NAILS.
11. PERMANENT WEB BRACING (PWB) SHALL BE 2X4 STUD GRADE DFL
ATTACHED TO TRUSS WEBS GREATER THAN 10 FEET IN LENGTH
AND/OR THOSE REQUIRING BRACING PER TRUSS MANUFACTURER
AND SHALL SPAN DIAGONAL IN A VERTICAL PLANE ACROSS 6
TRUSSES, IF POSSIBLE, AS AN 'X'-BRACE. PWB SHALL BE ATTACHED
TO EACH TRUSS WEB WITH 2~16D COMMON NAILS AND REPEATED
EVERY 20 FEET. CLB MEMBERS SHALL ALSO BE APPLIED TO THESE
WEBS THROUGHOUT THE LENGTH OF THE BUILDING.
12. THE STABILITY OF THE ROOF SYSTEM IS NOT ACHIEVED UNTIL
ALL REQUIRED BRACING IS INSTALLED AND THE ROOF DECKING HAS
BEEN FASTENED TO THE TRUSSES. RE: SPECS AND STANDARDS FOR
ROOF BRACING.
13. PROVIDE A STUD PACK BELOW ALL GIRDER TRUSSES MATCHING
THE WIDTH OF THE GIRDER TRUSS. MATCH STUD PACK AT ALL
FLOORS BELOW U.N.O. IN PLAN.
14. ALL ROOF TRUSSES ARE RT-1 @ 24" O.C. U.N.O. EXCEPT UNDER
MECHANICAL UNITS, PLATFORM AREAS, OR WALKWAYS WHICH ARE
RT-2 @ 24" O.C. U.N.O. PER TRUSS LOADING SCHEDULE.
15. ROOF DRAG TRUSS (DT) ARE REQUIRED ABOVE ALL SHEARWALLS
PARALLEL TO ROOF TRUSSES. (RE: STANDARD DETAILS FOR DRAG
TRUSS CONNECTION DETAIL).
16. COORDINATE WITH ARCH. AND MEP FOR ALL CONDITIONS
REQUIRING MODIFICATIONS TO THE TRUSS LAYOUTS AND DESIGN,
INCLUDING, BUT NOT LIMITED TO, ROOF AND ATTIC ACCESSES.
MECHANICAL AREAS, WALKWAYS, DUCTS, AND BOTTOM CHORD
POP-UPS.
17. BEARING WALLS ARE INDICATED IN PLAN WITH THE FOLLOWING
HATCH: . ALL EXTERIOR WALLS REGARDLESS OF
HATCHING AND ALL LOAD BEARING INTERIOR WALLS SHALL BE
CONSTRUCTED PER THE LOAD BEARING STUD WALL SCHEDULE. ALL
SHEAR WALLS NOT MARKED AS LOAD-BEARING SHALL BE
CONSTRUCTED AT A MINIMUM WITH 2x4 @ 16" O.C.
H2.5A 535#
2,250#
6,400# (2) VGT
HDU11 8,030#
-
-
S3
S5
-
-
H3
H4
-
-
HDU8
HDU11
(2) H2.5A 1,070# - --
(2) HTS16
3,555# S2 -VGT
5,170# S3 H2(2) VGT
ROOF FRAMING UPLIFT HARDWARE SCHEDULE
UPLIFT
REACTION
(MAX)
SIMPSON
HARDWARE
COMPANION
HARDWARE
W/ ROD PER
SIMPSON
STRAPPING
@ ALL
FLOORS
HOLDOWN @
FOUNDATION
HTT4
HTT4
HARDWARE REQUIRED FOR
TYPICAL CONDITIONS, U.N.O
MINIMUM HARDWARE FOR TRUSSES,
RAFTERS AND OUTLOOKERS
MIN. HARDWARE FOR SINGLE PLY GIRDER
TRUSSES AND ROOF SUPPORTING BEAMS
MINIMUM HARDWARE FOR
MULTI PLY GIRDER TRUSSES
STUD
PACK
PLYS
(MIN)
1
3
4
2
2
TRUSS
PLYS
(MIN)
1
1
1
1
1
3
4
2
2
NOTES:
1. UPLIFT REACTIONS FOR ALL TRUSSES TO BE DETERMINED BY TRUSS MANUFACTURER & LISTED ON THEIR DESIGN DRAWINGS. FRAMER
MUST INSTALL THE HARDWARE SCHEDULED ABOVE BASED ON THESE UPLIFTS. ALTERNATIVE CLIPPING TO THOSE NOTED, OR ROD SYSTEMS,
MAY BE USED PROVIDED THE CLIPPING/ROD CAPACITY MEETS OR EXCEEDS THE UPLIFT DEMAND.
2. HARDWARE SHOWN IN NOTES COLUMN IS ONLY A MINIMUM, THE FRAMER SHOULD BUDGET A CONTINGENCY AMOUNT FOR ADDITIONAL
CLIPPING, STRAPS, AND HOLDOWNS THAT MAY BE REQUIRED BASED ON THE ACTUAL UPLIFTS PROVIDED BY THE TRUSS MANUFACTURER ON
THEIR SHOP DRAWINGS USING THE ABOVE HARDWARE SCHEDULE.
3. CONTACT EOR FOR TRUSS CONDITIONS OR UPLIFT REACTIONS NOT ADDRESSED BY THE ABOVE SCHEDULE.
4. ALL REACTIONS NOTED ABOVE ARE BASED ON HARDWARE CAPACITIES INTO HF/SPF AND MAY BE INCREASED FOR DF/SYP WHERE
APPLICABLE PROVIDED ALL COMPONENTS INCLUDING STUDS, PLATES, AND TRUSS MEMBERS ARE DFL/SYP.
5. H2.5A CLIPS MAY BE SUBSTITUTED WITH MTS12 1:1 OR WITH SDWC15600 TRUSS SCREWS 1:1 FOR SYP/DF ONLY OR 2:1 FOR SPF/HF.
NOTE THAT THESE ALTERNATES ARE NECESSARY AT CONDITIONS WHERE TRUSSES ARE NOT PERPENDICULAR TO THE SUPPORT.
(MTS12 MAY BE FIELD BENT ONE TIME UP TO 45 DEGREES.)
6. AT SKEWED CONDITIONS THE (2) HTS16 MAY BE FIELD BENT ONE TIME UP TO 45 DEGREES FOR A REDUCED COMBINED CAPACITY OF 2210#
SYP/DF AND 1900# FOR SPF/HF.
7. IN ALL INSTANCES, SDWC15600 TRUSS SCREWS MAY BE INSTALLED AS A SUPPLEMENT TO THE HARDWARE NOTED TO INCREASE THE UPLIFT
CAPACITY 485#s PER SCREW.
8. NOTE THAT GIRDER TRUSSES ARE TRUSSES SUPPORTING ANY OTHER TRUSSES OR THOSE LOCATED UNDER A PARALLEL WALL.
9. INSTALL HTT4 WITH 0.162" x 2 1 2" NAILS MIN. ALL OTHER HARDWARE TO BE INSTALLED AS REQUIRED BY SIMPSON TO ACHIEVE MAXIMUM
CAPACITY.
10. TRUSS AND STUD PACK PLY COUNTS SHOWN ABOVE ARE THE MINIMUM PER UPLIFT HARDWARE REQUIREMENTS ONLY. SEE FRAMING PLANS
AND NOTES, AS WELL AS TRUSS SHOPS, FOR MINIMUMS PLY COUNTS BASED ON TOTAL LOADING, WHICH TYPICALLY WILL GOVERN.
MULTI-PLY CONVENTIONAL LUMBER BEAM CONNECTION SCHEDULE
BEAM WIDTH
NOTES:
1. ALL SIDE LOAD HANGERS TO USE 3" MINIMUM LENGTH FASTENERS INTO CONVENTIONAL SUPPORTING BEAMS. 2-PLY BEAMS DO NOT REQUIRE
ADDITIONAL FASTENERS AT CONCENTRATED LOADS.
2. VALUES SHOWN ARE FOR 12X SYP OR DFL LUMBER, INCLUDING FRT WITH NAILING EXCEPTIONS WHERE SHOWN.
3. STAGGER LOCATION OF FASTENERS ON OPPOSING SIDES OF BEAMS.
4. SDS SCREWS TO BE MANUFACTURED BY SIMPSON STRONG-TIE AND BE 3" LONG, EXCEPT 4-PLY&5-PLY ASSEMBLIES WHICH REQUIRE 4-1/2" & 6"
LONG SCREWS, RESPECTIVELY. 6" MIN END OF BEAM CLEARANCE REQUIRED.
5. 4-PLY & 5-PLY BEAMS MAY ONLY BE SIDE-LOADED WHEN LOADS ARE APPLIED TO BOTH SIDES EXCEPT FOR THROUGH-BOLTED STEEL
STRINGER CONNECTIONS
6. PLYS MAY NO BE SPLICED AT ANY POINT IN SINGLE OR MULTI-SPAN BEAMS.
FASTENING REQUIREMENTS FOR TOP-LOADED BEAMS (MINIMUM FOR ALL BEAMS)
FASTENING REQUIREMENTS FOR UNIFORM SIDE-LOADED BEAMS
BEAM WIDTH 0.131"X3" NAIL SPACING
(PER ROW, PER SIDE)
SDS SCREW SPACING
(PER ROW, PER SIDE)
REQUIRED
FASTENER LOCATIONS
4" O.C. ONE SIDE 2-PLY
SDS SCREW SPACING
(PER ROW, PER SIDE)
0.131"X3" NAIL SPACING
(PER ROW, PER SIDE)
24" O.C.12" O.C.
REQUIRED
FASTENER LOCATIONS
ONE SIDE 2-PLY
24" O.C.12" O.C. BOTH SIDES 3-PLY
24" O.C.N/A BOTH SIDES 4-PLY & 5-PLY
BOTH SIDES 3-PLY
BOTH SIDES
FASTENING REQUIREMENTS FOR CONCENTRATED SIDE-LOADED BEAMS
BEAM WIDTH
# OF 0.131"X3" NAILS
(PER SIDE, NON-FRT/FRT)
# OF SDS SCREWS
(PER SIDE, NON-FRT/FRT)
32 / 40 6 / 6 12 / 14ONE SIDE (BACK) 3-PLY
4 / 6 8 / 10BOTH SIDES 4-PLY
N/A 4 / 6 10 / 12BOTH SIDES 5-PLY
FASTENER LOCATION SCHEMATIC FOR
TOP-LOADED AND UNIFORM SIDE-LOADED CONDITIONS 2" 2"2"2"2" 2"2-PLY 3-PLY 4-PLY 2" 2"(2) ROWS OF
SCHEDULED
FASTENERS
2"2"EQUALLY
SPACED,
1 1 2" MIN.
2",
TYP.
FASTENER LOCATION SCHEMATIC FOR
CONCENTRATED SIDE-LOADED CONDITIONS
REPEAT INSTALLATION OF
SCHEDULED FASTENERS
ON BACK SIDE (WHERE
SCHEDULE CALLS FOR
"BOTH SIDES". INSTALL
ONLY ON BACK SIDE
WHERE SCHEDULE CALLS
FOR "ONE SIDE".)
SCHEDULED FASTENERS, HALF
EA. SIDE OF CONCENTRATED
LOAD EXCEPT WHERE BEAM
LENGTH PREVENTS THIS.
(IN NO CASE IS LESS THAN THE
TOTAL NUMBER OF SCHEDULED
FASTENERS PERMITTED.)
2" AT TOP &
BOTTOM
4-PLY & 5-PLY
4" O.C.
N/A
12" O.C.
12" O.C.
12" O.C.
2X6 & 2X8 BEAMS 2X10 & 2X12 BEAMS 2X6 & 2X8 BEAMS 2X10 & 2X12 BEAMS
14 / 18
N/A
N/A N/A
(5-PLY SIMILAR)
REQUIRED
FASTENER LOCATIONS
WHEN NAILING, PROVIDE AN ADDITIONAL
FASTENER AT MID-DEPTH AT ENDS
a = 10% OF THE LEAST HORIZONTAL DIMENSION OR 0.4h, WHICHEVER IS SMALLER, BUT NOT LESS THAN EITHER
4% OF THE LEAST HORIZONTAL DIMENSION OR 3 FEET
2 2
3
3
5
5
4 4
OPP. SIDE
SIMILAR
1
2
2
2
4
1
2 2
22
3
3
3
4
4
5
5
5
FLAT ROOF θ < 10 DEG
MONOSLOPE ROOF
a
2a aa a4a2a
a
h = MEAN ROOF HEIGHT, IN FEET, EXCEPT THE EAVE HEIGHT SHALL BE USED FOR ROOF ANGLES < 10°
1
22
3
3
5
5
2
3
3
3
3
4
5
5 5
5
3
5
GABLE ROOF2a
a2a a2a
a
COMPONENT & CLADDING WIND PRESSURE ZONE SCHEMATIC (ASCE 7-10)
STANDARD WOOD
FRAMING NOTES
AND SCHEDULES
NTS
S0-2B
SHEET NUMBER
NORTH END
APARMENTS
SMOKY ROW
ROAD & U.S. 31
CARMEL,IN
ISSUE DATE
ISSUE TITLE
SHEET TITLE
DRAWING SCALE
PROJECT NUMBER
PROJECT NAME & LOCATION
609.003.20H
CAD / ENG
The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co
CONSTRUCTION@
INTEGRITYSTRUCTURAL.COM
12777 JONES RD., STE 388
HOUSTON, TX 77070
281 894 7099
2020.10.26
DESIGN DEVELOPMENT
DZ / MD
2020.12.04
PERMIT SET
DZ / MD
2021.01.15
BID DOCUMENTS
DZ / MD
04/15/22