Loading...
HomeMy WebLinkAboutSD6-1-ROOF FRAMING DETAILSSCALE: 3/4" = 1'-0" TRUSS @ INTERIOR WALL 8 OVERHANG RE: ARCH OVERHANG RE: ARCHHEEL HEIGHT. RE: ARCH.DRAFTSTOP WHEN SHOWN ON ARCHITECTURAL PLANS 2X PARTY WALL AIR SPACE RE. ARCH RAKE RE: ARCH CONTINUOUS PLYWOOD TO BOTTOM OF ROOF TRUSS. 2X4 BLOCKING (TOP MIDDLE THIRD MAY BE "V"CUT UP TO HALF THE BLOCKING DEPTH FOR VENTILATION) EDGE NAILING ROOF DECKING ROOF TRUSS, INSTALL PER BCSI SIMPSON FRAMING ANCHOR@ ALL BEARING LOCATIONS, RE:STD NOTES (2) 2X TOP PLATE 2X STUD WALL OVERSIZED BLOCKING BETWEEN TRUSSES (TOP MIDDLE THIRD MAY BE "V"CUT UP TO HALF THE BLOCKING DEPTH FOR VENTILATION) EDGE NAILING ROOF DECKING HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN ROOF TRUSS, INSTALL PER BCSI (2) 2X TOP PLATE 2X STUD WALL HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN A TYPICAL SLOPED ROOF FRAMING DETAIL SCALE: 3/4" = 1'-0" 1 SLOPED TRUSS @ EXT. WALL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) SIMPSON FRAMING ANCHOR RE:STD NOTES (4)0.131"X3" 2X OUTLOOKERS BY FRAMER@ 24" O.C. MAX. (4) 0.131"X3" END NAILS (2) 16D TOENAILS (2)2X6 STRONG BACK DIAGONAL BRACE @ 48" O.C. 2X BLOCKING (2) 2X BEARING PLATE GABLE END TRUSS 3 GABLE TRUSS @ EXT. WALL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) GIRDER TRUSS HANGER SIZED & PROVIDED BY TRUSS MANUFACTURER. 4 TRUSS TO GIRDER TRUSS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) FLUSH BEAM, RE:PLAN FLUSH BEAM, RE:PLAN 2X4 BLOCKING @ 6'-0" O.C. EA. SIDE2X PARTY WALL 5 CANTILEVER TRUSS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) CANTILEVER RE: ARCH DRAFTSTOP WHEN SHOWN ON ARCHITECTURAL PLANS 2X BLOCKING @ 6'-0" O.C. EA. SIDE (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) SCALE: 3/4" = 1'-0" TRUSS@PARTY WALL7 (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) LOW HEEL HIGH HEEL SCALE: 3/4" = 1'-0" TRUSS@FLUSH BEAM 6 (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) CONTINUOUS PLYWOOD TO BOTTOM OF ROOF TRUSS TOP CHORD. SOFFIT ROOF ENCLOSURE RE:ARCH. SOFFIT ROOF ENCLOSURE RE:ARCH. SOLID BLOCKING@HEELS LESS THAN 11 1 4", 200 PLF SHEAR BLOCKS BY TRUSS MANF.@TALLER HEELS (2)A34 PER BLOCK PARALLEL CONDITION PERPENDICULAR CONDITION PERPENDICULAR-PARALLEL CONDITION PERPENDICULAR-PERPENDICULAR CONDITION PERPENDICULAR-PARALLEL CONDITION PARALLEL CONDITION PERPENDICULAR-PARALLEL CONDITION ROOF DECKING CONTINUOUS ACROSS WITH NO PARALLEL JOINTS W/IN24" DECK EDGE NAILING ROOF TRUSS (ORIENTATION MAY VERY, RE: ARCH) 0.131"X3" @ 4" O.C. - EACH SIDE 2X4 BLOCKING (2) 2X6 STRONG BACK DIAGONAL BRACES@48" O.C. FIRE WALL RE: ARCH A34 W/ SCREWS (TYP.) ROOF TRUSS (ORIENTATION MAY VERY, RE: ARCH) 9 TRUSS @ FIREWALL SCALE: 3/4" = 1'-0" (4)0.131"X3" END NAILS, TYP.TOP OF PLATETOP OF PLATETOP OF PLATE TOP OF PLATE (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)HEEL HEIGHT. RE: ARCH.TOP CHORD SLOP E R E:ARCH .SLOP E RE:AR C H. SIMPSON FRAMING ANCHOR@ ALL BEARING LOCATIONS, RE:STD NOTES LOW HEEL HIGH HEEL CONT. 2X EAVE BOARD A34 W/ SD SCREWS STAGGERED TRUSS BEYOND STAGGERED TRUSS BEYOND DRAG TRUSS W/ CLIPPING @ SHEARWALL CONDITIONS, RE: STD. DTL. AIR SPACE RE: ARCH DRAG TRUSS W/ CLIPPING @ SHEARWALL CONDITIONS, RE: STD. DTL. EDGE NAILING HORIZONTAL H2.5A (TYP.) (4)0.131"X3", TYP. CONT. 2X6 W/0.131"X3" @ 4" O.C. - EACH SIDE (4)0.131"X3" END NAILS, TYP. DRAFTSTOP WHEN SHOWN ON ARCHITECTURAL PLANS DRAG TRUSS W/ CLIPPING @ SHEARWALL CONDITIONS, RE: STD. DTL. AIR SPACE RE. ARCH OVERSIZED BLOCKING W/EDGE NAILING @ DECKING & GABLE TRUSS. PROVIDE SEAT IN TRUSS OVERHANG RE: ARCH OVERHANG RE: ARCHHEEL HEIGHT. RE: ARCH.2 SLOPED TRUSS @ EXT. WALL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) A TYPICAL FLAT ROOF FRAMING DETAIL WITH PARAPET NOT TO SCALETOP OF PLATEVARIESPARAPET HEIGHT - RE: ARCH. 3'-0" MAX U.N.O.DESIGNED BY TRUSS MANUF.RE: TRUSS MANUF. - 2'-0" MIN. SIMPSON FRAMING ANCHOR @ ALL BEARING LOCATIONS RE: STD. NOTES ROOF TRUSS INSTALL PER BCSI(2) 2X BEARING TOP PLATES GIRDER TRUSS HANGER SIZED & PROVIDED BY TRUSS MFGR. SLOPE - RE: ARCH. ROOF DECKINGVARIES PARAPET HEIGHT - RE: ARCH. 3'-0" MAX U.N.O.DESIGNED BY TRUSS MANUF.RE: TRUSS MANUF. - 2'-0" MIN. JACK TRUSS EDGE NAILING TOP AND SIDES (TYPICAL) OVERSIZED BLOCKING WALL PERPENDICULAR TO TRUSSES WALL PARALLEL TO TRUSSES PARAPET BUILT INTEGRAL WITH TRUSS PER MANUF. (WIND LOADS BY TRUSS MANUF.) ROOF DECKING (2) 2X TOP PLATE 2X BLOCKING WITH 0.131" x 3" @ 4"O.C. CONTINUE SHEATHING OVER END OF TRUSS TO TOP OF PARAPET. EDGE NAILING 2X STUD WALL HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN SLOPE PER ARCH (2) 2X BEARING TOP PLATES 2X STUD WALL EDGE NAILING TOP AND SIDES (TYPICAL) OVERSIZED BLOCKING CONTINUE SHEATHING OVER END OF TRUSS TO TOP OF PARAPET. SIMPSON FRAMING ANCHOR @ ALL BEARING LOCATIONS RE: STD. NOTES ROOF TRUSS INSTALL PER BCSI HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN PARAPET BUILT INTEGRAL WITH TRUSS PER MANUF. (WIND LOADS BY TRUSS MANUF.) (2) 2X TOP PLATE PLYWOOD SHEARWALLS MAY BE REQUIRED IN THE AIR SPACE. RE:SHEARWALL PLANS FOR LOCATIONS. PLYWOOD SHEARWALLS MAY BE REQUIRED IN THE AIR SPACE. RE:SHEARWALL PLANS FOR LOCATIONS. PLYWOOD SHEARWALLS MAY BE REQUIRED IN THE AIR SPACE. RE:SHEARWALL PLANS FOR LOCATIONS. 2X4 BLOCKING @ 6'-0" O.C. EA. SIDE CONTINUOUS 2X EVE BOARD CONTINUOUS 2X EVE BOARD ROOF FRAMING DETAILS 3/4" = 1'-0" SD6-1 SHEET NUMBER NORTH END APARMENTS SMOKY ROW ROAD & U.S. 31 CARMEL,IN ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.003.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.10.26 DESIGN DEVELOPMENT DZ / MD 2020.12.04 PERMIT SET DZ / MD 2021.01.15 BID DOCUMENTS DZ / MD 04/15/22