Loading...
HomeMy WebLinkAboutEP110a - BUILDING ELECTRICAL PLANS - BUILDING AFSFS TS TS F F F F F F FFS ST1-0 ST1-0 GARAGE 001 ST2-0 ST2-0 ELV-1-2 ELV-1-2 RISER ROOM-1 002-1 UH-1 UH-2 HA0-5 HA0-5 HA0-5 HA0-5 HA0-5 HA0-5110cd 110cd 110cd 110cd 110cd 110cd E HA0-4 WP HAE-2 WP HAE-1 HA0-25 2 1 4 3 5 HAE-3 HA0-5 GEF-2 GEF-1 HA0-27,29 6 7 89 MC2 HA0-22,24,26 CO PANEL 10 HA0-11 HA0 MDPA CT3 CT2 HAE 910 11 13 14 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET EP110aBUILDING ELECTRICALPLANS -BUILDING ANORTH ENDAPARTMENTSCARMEL, INSHEET KEYNOTES 1 PROVIDE DISCONNECT FOR ELEVATOR. COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 2 PROVIDE DISCONNECT FOR ELEVATOR CAB LIGHTING AND RECEPTACLES. COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 3 PROVIDE RECEPTACLE FOR SUMP PUMP IN ELEVATOR PIT. COORDINATE LOCATION WITH ELEVATOR INSTALLER AND FINAL PIT LOCATION PRIOR TO ROUGH-IN. 4 PROVIDE RECEPTACLE FOR GENERAL POWER LOCATED IN ELEVATOR PIT. COORDINATE LOCATION WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 5 PROVIDE SMOKE DETECTOR FOR ELEVATOR RECALL. 6 PROVIDE DEDICATED 20A, 120V CIRCUIT FOR UH-1. 7 PROVIDE 208V, SINGLE PHASE 20 AMP CIRCUIT TO UH-2. 8 PROVIDE DEDICATED 20A, 208V, 1-PHASE CIRCUIT FOR GEF-1. 9 PROVIDE 20A, 208V, 3-PHASE CIRCUIT FOR GEF-2. PROVIDE SIZE NEMA 1 COMBINATION MOTOR STARTER WITH HOA SWITCH IN NEMA 3R ENCLOSURE. COORDINATE WITH TCC FOR INPUT REQUIREMENTS TO INTERFACE WITH CARBON MONOXIDE PANEL. 10 PROVIDE 120V, 20 AMP CIRCUIT TO CARBON MONOXIDE CONTROL PANEL. PANEL PROVIDED BY DIV. 23. COORDINATE INSTALLATION PRIOR TO ROUGH-IN 1/8" = 1'-0" BUILDING A ELECTRICAL LOWER FLOOR PLAN - AREA A 1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO E-600 SERIES SHEETS FOR LOAD CENTER CIRCUIT SCHEDULES FOR EACH DWELLNG UNIT TYPE. C TO PROVIDE (1) 1" CONDUIT WITH PULL STRING AND BUSHINGS FROM TERMINAL BOARD TO EACH APARTMENT UNIT HOME NETWORKING ENCLOSURE. COORDINATE WITH UTILITY ON EXACT REQUIREMENTS PRIOR TO ROUHG-IN. # DESCRIPTION DATE 07/08/21