March 18, 2005
Carmel Clay CommunicatiON Center
311KAVENue,N.W.
CARMa., INOIANA ~2
3171S71.2.S80
Duke Reality Coporation
600 E 96'" St #100
Indianapolis. Indiana 46240
Attn: Rodney Reinhart
Dear Rodney,
This is fonnal notification of addresses assigned to the project called Walnut Creek
Marketplace. The following arc the addresses as.qigned to the project:
· The big R.taD Center - 100:15 N MichipD Road
· let 1 91S, N MlcDlgau Raa'"
· let J 9101 N !\IJ..hi._ Rvad
All tenant spaces in each building with have to utilize suite numbers in the 100 series in
increments of 1 0, elCcept for the big J'etaiI which could use increments of 20 for future
tenant space splits. The suite numbers will need to IlUlleft to right as you face the front of
the building. Please be sure there is sufficient signage along Michigan Road to signify tbe
location of the Marketplace Center.
Please keep this letter as proof of the addresses assigned, you will need to show it when
applying for permits with the City of Carmel. Jfyou have any questions or COncems feet
free to contact me at the above number.
Sincerely,
B..JQ.: ~
Bill Ake13
9 J I Operations Manager
Cannel Communications Center
Lillard, Sarah N
Subject:
Hoyt, Gary A
Wednesday, January 25, 2006 7:48 AM
Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Blanchard, Jim E; Brewer,
Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-
south@iaswcd.org'; 'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt
L
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
From:
Sent:
To:
The fire department is requesting Knox boxes for each building and Knox FOC caps
for sprinkler connections. Our department is requesting a meeting to discuss fire
department connection locations and to see locations of fire hydrants for the projects.
Gary Hoyt
CFO
From: Lillard, Sarah N
Sent: Tuesday, January 24, 2006 4:S1 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Hello,
The "B Shops" buildings are under docket '# 04050028 for DP/ ADLS. It looks like this project initially
went through TAC on 6/16/04. It also appears that these were part of the approval for the "West
Carmel Marketplace" development.
As of now, the status I am showing for the project, per each office is:
1. Greg Hoyes has signed off on submittal;
2. The City of Carmel Engineer's Office has signed off-as it is not within their jurisdiction;
3. Scott Brewer has requested and received and stamped copies of the approved site plan. The builder
should pick up their copies prior to the submittal meeting. One stamped copy must be submitted with
the building permit application, at the submittal meeting;
4. John South was still looking for project information and had not yet signed off on submittal;
5. Candy Feltner was still looking for project information and had not yet signed off on submittal;
6. Matt Griffin has requested and received copies of the elevation drawings for only one of the
buildings. That set has been approved, but we either need submittal of three sets for the second
building, or-if the elevations are the same for both buildings-Mr. Griffin will need a written statement
to that effect, or you can contact him to discuss other options.
7. Gary Hoyt was still looking for project information, but may have issues. Now that he has specific
docket and TAC information (at least the initial TAC date) he should reply back with any further
Issues.
If the status of this project is different than listed for your office, please "reply to all" to this email.
Thank you,
1
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Page 1 of 4
Lillard, Sarah N
From: Candy Feltner [Candy.Feltner@ctrwd.org]
Sent: Thursday, January 26, 2006 9:54 AM
To: Randy Burke; Lillard, Sarah N
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
That is correct. I have been in meetings all week and just got e-mails, sorry for the delay.
Candy J. Feltner
Director of Administration and
Customer Service
Clay Township Regional Waste District
10701 N. College Ave. Suite A
Indianapolis, Indiana 46280
candy. feltner{a)ctrwd. orq
(317) 844-9200
(317) 844-9203 fax
From: Randy Burke [mailto:Randy.Burke@dukerealty.com]
Sent: Wednesday, January 25, 2006 12:49 PM
To: Lillard, Sarah N; Candy Feltner
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Hi Sarah, Candy,
I checked with Rodney and he had the CTRW sanitary sewer permit. It is signed by Candy and is checked "Final
Permit". The interceptor I application and EDU fees were paid.
The permit is dated July 28th, 2005. The sewers were installed with the infrastructure work.
Please let me know if I need to do anything further.
Thanks,
Randy
m--Original Message--m
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Tuesday, January 24, 2006 4:52 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim
E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; john-
south@iaswcd.org; Candy Feltner; mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L
Cc: Randy Burke
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
I apologize. The applicant was not listed on the original email. If you are
replying to this email, please reply on this message, so the applicant will be
included.
.----Original Message-un
From: Lillard, Sarah N
Sent: Tuesday, January 24, 2006 4:51 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, WilHam P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L
01/26/2006
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Page I of3
Lillard, Sarah N
TZEi'd>>~
// 1~1 ~cJ- '/ltj
1ft. o~ )JtJ ('pi) (
M\J~t>r
Hi Sarah, Matt, Jr)P aA'V 5
Item #6 Matt Griffin - we noted on the transmittal that the elevation is the same (typical) for both B Shop 1" ~JfrJ
Buildings. Will that suffice for the written documentation and confirmation that they are the same for purposes of 7V
getting the building permit? 1'1 f.{iv')
We will follow up and get Matt (3) copies of the other building elevation for his files. 6' '
From: Randy Burke [Randy.Burke@dukerealty.com]
Sent: Tuesday, January 24, 2006 5:51 PM
To: Lillard, Sarah N; Griffin, Matt L
Cc: Tom McLaughlin
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Thanks,
Randy
-----Original Message-----
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Tuesday, January 24, 2006 4:52 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim
E; Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; john-
south@iaswcd.org; Candy Feltner; mbm@co.hamilton.in,us; Foley, Amanda J; Griffin, Matt L
Cc: Randy Burke
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
I apologize. The applicant was not listed on the original email. If you are
replying to this email, please reply on this message, so the applicant will be
included.
-----Original Message-----
From: lillard, Sarah N
Sent: Tuesday, January 24,20064:51 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L
Subject:
RE: Pre~submjttaJ for West Carmel Marketplace B-Shop Bldgs
Hello,
The "B Shops" buildings are under docket 11 04050028 for DP/ ADLS. It
looks like this project initially went through TAC on 6/16/04. It also
appears that these were part of the approval for the "West Carmel
Marketplace" development.
As of now, the status I am showing for the l.2roject, l.2er each office is:
01/25/2006
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Page I of3
Lillard, Sarah N
Sent:
To:
From: jsouth Uohn-south@iaswcd.org]
Tuesday, January 24, 2006 5:28 PM
Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E;
Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; 'Candy Feltner';
mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L
Cc: randy.burke@dukerealty.com
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Sarah,
I have completed additional investigation. The B Shops were included in the original plans for the overall site plan.
Those plans were approved so this project is good to go.
John South
Hamilton County Soil and Water Conservation District
1108 South 9th Street
Noblesville, IN 46060
ph- 317-773-1406
-----Original Message-----
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Tuesday, January 24, 2006 4:52 PM
To: Lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E;
Brewer, Scott I; Dolan, Veronica A; Akers, William P; grh@co.hamilton.in.us; john-south@iaswcd.org;
Candy Feltner; mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L
Cc: randy.burke@dukerealty.com
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
I apologize. The applicant was not listed on the original emaiL If you are replying to
this email, please reply on this message, so the applicant will be included.
m--Original Messagend-
From: Lillard, Sarah N
Sent: Tuesday, January 24, 20064:51 PM
To: lillard, Sarah N; Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley,
Amanda J; Griffin, Matt L
Subject:
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Hello,
The "B Shops" buildings are under docket"# 04050028 for DP/ADLS. It looks
like this project initially went through TAC on 6/16/04. It also appears that
these were part of the approval for the "West Carmel Marketplace"
development.
01/25/2006
Lillard. Sarah N
Subject:
Lillard, Sarah N
Thursday, January 19, 2006 12:04 PM
Duncan, Gary R; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer,
Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-
south@iaswcd.org'; 'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt
L
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
From:
Sent:
To:
Good Afternoon Everyone,
I am forwarding this em ail response to all of you, but the builder has not been CCd on this emaiL Our
Planning & Zoning office is attempting to discern whether or not these two buildings actually went
through the full approval process. While we believe these buildings were noted on the site plans for
the entire development, they potentially need to go through their own approval process. As soon as we
have determined the answer to this question, we will let you all know.
Thank you,
Sarah
SMl\,h LiUM~
Building &: Code Enforcement
City of Carmel
Ph. (317) 571- 2475
Fax (317) 571-2499
slillard@carmel.in.gov
-----Original Message-----
From: Duncan, Gary R
Sent: Monday, January 09, 2006 3:08 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica A; Akers, William P;
'grh@co.hamilton.in.us'; 'john-sQuth@iaswcd.org'; 'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L
Cc: 'randy.burke@dukerealty.cam'
Subject: RE: Pre-submittal for West Carmel Marketplace 8-Shap Bldgs
This project .is out of Engineering's jurisdiction. We have no comments regarding this project.
Gary
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, January 09,200614:54
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R
Cc: 'randy.burke@dukerealty.com'
Subject: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
The Dept. of Community Service, Building & Code Enforcement division, has received
a request to schedule a pre-submittal meeting for the purpose of obtaining a building
permit. PLEASE "REPLY TO ALL" WITHIN 48 HOURS. IF YOU HAVE
OUTSTANDING ISSUES. After that time, we may proceed with the meeting and submittal.
1
.i
. '.Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Page I of2
Lillard, Sarah N
From: jsouth [john-south@iaswcd.org]
Sent: Tuesday, January 10, 2006 6:04 PM
To: Lillard, Sarah N
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Sara,
Is this the same as West Carmel Market Place Block G? I have not reviewed the revised plans for this project
John South
Hamilton County Soil and Water Conservation District
1108 South 9th Street
Noblesville, IN 46060
ph- 317-773-1406
-----Original Message-----
From: Lillard, Sarah N [mailto:SLillard@carmel.in,gov]
Sent: Monday, January 09, 2006 2:54 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I;
Dolan, Veronica A; Akers, William P; grh@co,hamilton,in,us; john-south@iaswcd,org; Candy Feltner;
mbm@co,hamilton,in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R
Cc: randy.burke@dukerealty,com
Subject: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
The Dept. of Community Service, Building & Code Enforcement
division, has received a request to schedule a pre-submittal meeting
for the purpose of obtaining a building permit. PLEASE "'B.EPL Y_ TQ
~L-',,"' WITHIN 48 HOURS, IF YOU HAVE OUTSTANDING ISSUES. After
that time, we may proceed with the meeting and submittal.
Project:
WEST CARMEL MARKETPLACE B-SHOP BUILDINGS
9873 Michigan Rd. N.
9893 Michigan Rd. N.
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
??? (multiple?)
Representative:
Randy Burke
01/18/2006
.~.Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Page 2 of2
Duke National Development & Construction
randy.burke@dukerealty.com
(317) 808-6339 office
(317) 514-1312 mobile
Again, if there are concerns that might affect the issuance of this
permit, please REPLY TO ALL on this e-mail.
01/18/2006
.~
Pre-submittal for West Carmel Marketplace B-Shop Bldgs
,,-
Page 1 of2
Lillard, Sarah N
From: Candy Feltner [Candy.Feltner@ctrwd.org]
Sent: Thursday, January 12, 2006 2:11 PM
To: Lillard, Sarah N
Subject: RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
Sarah,
Sorry for the late response, I have been in and out of the office this week.
What is the business name for these 2 locations? We do not have anything for B shop buildings.
Thanks
Candy J. Feltner
Director of Administration and
Customer Service
Clay Township Regional Waste District
10701 N. College Ave. Suite A
Indianapolis, Indiana 46280
!<.9D.dyj",llner@ctrwd.9[9
(317) 844-9200
(317) 844-9203 fax
From: Lillard, Sarah N [mailto:SLillard@carmel.in.gov]
Sent: Monday, January 09, 2006 2:S4 PM
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott I; Dolan,
Veronica A; Akers, William P; grh@co.hamilton.in.us; john-south@iaswcd.org; Candy Feltner;
mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R
Cc: randy.burke@dukerealty.com
Subject: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
The Dept. of Community Service, Building & Code Enforcement division, has
received a request to schedule a pre-submittal meeting for the purpose of
obtaining a building permit. PLEASE "REPLY TO ALL" WITHIN 48 HOURS, IF
YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed with the
meeting and submittal.
Project:
WEST CARMEL MARKETPLACE B-SHOP BUILDINGS
9873 Michigan Rd. N.
9893 Michigan Rd. N.
Meeting Date:
PENDING
Time:
PENDING
0]/18/2006
..-
..
lre-submittal for West car~ Marketplace B-Shop Bldgs
.t','"
Page 2 of2
Related Planning & Zoning docket numbers:
??? (multiple?)
Representative:
Randy Burke
Duke National Development & Construction
randy.burke@dukerealty.com
(317) 808-6339 office
(317) 514-1312 mobile
Again, if there are concerns that might affect the issuance of this permit,
please REPLY TO ALL on this e-mail.
01118/2006
Lillard, Sarah N
From:
Sent:
To:
Cc:
Subject:
Hoyt, Gary A
Monday, January 09, 2006 3:21 PM
Lillard, Sarah N; Griffin, Matt L
Brewer, Scott I; Akers, William P
RE: B-Shop bldgs
I am going to assume that it is docket # 04080052 PP, # 04080053 SW sca 6.03.152,
2 and # 04080044PV - West Carmel Center, Block F, Lot 1
That was heard on September 22,2004 at TAC.
If this is it, I have not had any response to the questions I had asked.
Thank you,
Gary
CFD
From: Lillard, Sarah N
Sent: Monday, January 09,20063:10 PM
To: Griffin, Matt L
Cc: Brewer, Scott I; Hoyt, Gary A; Akers, William P
Subject: B-Shop bldgs
Importance: High
Matt,
There appears to be a question as to whether or not these two "B-Shop" buildings at the West Carmel
Marketplace development actually went through T AC and the rest of our approval process. Randy
Burke of Duke stated that they were included in the full site approvals for the development, and that he
had been told by others that all of their approvals should be in place. Can you shed any light on this?
Were they part of the original development approvals? (and if so, do you have docket #'s) Or, where
these included on the site plans, but not really fully reviewed/approved through our process because
they were not going to be immediately constructed--and still need to gain those approvals?
Mr. Burke stated he was going to be dropping elevations to you and site/landscape plans to Scott either
this afternoon or tomorrow morning.
Let us know.
Thank you,
Sarah
1
Lillard. Sarah N
Cc:
Subject:
Duncan, Gary R
Monday, January 09, 2006 3:08 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott
I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org';
'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L
'randy. burke@dukerealty.com'
RE: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
From:
Sent:
To:
This project is out of Engineering's jurisdiction. We have no comments regarding this project.
Gary
-----Original Message-----
From: Lillard, Sarah N
Sent: Monday, January 09, 2006 14:54
To: Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scotti; Dolan, Veronica
A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org'; 'Candy Feltner';
'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R
Cc: 'randy.burke@dukerealty.com'
Subject: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
The Dept. of Community Service, Building & Code Enforcement division, has received a
request to schedule a pre-submittal meeting for the purpose of obtaining a building
permit. PLEASE "REPLY TO ALL" WITHIN 48 HOURS. IF YOU HAVE OUTSTANDING
ISSUES. After that time, we may proceed with the meeting and submittal. I
Project:
WEST CARMEL MARKETPLACE B-SHOP BUILDINGS
9873 Michigan Rd. N.
9893 Michigan Rd. N.
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
??? (multiple?)
Representative:
Randy Burke
Duke National Development & Construction
randy.burke@dukerealty.com
(317) 808-6339 office
(317) 514-1312 mobile
1
Lillard. Sarah N
Cc:
Subject:
Greg Hoyes [grh@co.hamilton.in.us]
Monday, January 09, 2006 2:57 PM
Conn, Angelina V; Foley, Amanda J; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard,
Jim E; Griffin, Matt L; Brewer, Scott I; Lillard, Sarah N; Dolan, Veronica A; Akers, William P;
Michael McBride; Candy.Feltner@ctrwd.org;john-south@iaswcd.org
randy. burke@dukerealty.com
Re: Pre-submittal for West Carmel Marketplace B-Shop Bldgs
From:
Sent:
To:
Sarah
The Hamilton County Surveyor's Office has no outstanding issues with this project. If you have any
questions, please let me know.
Greg Hoyes
HCSO Plan Reviewer
>>> "Lillard, Sarah N" <SLillard@carmeLin.gov> 2:53 PM Monday,]anuary 09, 2006, 2006 >>>
The Dept. of Community Service, Building &: Code Enforcement division, has received a request to
schedule a pre-submittal meeting for the purpose of obtaining a building permit. PLEASE "REPLY TO
All" WITHIN 48 HOURS, IF YOU HAVE OUTSTANDING ISSUES. After that time, we may proceed
with the meeting and submittal.
Project;
WEST CARMEl MARKETPLACE B-SHOP BUILDINGS
9873 Michigan Rd. N.
9893 Michigan Rd. N.
Meeting Date: PENDING
Time: PENDING
Related Planning &: Zoning docket numbers:
m (multiple?)
Representative:
Randy Burke
Duke National Development &: Construction
randy. burke@dukerealty.com
(317) 808-6339 office
(317) 514-1312 mobile
Again, if there are concerns that might affect the issuance of this permit, please REPLY TO ALL on this
e-mail.
1
Lillard. Sarah N
Cc:
Subject:
Lillard, Sarah N
Monday, January 09, 2006 2:54 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Hoyt, Gary A; Blanchard, Jim E; Brewer, Scott
I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.in.us'; 'john-south@iaswcd.org';
'Candy Feltner'; 'mbm@co.hamilton.in.us'; Foley, Amanda J; Griffin, Matt L; Duncan, Gary R
'randy. bu rke@dukerealty.com'
Pre-submittal for West Carmel Marketplace B-Shop Bldgs
From:
Sent:
To:
The Dept. of Community Service, Building & Code Enforcement division, has received a
request to schedule a pre-submittal meeting for the purpose of obtaining a building
permit. PLEASE "REPLY TO ALL" WITHIN 48 HOURS. IF YOU HAVE OUTSTANDING
ISSUES. After that time, we may proceed with the meeting and submittal.
Project:
WEST CARMEL MARKETPLACE B-SHOP BUILDINGS
9873 Michigan Rd. N.
9893 Michigan Rd. N.
Meeting Date:
PENDING
Time:
PENDING
Related Planning & Zoning docket numbers:
??? (multiple?)
Representative:
Randy Burke
Duke National Development & Construction
randy.burke@dukerealty.com
(317) 808-6339 office
(317) 514-1312 mobile
Again, if there are concerns that might affect the issuance of this permit, please
REPLY TO ALL on this e-mail.
1
Lillard. Sarah N
From:
Sent:
To:
Subject:
Randy Burke [Randy.Burke@dukerealty.com]
Monday, January 09, 2006 2:37 PM
Lillard, Sarah N
West Carmel Marketplace B-Shop Buildings
Hi Sarah,
I appreciate your help on starting the various agency notice process for the (2) B-Shop Buildings at
West Carmel Marketplace. We are submitting to Matt Griffin and Scott Brewer today. The building
addresses are 9873 and 9893 North Michigan Road.
My contact info is below.
Thanks,
Randy L Burke
Sr. Project Manager
Duke National Development &: Construction
600 East 96th St., Suite 100
Indianapolis, IN 46240
317808-6339 (direct)
317 514-1312 (mobile)
317808-6685 ([ax)
randy. burke@clukerealty.com
1
Page 1 of5
Permit Approval No 17195
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
AUTHORIZATION FOR CONSTRUCTION OF
SANITARY SEWER SYSTEM
UNDER 327 lAC ARTICLE 3
DECISION OF APPROVAL
Duke Construction, LP, in accordance with the provisions ofIC 13-15 and 327 lAC
Article 3 is hereby issued a permit to construct the sanitary sewer system to be located at 990 I
North Michigan Road. The permittee is required to comply with requirements set forth in Parts
I, II and ill hereof. The permit is effective pursuant to IC 4-21.5-3-4(d). If a petition for review
and a petition for stay of effectiveness are filed pursuant to IC 13-15-6, an Environmental Law
Judge may be appointed for an adjudicatory ,hearing. The force and effect of any contested
permit provision may be stayed at that time.
NOTICE OF EXPIRATION DATE
This permit and the authorization to initiate construction of this sanitary sewer system
shall expire at midnight May I, 2006. In order to receive authorization to begin construction
beyond the date of expiration, the permittee shall submit such information and forms as are
required by the Indiana Department of Environmental Management at least sixty (60) days prior
to the expiration date.
Signed this 4TH day of APRIL
Environmental Management.
, 20..Q,L, for the Indiana Department of
~~A.~
Kenneth A. Lee, Chief
Facility Construction Section
Office of Water Quality
(
Page 2 of 5
Permit Approval No 17195
SANITARY SEWER SYSTEM DESCRIPTION
It is proposed to install approximately 70 feet of 8-inch diameter PVC ASTM D-3034
(SDR 35) sanitary sewer to serve one commercial lot in the referenced project with an expected
total average flow of 22,000 gpd. The new sewer will be connected to an existing IS-inch
diameter sanitary sewer located approximately 1,000 feet south of the intersection of Commerce
Drive and Retail Parkway.
Inspection of the new sanitary sewer during construction, maintenance after completion
and wastewater treatment will be provided by CTR WO.
CONDITIONS AND LIMITATIONS TO THE AUTHORIZATION FOR
CONSTRUCTION OF SANITARY SEWERS
During the period beginning on the effective date of this permit and extending until the
expiration date, the permittee is authorized to construct the above described sanitary sewer
system. Such construction shall conform to all provisions of State Rule 327 lAC Article 3 and
the following specific provisions:
PARTI
SPECIFIC CONDITIONS AND LIMITATIONS TO THE CONSTRUCTION PERMIT
Unless specific authorization is otherwise provided under the permit, the permittee shall
comply with the following conditions:
1. All local permits shall be obtained before construction is begun on this project.
2. If pollution or nuisance conditions are created, immediate corrective action will
be taken by the permittee.
3. The separation of sanitary sewers from water mains and drinking water wells
must comply with 327 lAC 3-6-9.
4. All gravity sewer pipe must be leak tested using either a hydrostatic test or air test
in accordance with 327 lAC 3-6-19(d). Ifusing a hydrostatic test, the rate of
exfiltration or infiltration shall not exceed 200 gallons per inch of pipe diameter
per linear mile per day. Air test shall be as prescribed.
Page 3 of5
Permit Approval No 17195
5. The results of the gravity sewer leakage test and/or force main leakage test on the
completed sewer shall be submitted to this office within three months of
completion of construction.
6. Deflection tests must be performed on all flexible pipe after the final backfill has
been in place at least 30 days. No pipe shall exceed a vertical deflection of 5%.
Deflection test results shall be submitted with the infiltration/exfiltration test results.
(The following are considered nonflexible pipes: vitrified clay pipe, concrete pipe,
ductile iron pipe, cast iron pipe, asbestos cement pipe.)
7. Manholes shall be air tested in accordance with ASTM CI244-93, Standard Test
Method for Concrete Sewer Manholes by the Negative Air Pressure (Vacuum) Test.
The manhole test results shall be submitted with the gravity sewer leakage test
results.
Failure to submit test results within the allotted time period or failure to meet guidelines
as set forth in the above conditions could be subject to enforcement proceedings as provided by
3)7 lAC 3-5-3.
"
Page 4 of 5
Permit Approval No 17195
PART II
GENERAL CONDITIONS
1. No significant or material changes in the scope of the plans or construction of this project
shall be made unless the following provisions are met:
a. Request for permit modification is made 60 days in advance of the proposed
significant or material changes in the scope of the plans or construction;
b. Submit a detailed statement of such proposed changes;
c. Submit revised plans and specifications including a revised design summary; and
d. Obtain a revised construction permit from this agency.
2. This permit may be modified, suspended, or revoked for cause including, but not limited
to the following:
a. Violation of any term or conditions of this permit:
b. Obtaining this permit by misrepresentation or failure to disclose fully all relevant
facts.
3. Nothing herein shal1 be construed as guaranteeing that the proposed sanitary sewer
system shall meet standards, limitations or requirements of this or any other agency of
state or federal government, as this agency has no direct control over the actual
construction and/or operation of the proposed project.
4. If this project will require the discharge of dredged or fill material into waters of the
state, your project will require authorization from the U. S. Army Corps of Engineers and
IDEM-OWQ-Section 401 Water Quality Certification Program. For more information
contact IDEM-OWQ at 317-233-8488 or visit our web site at
hltD:/ /www.in. 2ov/idem/water/olanbr/40 1 /index.hlml
.. . ' .
Page 5 of5
Permit Approval No 17195
PART III
APPEALS PROCEDURE
Anyone wishing to challenge this agency's decision for authorizing the construction of
this facility may do so, provided that a petition for administrative review is filed as required by
IC 4-21.5-3-7. The petition must be submitted within fifteen (15) days of the date of mailing of
this permit notification. The petition must include facts demonstrating that you are either the
applicant, a person aggrieved or adversely affected by this decision, or otherwise entitled to
review by law. Additionally, IC 13-15-6-2 requires that your petition include:
I. The name and address of the person making the request;
2. The interest of the person making the request;
3. Identification of any persons represented by the person making the request;
4. The reasons, with particularity, for the request;
5. The issues, with particularity, proposed for consideration at the hearing; and
6. Identification of the permit terms and conditions which, in the judgement of the
person making the request, would be appropriate in the case in question to satisfY
the requirements of the law governing permits of the type granted or denied by
the Assistant Commissioner's action.
7. Pursuant to IC 4-21.5-3-1(1), any document serving as a petition for review or
review and stay must be filed with the Office of Environmental Adjudication.
Filing of such a document is complete on the earliest of the following dates:
a. The date on which the petition is delivered to the Office of Environmental
Adjudication, Indiana Government Center North, 100 North Senate
Avenue, Room 1049, Indianapolis, Indiana 46204;
b. The date of the postmark on the envelope containing the petition, if the
petition is mailed by United States mail; or
c. The date on which the petition is deposited with a private carrier, as
shown by a receipt issued by the carrier, if the petition is sent by private
carrier.
..
..
"
.'> r
,
I
"
ConstructionlStonnwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: West Carmel Marketplace County: Hamilton
Plan Submittal Date: 11/26104 Hydrologic Unit Code: 512020 I 090070
Project Localloa Description: East side ofU542l, 1/4 mile south of 100th Street
Latitude aDd Longitude: Lat- 39-5S'-S6"N Long- 86-13'-48"W
= Civil Townsblp: Clay Quarter: Section: 7 Towasblp: 17N Raage: 3E
= .
1 Project Owaer Name: Duke Realty Corp.
.. Coatad: Mary Solada with Bingham McHale lLP
=
"a Address: 10 West Market Street, 2700 Market Tower
': City: Indianapolis State: IN Zip: 46204-4900
.~ Phone: 317-635-8900 FAX: 317-236-9907 E-Mail: mso1ada@binghammchale.com
e..., .
CI. Plan Preparer Name: Greg Snelling
AJII1lation: W oolperllLP
Address: 7140 Waldemar Drive
City: Indianapolis State: IN Zip: 46268
Phone: 317-299-7500 FAX: 317-291-5805 E-Mail:
Review Date: 12I06I04
~ Priaclpal Plan Reviewer: John B. South P.E. CPESC
'~Ageacy: Hamilton County Soil and Water Conservation District
~ Address: 1108 South 9th Street
5 City: Noblesville
it Phoae: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
L!J PLAN IS ADEQUATE: A comprebeaslve plan review bas been completed aDd it bas heea determined that the
plan satisfies the mlnlmmD requlremeDllI aDd iDtent of 3Z7IAC 15-5.
o Please refer to additioual iDformatioD iDc1uded OD the followlag pagels).
[2] Suhmlt Notice of InteDt (NOI): Attach a copy of this cover page when submitting the NOlto the Indiana
Department of Environmental Management Construction activities may begin 48 hours following the submittal of
the NOI. A copy of the Nor must also be .entto lhe Reviewing Authority (e.g. SWCD, DNR).
o A preliminary plan review bas heea completed; a comprebeaslve review will not be completed witbiD lbe 28-day
review period. The reviewing authority reserves the right to perform a comprebeaslve review at a later date aDd
revlsloll8 to the plan may be required at that time to address defldeacies.
o Please refer to addilloual iDformalloD iDcluded on the foUowlag pagels).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOlto the Indiana
Department of Environmental Management. Construetion activities may begin 48 hours following the submittal of
the NOI. A copy of lhe NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR).
o PLAN IS DEFICIENT: Signilkant dellciencles were idendlled during tbe plan review.
o Please refer to additioual iDformallon iDcluded on tbe foUowing pagels).
o DO NOT file a Notice of Intent for tbls project.
o DO NOT commeace land d1sturblag activities until aU dellciencies are adequately addressed, tbe plan re-
submitted, and notification bas heen received that the minimmD requirements have heen satislled.
o Plan Re.lsioas 0 Dellcient lte... should be mailed or dellvered to the Principal Plan Reviewer identified
in the Plan Review SectIon above.
DNR, Division of Soil Constrvation
Page 1 018
Revised /2109103, Form /
v
(
;
".
.'
ConstructionlStormwater PoUution Prevention Plan. Technical Review and Comment (Form 1)
iIProject Name: Wesl Carmel Marketplace I
~ Reviewed: 12106104 .
The technical review and commenl. are intended to evalIMJle the complelene3.S of the ConslruclionlStormwater Pollution
Prevention Plan for the project. The Plan submined was nol reviewed for the adeqIMJcy of the engineering design. All
mea.ures included in the plan. as well as t/w.. recommended in the comment.! s/wuhi be evalIMJled a. to their feasibility
by a qIMJlified individual wilh structural measure. designed by a qIMJlified engineer. The Plan /W. not been reviewed
ror Olher local. state. or federal permi,. Ilml may be required to proceed with this project. Additioflfll informalion.
including design calculations may be ,.quested to funher evalIMJte the Plan.
~II proposed slormwaler pollulion prevention mea.ures and t/wse referenced in this review must meelthe design criteria
and standards setfonh in the "/ndiaflfl Stormwater QIMJlity ManIMJl"from the /ndiaflfl Depanment of Notural
Resources. Divi.rion of Soil Conservation or similar Guidance Document.!.
Please direct quesdollS and/or commenta regarding IhIa plan review 10:
John B. South P.E. CPESC
Please refer 10 the address and contact informadon identified in the Plan Review Section on page 1.
Assessment of Construction PIan Elements (Section A)
The COlIStrucdon Plan Elementa are adequately represented 10 complete a plan review:
o Yes 0 No
The Items checked below are deficient and require submittal 10 meet the requirementa of the role.
A : ;~.t:~~tl~~~;;.:~~~~~~:~~:~m~\j/~;~*1i1~~tlt~~~~~:~~~'.\~~;~~~; A ~tr{~g~1~t?:J~?;7~f;;:?Pi~~i:~r'-:lj,jG/~~:'~V:::;:_1 ;i".i' ~.
h
~ 1 Index showing locations of required Plan Elementa
,.-,',
o 2 11 by 17 inch pial showing building lot
numbenlboundaries and road layoul/narnes
h
""""
h
""""
3 Narrative describing the nature and purpose of the
project
Legal Description of the Project Site
5 (Include Latitude and Longitude - NO! Requirement)
o 4 Vicinity map showing project localion
o 6 ~alion of all Iota and proposed site
unprovements (roads. uliUlies, strUCtures. cle.)
o 8 Nota~ion of any State or Federal water quality
pemuts
...., 9 Specific points where stormwater discharge will leave 0 10 Location and name of all wetlands. lakes and
'-' the site water courses on and adjacent to the site
o 12 Identification of potential discharges to ground
water (abandoned wells, sinkholes, etc.)
o 13 100 year floodplains. floodways, and floodway fringes 0 14 Pre-consln1Ction and post construction estimate of
Peak Discharge <10 v.... sl<lnn """)
o 16 Locations and approximate boundaries of all
disturbed areas (Construction LimilS)
o 18 ~i~s ~p including soil descriplions and
lumtatlons
o 19 Locations. size and dimensions of proposed stormwater 0 20 Plans.for any off-~ite c~nstruction aclivities
systems (e.g. pipeS, swales and channels) assocIated WIth thIS project (sewer/water tie-ins)
o Locations of ptoposed soil stockpiles and/or 0 22 Existing site topography al an interval appropriate
2J borrow/disposal areas to indicate drainage patterns
P Proposed final topography al an interval appropriate to
2J indicate drainage patterns
~ 7 Hydrologic unit code (14 Digit)
o 1 J Identification of all receiving waters
o IS Adjacenllanduse. including upstream watershed
o 17 Idenlification of existing vegetalive cover
DNR. Division of Soil Constrvalion
Page 2 oU
Revised /2I09/V3. Form /
.'
. .
(
ConstructionlStormwater Pollution Prevention Plan. Technical Review and Comment (Forml)
I!ProJect Name: West Carmel Marketplace I
~te Reviewed: 12I06.U4
Jl ..
.!l .. l ~
!I .~ 8:
i~ ..:
~!~
J :J ,.,
_~1
GO~:
~ .J;~
JOO
GOD
GOD
GOD
GOD
P00
1Jl 0 :1-.
~ '::1
80ftl
01L-'wt
00"
L!.04!
,-,GO
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
Sto~water PoffiitiOil Preventii:iii Plan'. COnstructli1l1 Component (SeCtiOn B)
17re construction componenl of the Stormwater Pol/ution Prevention Plan includes stormwater quality
:;-'-
m1!asU,.s to address erosion. sedimentation. and other pol/utanu associated with land disturbance and
construction aClivitieJ. Proper implementation of the plan and inspections of the construction site art!
necessary to minimize the discharge of pol/utants. 17re Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the peiformance of a practice or the
effectiveness of the plan. 17re plan must be a flexible document. with provisions to modify or substitute
B practices as necessary.
1 Descrlptioa of poteatIaJ poUutaat sources associated with constnJctioa activities
:2 Sequeace describiag stormwater quaUty measure implemeatation relative to land d1sturbiag
activities
3 Stable construction entrance locations and specifications (at aU points of iagress and egress)
4 Sedlment control measures for sheet flow areas
S Sedlment control measures for coacentrated flow are88
6 Storm sewer inlet protection measure locatio as aad specificatioas
7 RunolTcontrol measures (e.g. diversions, rock check dams. slope drains. etc.)
8 Storm water outlet protection specificatioas
9 Grade stabillzatioa structure locations and specifications
10 Location, dimensions, specifications, and coastnJction details of each stormwater quaUty measure
11 Temporary surrace stabilization methods appropriate for each season (include sequencing)
12 Permaneat surface stabilization specificatioDl (include sequencing)
13 Material handUDg and spill preveation plan
14 MonItoring and maintenance guideUnes for each proposed stormwater quaUty measure
IS Erosloa & sedimeat control specificatioas for individual building lots
>::i Storm~~~rron9d.,9!j~t~I1~~P1,ii~.I'~ CO~<<:tIon t:omponent (Section C).
~'" 17re post construction component of the Stormwatu Pollution Prevention Plan includes the
"r implem1!n/ation of stormwatu quality m1!asure. to address pollutanl' that will be associated with the
I:naI landUSt. Post construction stormwater quality measurt.J should be functional upon completion 0#
~:> ;;;;, project. Long term functionality of the m1!asures are critical to their peiformance and should be '
J '~ monitored and maintained,
~ -
!I .~
i~
~!
:2J 0 ..
:2J0
:2J0
:dO
2J ]
I Description of poUutants and their sources associated with the proposed land use
2 Sequence describlDg stonnwater quaUty measure implementation
3 Description of proposed post coDltruction stormwater quaUty measures
(Include a writ/en description of how these m1!asures will reduce discharge of expected pollutants)
4 Location, dimensions, specifications, and coastructioa details of each stormwater quaUty measure
S Description of maintenance guidelines for post construction stormwater quaUty measures
Page 3 or8
Revised IUJ9IOJ. Form J
DNR. D;y;.sion of Soil Consuva/ion
,
.'
(
(
ConstructionlStormwater Pollution Prevention Plan" Technical Review and Comment
'iIJ'roject Name: West Carmel Marketplace I
I12:.te Reviewed: 12106104 _
The manufacture will not weld single wall pipe because the joint is too weak. Plus, the standard slit perforations do not
meet the requirements for sed. basin risers. Recommend using double wall pipe or steel CMF. Perforations- Drill 10- 3/4"
holes evenly around the pipe and space rows 4" a.c. Holes should extend all the way to the bottom of the riser. Note-
Contractor should already be working on this as prefabrication takes time.
Recommend on sheet 403 to include information about dewatering bags.
Please provide me with an Il"x 17" copy of sheet 304.
B 15- If there is a potential for future projects that are less than one acre, a practice summary is needed for these outlolS.
Please include the standards listed in Sec. 7.5 in Rule 5.
cc: Carmel, Surveyor, File
DNR. Division oj Soil Constrvation
Page 4 018
R.vi..d /2109103