Loading...
HomeMy WebLinkAboutSD2-1-ELEVATED SLAB & PT SECTIONSCONT. #4 EMBED PLATE A SCALE: 3/4" = 1'-0" 1/2" MIN.CMU WALL RE: SPECS. CONT. TOP SLIP DEEP LEG TRACK BRICK VENEER NOT SHOWN FOR CLARITY METAL STUDS & CONNX. DESIGNED BY CONTRACTOR CONT. TRACK FASTENED TO METAL STUDDO NOT CONNECT P.A.F. CONNECTION DESIGN BY CONTRACTOR STRUCTURAL SLAB DETAIL A -DEFLECTION TRACK SCHEMATIC DETAIL TO BE DESIGNED BY MANUF. LT. GAUGE METAL STUDS DESIGNED BY CONTRACTOR PODIUM SLAB RE: PLAN FOR REINFORCING DEFLECTION TRACK PODIUM SLAB RE:PLAN C 6X8.2 @ 48" O.C. INFILL W/METAL STUDS DESIGNED BY CONTRACTOR. CONT. C 6x8.2 TOP OF STOREFRONT, RE: ARCH DRIP EDGE CONT. WHERE NO WALL BELOW (TYP) PL 1/2"X8X0'-8" W/4~1/2"Ø X 5" H.S. (TYP.) STOREFRONT MANUFACTURER TO DESIGN CONNECTION FOR 3/4" DEFLECTION. EMBED PLATE A STOREFRONT BY OTHERS SEALANT RE: ARCH. PODIUM SLAB RE:PLAN C 6X8.2 @ 48" O.C. INFILL W/METAL STUDS DESIGNED BY CONTRACTOR. EMBED PLATE A ANGLE RELIEF CONT. CONT. C6X8.2 W/ #10 SCREW @ EA. STUD EACH SIDE, T & B (TYPICAL) PODIUM SLAB RE:PLAN C 6X8.2 @ 48" O.C. INFILL W/METAL STUDS DESIGNED BY CONTRACTOR.CONT. BOND BEAM RE SPECS FOR REINF.L6x6x5/16 x1'-0" @ 4'-0" O.C. 3/4"∅x 3 5/8" EMBED EXP. ANCHORS FINGER TIGHT IN LONG SLOTTED HOLES (VERTICAL) 2 IN EACH L6x5PODIUM LEVELRE: PLANRE: PLANSLAB THK.A TYPICAL DEFLECTION TRACK DETAIL VERIFY WITH ARCH.2' - 0" MAX.1/4 TYP. L5X5X5/16" CONT. 1/4 TYP. 1/4MIN. 1/2"2" TYP.8"8" SCALE: 3/4" = 1'-0" B TYPICAL BRICK RELIEF DETAIL RE: ARCH. RE: ARCH.2' - 4" MAX.RE: PLANSLAB THK.SCALE: 3/4" = 1'-0" C TYPICAL SET BACK STORE FRONT FRAMING W/O BRICK 1" GAPPL 5/16"X14" LG.X0'-8" W/4 3/4"ØX0'-6" HEADED STUDS 3/16" SCALE: 3/4" = 1'-0" D NLB CMU CONN. DETAIL RE: PLANSLAB THK.EMBED PLATE 1" MIN. 1/2"CONTINUOUS MASONRY VENEER WHERE SHOWN ON ARCH. ONLY. PODIUM SLAB RE:PLAN MASONRY RELIEF ANGLE @ CONCRETE WALLS WHEN REQ'D. MASONRY VENEER WHERE SHOWN ON ARCH. PLAN ONLY.NLB WALL BELOW WHERE SHOWN BY ARCH. RE. TYP. DETAILS FOR ATTACHMENT WALL ABOVE WHERE SHOWN ON ARCH. PROVIDE #4 CONTINUOUS BELOW STUDSPODIUM LEVELRE: PLANE TYPICAL MASONRY VENEER RELIEF ANGLE PL 1/2"X6X0'-8" W/2~1/2"Ø X 6" H.S. @ 24" O.C. EQ EQ 6"8"(TYP.)1 1/2"L5X5X5/16" CONT.2 1/2"1"1/4 SCALE: 3/4" = 1'-0" FINISH FLOOR SEE PLAN RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF. SHAFT OPENING - RE: PLAN CONCRETE WALL RE. WALL DETAIL FOR REINF. EXTERIOR FINISH - RE: ARCH. FINISH FLOOR SEE PLAN CMU WALL WHERE SHOWN BY ARCH - RE: SPECS. RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF. SHAFT OPENING - RE: PLAN EXTERIOR FINISH - RE: ARCH. FINISH FLOOR SEE PLAN PT SLAB RE: PLAN FOR REINFORCING CONCRETE WALL RE. WALL DETAIL FOR REINF. RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF. ON PLAN ONLY SLIP JOINT RE: STD'SRE: PLANSLAB THK.RE: PLANVARIESSHAFT OPENING - RE: PLAN SLOPE WHERE SHOWN FINISH FLOOR SEE PLAN PT SLAB -RE: PLAN FOR REINFORCING RE: PLANSLAB THK.RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF. SLIP JOINT RE: STD'S CONCRETE WALL RE. WALL DETAIL FOR REINF. EXTERIOR FINISH - RE: ARCH. FINISH FLOOR SEE PLAN PT SLAB RE: PLAN FOR REINFORCING CMU WALL WHERE SHOWN BY ARCH - RE: SPECS. RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF. SLIP JOINT RE: STD'SRE: PLANSLAB THK.RE: PLANVARIESSHAFT OPENING - RE: PLAN FINISH FLOOR SEE PLAN PT SLAB RE: PLAN FOR REINFORCING RE: PLANSLAB THK.RE: PLAN WALL THK CONCRETE WALL RE. WALL DETAIL FOR REINF.RE: PLANVARIESSLIP JOINT RE: STD'SRE: PLANSLAB THK.RE: PLANVARIESFINISH FLOOR SEE PLAN PT SLAB RE: PLAN FOR REINFORCING RE: PLAN WALL THK CMU WALL WHERE SHOWN BY ARCH - RE: SPECS. SLOPE WHERE SHOWN ON PLAN ONLY RE: PLANSLAB THK.RE: PLANVARIESSHAFT OPENING - RE: PLAN CMU WALL WHERE SHOWN BY ARCH - RE: SPECS. FINISH FLOOR SEE PLAN GRID PT SLAB RE: PLAN FOR REINFORCING CONCRETE COLUMN CONCRETE COLUMN RE: SCHEDULE FOR SIZE AND REINFORCEMENT.RE: PLANSLAB THK.CONCRETE COLUMN RE: SCHEDULE FOR SIZE AND REINFORCEMENT. RE: PLAN FINISH FLOOR SEE PLAN PT SLAB -RE: PLAN FOR REINFORCING RE: PLANSLAB THK.RE: ARCH. FOR WALL TYPE RE: ARCH. FOR WALL TYPE EXTERIOR FINISH - RE: ARCH. PT SLAB -RE: PLAN FOR REINFORCING ELEVATION SEE PLAN RE: PLANSLAB THK.SOFFIT DROP WHERE SHOWN ON PLAN PT SLAB -RE: PLAN FOR REINFORCING 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM in the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Corp.'s strong belief and faith in Jesus Christ and it is our desire that through our work others may come to know Christ as well. May God bless this project and all of those involved.cree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obediencia a Dios. (Juan 3:16-21,NVI) For God so loved the world the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already because he has not believedThe words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoeverbelieves in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but tosave the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already because he has not believed in the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come intothe light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV) Porque tanto amó Dios al mundo, que dio a su Hijo unigénito, para que todo el que cree en él no se pierda, sino que tenga vida eterna. Dios no envió a su Hijo al mundo para condenar al mundo, sino para salvarlo por medio de él. El queCAD / ENG PROJECT NAME & LOCATION PROJECT NUMBER DRAWING SCALE SHEET TITLE SHEET NUMBER ISSUE DATE ISSUE TITLE KR / RM12.04.2020 PERMIT SET KR / RM2021.01.15 BID DOCUMENTS 3/4" = 1'-0" ELEVATED SLAB & PT SECTIONS SD2-1 NORTH END APARTMENTS CARMEL, IN 609.003.20H 3/4" = 1'-0" 1 P.T. SLAB - TYPICAL DEFLECTION TRACK DETAIL 3/4" = 1'-0"2 EXTERIOR CONCRETE WALL & SHAFT 3/4" = 1'-0"3 EXTERIOR CONCRETE WALL & SHAFT AT PODIUM 3/4" = 1'-0"4 P.T. SLAB AT CONCRETE WALL & SHAFT 3/4" = 1'-0"5 P.T. SLAB AT CONCRETE WALL (T&B) AT SLAB EDGE 3/4" = 1'-0"6 P.T. SLAB AT CONCRETE WALL AT PODIUM 3/4" = 1'-0"7 P.T. SLAB AT CONCRETE WALL WITH PODIUM ON TOP 3/4" = 1'-0"8 P.T. SLAB AT CMU WALL & SHAFT 3/4" = 1'-0"12 P.T. SLAB AT EXTERIOR CONCRETE COLUMN (T&B)3/4" = 1'-0"13 P.T. SLAB AT SLAB EDGE 3/4" = 1'-0"9 P.T. SLAB AT SOFFIT DROP 1 04/15/22