Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P124 - BUILDING PLUMBING PLANS - BUILDING B
UNIT B2 402 UNIT B2 401 UNIT A1 405 UNIT A2 407 UNIT A1 IDD 406 UNIT A2 408 UNIT A2 410 UNIT A1 IDD 412 UNIT A2 409 UNIT A1 IDD 411 UNIT A4 413 UNIT B2 415 UNIT B2 416 UNIT A4 404 ELEC. ROOM E401 MECH. ROOM M401 MECH. ROOM M402 ELEC. ROOM E402 5 1 2 1 2 5 1 2 1 2 1 2 5 3 1 2 5 1 2 5 1 25 1 25 1 2 5 1 2 5 1 25 1 2 5 1 2 5 5 1 2 1 2 5 12 1 2 4" RD 4" RD4" RD 4" RD4" RD 4" RD 6" ST6" ST6" ST 666 4" V 4 11 1 3 4 4" V 1 1 1 ARCHITECTCLIENT GC/CM PROJECT DRAWING TITLE SEAL SHEET PROJECT INFO REVISIONS20031 JANUARY 15, 2021 BID SET P124BUILDING PLUMBINGPLANS -BUILDING BNORTH ENDAPARTMENTSCARMEL, INGENERAL NOTES A REFER TO DRAWING P-000 FOR PLUMBING AND FIRE PROTECTION SYMBOLS AND ABBREVIATIONS. B REFER TO DRAWING P-500 SERIES FOR PLUMBING DETAILS. C REFER TO DRAWING P-600 SERIES FOR PLUMBING SCHEDULES. D ALL COLD WATER LINES INSTALLED IN UNCONDITIONED SPACES SHALL HAVE MINIMUM R4 INSULATION SHEET KEYNOTES 1 WASTE STACK. 2 VENT STACK. 3 3" WASTE DOWN. 4" VENT UP. 4 4" VENT UP THRU ROOF. 5 COLD WATER RISER. 6 6" STORM DOWN. 1/8" = 1'-0" BUILDING B PLUMBING FOURTH FLOOR PLAN1 # DESCRIPTION DATE 1 BID DOCUMENT 01/15/2021 07/08/21