HomeMy WebLinkAboutSD3-1-CONCRETE COLUMNS SCHED. AND DETAILSNOTES: 1. SEE SHEET S0-1 FOR GENERAL NOTES. 2. ALL COLUMNS ARE CENTERED ON GRID LINES U.N.O. 3. OFFSET BEND LONGITUDINAL BARS SHALL CONFORM TO DETAIL NOTE: TIES MAY BE MULTIPLE BEND STIRRUPS.Top of Concrete(Podium Level)Re: 9/S2-13" 3 @ 3" ScheduledSpacingTop of Concrete(Intermediate Levels)Re: Plan Re: Plan3 @ 3" Scheduled SpacingClass "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.3 @ 3" Scheduled Spacing Ties - Re: Schedule Vertical Reinf - Re: Schedule Std. ACI 90° hook Ties - Re: Schedule Vertical Reinf - Re: Schedule Slope 1:6 Max. Std. ACI 90° hook Top of PlinthDowels - Re Schedule Top of Concrete(Podium Level)3 @ 3" ScheduledSpacingTop of Concrete(Intermediate Levels)Re: Plan Re: Plan3 @ 3"Scheduled Spacing3 @ 3" Scheduled Spacing 2" Clr.Ties - Re: Schedule Vertical Reinf - Re: Schedule Std. ACI 90° hook Ties - Re: Schedule Vertical Reinf - Re: Schedule Slope 1:6 Max. Std. ACI 90° hook Top of FootingDowels - Re Schedule3 @ 3"ScheduledSpacing3 @ 3"ScheduledSpacing3" 3" 3"2" Clr.3" 3" 3"3" CL of Column CL of Column Re: 9/S2-1Re: Plan Re: Plan Maintain Rough Surface Up To 1/4" Amptitude @ Column & Slab Interface (Typ.) Note: Provide Additional Straight Dowels Where This Transition is Not Possible Note: Provide Additional Straight Dowels Where This Transition is Not Possible 4 TYPICAL INTERIOR COLUMN 3/4" = 1'-0" 5 TYPICAL EXTERIOR COLUMN 3/4" = 1'-0" FLOOR LEVEL COLUMN MARK CONCRETE COLUMN SCHEDULE SECOND FLOOR FIRST FLOOR SECOND FLOOR SLAB TO FIRST FLOOR FIRST FLOOR SLAB TO LOWER LEVEL DOWELS TO FOOTING BOTTOM OF FOOTING Notes: 1. Provide Class "A" splices at each level unless columns is cast as part of shearwall in which case class B splice shall be used. 2. Refer to structural specifications for cover requirements and reinforcing steel strength. 3. Refer to framing sections for exact location of top and bottom of column. 4. Re: Plan for top of column elevation. 5. Refer to structural specifications for concrete strength. VERTICAL REINF. COLUMN SIZE, TIES & BAR PATTERN. C2 C1 TYPICAL Class "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.Class "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.Class "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.LOWER LEVEL 24" X 24" 3~#3 @12" O.C. TYPE 2 12~#812~#8COLUMN DOWELS INTO FOOTING AT GROUNDS PATTERN TYPE 1 - 10 BARSSCHEDULED WIDTHTIES - 4 SETS RE: SCHEDULE VERTICAL REINF RE: SCHEDULE SCHEDULED DEPTH COVERS RE: SPECS Top of Concrete(Podium Level)Re: 9/S2-13" 3 @ 3" ScheduledSpacingRe: Plan3 @ 3" ScheduledSpacingTies - Re: Schedule Vertical Reinf - Re: Schedule Std. ACI 90° hook Std. ACI 90° hook Top of PlinthDowels - Re Schedule Top of Concrete(Podium Level)3 @ 3" ScheduledSpacingRe: Plan3 @ 3" ScheduledSpacing3" Clr.Ties - Re: Schedule Vertical Reinf - Re: Schedule Std. ACI 90° hook Std. ACI 90° hook Top of FootingDowels - Re Schedule3" 2" Clr.3" 3" CL of Column CL of Column Re: 9/S2-1 Re: Plan 2 TYPICAL INTERIOR COLUMN 3/4" = 1'-0" 3 TYPICAL EXTERIOR COLUMN 3/4" = 1'-0" 4 COLUMN DOWELS DETAILS 3/4" = 1'-0"Class "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.Class "B" Splice if column is integrated w/ Shearwall,otherwise use 30 bar dia. for splice. Re: Stds.Bottom Of Column = Top Of Pier Cap 16"45"SPLICE#821"EMBEDSCHEDULED WIDTHCOVER (RE: SPECS) TIES - 3 SETS RE: SCHEDULE VERTICAL REINF RE: SCHEDULE SCHEDULED DEPTH PATTERN TYPE 2 - 12 BARS COLUMN SIZE, TIES & BAR PATTERN. 1 COLUMN SCHEDULE AND REINFORCING DETAILS 3/4" = 1'-0" C3 COLUMN SIZE, TIES & BAR PATTERN. VERTICAL REINF. 16" X 28" 3~#3 @12" O.C. TYPE 2 VERTICAL REINF. 16" X 28" 3~#3 @12" O.C. TYPE 1 16" X 28" 3~#3 @12" O.C. TYPE 1 COLUMN DOWELS INTO FOOTING AT GROUNDS 10~#8 10~#810~#816" X 28" 3~#3 @12" O.C. TYPE 1 10~#810~#8COLUMN DOWELS INTO FOOTING AT GROUNDS SHEET NUMBER NORTH END APARMENTS SMOKY ROW ROAD & U.S. 31 CARMEL,IN ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.003.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the sheep. All who ever came before me were thieves and robbers, but the sheep did not listen to them. I am the gate; whoever enters through me will be saved. He will come in and go out, and find pasture. The thief comes only to steal and kill and destroy; I have come that they may have life, and have it to the full. (John 10: 7-10, NIV) Jesus answered, "I am the way and the truth and the life. No one comes to the Father except through me." (John 14:6, NIV) These bible verses reflect Integrity Structural Co CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.10.26 DESIGN DEVELOPMENT DZ / MD 2020.12.04 PERMIT SET DZ / MD 2021.01.15 BID DOCUMENTS DZ / MD CONCRETE COLUMNS SCHED. AND DETAILS 3/4" = 1'-0" SD3-1 04/15/22