March 18, 200S
Carmel Clay CommunicatiON Cemer
l\ lot AVENue. N. W.
eMMa., INOL\NA ~Z
1111S11.ZSao
Duke Reality Coporation
600 E 961h St 1#100
Indianapolis. Indiana 46240
Ann: Rodney Reinhart
Dear Rodney,
This is fonnal notification of addresses assigned to the projcc:t called Walnut Creek
Marketplace. The following arc the addresses as.qigncd to the project:
. The big RetaJI Center -10025 N Michipn Road
· L.eal 985314 Mlcn.gaD Ra."
· La. J ~IGI H Alkhi.._ R1j-d
All tenant spaces in each building with have to utilize suite numbers in the 100 series in
increments of 1 0, except for the big retail which could use increments of 20 for future
tenant space splits. The suite numbers will need to l1J.1lleft to right as you face the front I)f
the building. Please be sure there is sufficient silP18ie along MiChigan Road to signify the
location of the Marketplace Center.
Please keep this letter as proof of the addresses assigned, you will need to show it when
applying for permits with the City of Carmel. If you have any questions or concerns feel
free to contact me at the above number.
Sincerely,
~~
Bill Akers
9 J I Operations Manager
Carmel Communications Center
!.
.
/.
I
.'
," r
.
ConstructionlStonnwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: West Carmel Markelplace County: Hamilton
Plan Submittal Date: 11/26104 Hydrologic Unit Code: 5120201090070
Project LocatloD DescriptloD: East side of US42 I. 1/4 mile south of 100th Street
Latitude aad Loagitude: Lat- 39-55'-S6"N Long- 86-13'-48"W
= Civil Township: Clay Quarter: SectIoD: 7 TOWIISbip: 17N Range: 3E
=
l Project Owner Name: Duke Realty Corp.
I: CODtact: Mary Solada with Bingham McHale LLP
=
'a Addresa: 10 West Market Street, 2700 Market Tower
': City: Indianapolis State: IN Zip: 46204-4900
.!!, Phone: 317-635-8900 FAX: 317-236-9907 E-Mail: msolada@binghammcbaIe.com
e
i:I. PIaa Preparer Name: Greg Snelling
AftIIlatIoa: W oolperl LLP
Addresa: 7140 WaIdemar Drive
City: Indianapolis State: IN Zip: 46268
Phone: 317-299-7500 FAX: 317-291-5805 E-Mail:
Review Date: 12106/04
~ PrIncipal PIaa Reviewer: John B. South P.E. CPESC
.~ Agency: Hami1toD County Soil and Water Conservation District
~ Addresa: 1108 South 9th Street
,; City: Noblesville
ll; Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
l;!J PLAN IS ADEQUATE: A comprebensive plaa review bas heeD completed aDd it bas heeD determined tbat!be
plaa satisfies !be mIni........ reqWremenlll and InteDt of 327 lAC 15-5.
o Please refer to addltionallnformatioD Included OD the foDowing page(o).
[2] Submit Notice of IDtent (NOI): Attach a copy of this cov~r pag~ w~n submitting t~ NOlto t~ Indwna
D~partrMnt of Enviro~ntal Manag~_nt Construction activiti~s may b~gin 48 hours following t~ submittal of
t~ NOI. A copy of t~ NOI must also b~ s~nt to t~ R~iewing Authority (~.g. SWCD, DNR).
o A preUmlaary plaD review bas heeD completed; a comprebensive review will Dot be completed within the 28-day
review period. The reviewing authority reserves !be right to perform a comprehensive review at a later date aDd
revisions to !be plaa may be required at tbal time to addresa deftdeDcles.
o Please refer to addltIonallnformatioD Included on !be foDowing page(o).
o Submit Notice of IDteDt (NOI): Attach a copy of this cov~r page w~n submitting t~ NOlto t~ Indiana
DepartrMnt of Enviro~ntal Manage_nt. Construction activities may begin 48 hours following t~ submittal of
t~ NOI. A copy of t~ NOI must also M sent to t~ R~iewinlJ Authority (e.g. SWCD, DNR).
o PLAN IS DEFICIENT: SipillcaDt delldeacles were identified during lbe plaD review.
o Please refer to addltlonallnformatloD Included OD lbe foDowing page(o).
o DO NOT IIIe a Notice of IDteDI for this project.
o DO NOT commence IaDd disturbing activities until aU dellcleades are adequately addressed, tbe plaD re-
submitted, aad OOti1icatiOD bas heeD received that !be mlnlmllm requiremeDIlI have heeD satisfied.
o PIaD Revlsioos 0 Dellcient ItelDl sbould be mailed or deUvered to the PrIncipal PIaD Reviewer ideDtifted
ill tbe PIaa Review SectiOD above.
DNR, Division of Soil ConstMJlion
Page 1 oU
Reviud 12109103, Fomr I
v
(
,
\
ConstrucdonlStormwater PoUndon Prevendon Plan - Technical Review and Comment (Form 1)
ilrroJect Name: West Carmel Marketplace I
\l2:.te Reviewed: 12106104 .
The technical review and commelll.! are intended to evalUlJte the completeness of the ConstructionlStormwater PoilU/ion
Prevention Plan for the project. The P/an submined was not reviewed for the adeqUIJcy of the engineering design. AU
measures included in the plan. as well as those recommended in the commenl.f should M evalUlJted as to their feasibility
by a qUIJlified individUIJI with structural measures designed by a qUIJlified engineer. The Plan has not been reviewed
for other locat state. or federal pennits that may M required to proceed with this project. Additional information.
including design calculations may be requested to further evalUIJte the Plan.
All proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria
and standards sotforth in the "lndiDna Stormwater QUlJlity Manual"from the IndiDna Deportment of Natural
Resources. Division of Soil Conservation or similar Guidance Documents.
Please direct quesdons and/or commenlli regarding tbIs plan review to:
John B. South P.E. CPESC
Please refer to the address and contact lnformadon Identified in the Plan Review SectIon on page I.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elemenlli are adequately represented to complete a plan review:
0 Yes 0 No
The ltelllS chec:ked below are deflclent and require submittal to meet the requlremenlli of tbe rule.
A . ;~t:.~tl~~~}~.~~~~;~~~:'~_~JJ-ff)~,j:~!~tl1$3~-:~~~,~~~~~~1*?~'~ A ~~r.:~.01~<?J~i~1~~;?Jt,J~:~7~fw,;rl~:'~r~:'i:i-:~~~i; :.' '::";
~ I Index showing locations of required Plan Elements 0 2 11 by 17 inch plat showing building lot
L..J numbenlboundaries and road layout/names
~ 3 Narrative describing the nature and purpose of the 0 4 Vicinity map showing project location
L..J project
~ Legal Description of the Project Site 0 Location of all lots and proposed site
L..J 5 (Include LalibJde and LongibJde - NO! Requirement) 6 improvements (roads, utilities. structures, etc.)
~ 7 Hydrologic unit code (14 Digit) 0 8 Notation of any State or Federal water quality
L-J permits
h 9 Specific points where stormwater discharge will leave 0 10 Location and name of all wetlands. lakes and
~ the site water courses on and adjacent to the site
0 11 Identification of all receiving waters 0 12 Identification of potential discharges to ground
water (abandoned _lis, sinkholes, etc.)
0 13 100 year floodplains, f100dways. and f100dway fringes 0 14 Pre-construction and post construction estimate of
Peak Discharge (10 Year ,tonII tv....)
0 15 Adjacentlanduse. including upstream watershed 0 16 Locations and approximate boundaries of all
disturbed areas (Construction limits)
0 17 Identification of existing vegetative cover 0 18 Soils map including soil descriptions and
limitations
0 19 Locations, size and dimensions of proposed stonnwater 0 20 Plans for any off-site construction activities
systems (e.g. pipes, swales and channels) associated with this project (se_r/water lie-ins)
0 21 Locations of proposed soil stockpiles andlor ~ 22 Existing site topography at an interval appropriate
borrow/disposal areas to indicate drainage patterns
~ Proposed final topography at an interval appropriate to
-' 23.
IUdicate drainage patterns
DNR. Division of Soil Conservation
Page 2 oU
Revised /2/091fJ3. Form /
.'
. .
i
\
ConstructionlStormwater Pollution Prevention Plan. Technical Review and Comment (Form I)
\\Project Name: West Carmel Marketplace I
~te Reviewed: 12106104
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
Stormwater PoUUtlOil Prevention Plan'. COnStruction Component (SectiOn B) .
'. -, .-. '.
.. T7re construction componenl of the Stormwater Pollution Prevention Plan includes stormwoter quolity
..!l measures to address erosio/l, sedimentatio/l, and other pollutants associated with land disturbance and
i , construction activities. Proper implementation of the plan and inspections of the construction site ore
.!l ... necessary to minimize the discharge of pollutants. T7re Project Site Owner should be aware that
! = unforeseen construction activities and weather conditions may affect the performance of 0 practice or the
.!:! ... ,;
I ... < effectiveness of the plall. T7re plan must be 0 flexible documen~ with provisions to modify or substitute
IC ~
~ ~ ;Z; B practices as necessary.
'7 Fi ~-~. 1 DescriptIon or potenlial poUutaDt sources associated witb coDStruction activities
~ ~: 2 Sequence describing stonawater quality measure Implementation relative to Iaad disturbing
activities
~ -J ~~. 3 Stable cODStruction entrance locatioDS and SpecificatiODS (at aU points of Ingress and egress)
~ 0 0 4 SedIment control measures for sbeet now areas
~ 0 0 5 SedIment control measures for concentrated now areas
0 0 0 Ii Stona sewer inlet protection measure locatioDS and specificationa
~ 0 0 7 RUDOIY control measures (e.g. diversions. rock check dams. slope drains. etc.)
0 0 0 8 Storm water outiet protection specificationa
0 0 0 9 Grade stabilization structore locationa and SpecificatioDS
0 0 " 10 Location, dlmeDSloD8, specificatiOD8, and conatruction details or eacb stonawater quality measure
i.Jf
~ 0 I 11 Temporary surface stabilization metbods appropriate for eacb season (include sequencing)
-
L.:!.J 0 r, 12 Permanent surface stabilization SpecificatioDS (include sequencing)
~ 0 ". 13 Material handling and spill prevention plan
;;
L.:!.J D~ 14 Monitoring and maintenance guideUnes for eacb proposed stonawater quality measure
DI 010 15 Erosion & sediment control specifications for individual building lots
1\:1: Stormw~fct(Pol!ijt,i9!~t~Ilt.f~P'Iii~.l'~ ~oDsti'1!~OD ~iimpOnent (Secdo. C)
:r' T7re post construction component of the Stormwater Pollution Prevention Plan includes the
",.. implementation of stormwoter quality measures to address pollutonts that will be associated with the
.!l ... .C ,;,allanduse. Post construetion stormwater quality measures should be functional upon completion of
! =
" ~
Q' '0 the project. Long term functionality of the measures ore critical to their performance and should be
~ IC ..
< ~ I C monitored and maintained.
0 0 :-. 1 Description or poDUlants and their sources associated witb the proposed land use
-
0 0 2 Sequence describing stonawater quality measure implementation
0 0 3 Description of proposed post coDStruction stonawater quality measures
(Include 0 wrillen description of haw these measures will reduce discharge of expected pollutants)
0 0 4 Location, dlmensioD8, specificatioD8, and construction details of eacb stonawater quality measure
0 0 5 Description of maintenance guideUnes for post construction stonawater quality measures
DNR. Division of Soil Conservation
Page 3 on
Revised /2I09IV], Form I
"
//'-
\,
COlIStructionlStormwater Pollution Prevention Plan" Technical Review and Comment
/JProjed Name: West Cannel Marketplace I
/l2:.te Reviewed: 12/06104
The manufactun: will nol weld single wall pipe because the joint is too weak. Plus. the standard slit perforations do not
meet the requirements for sed. basin risers. Recommend using double wall pipe or steel CMP. Perforations- Drill 10- 3/4"
holes evenly around the pipe and space rows 4" O.C. Holes should extend all the way to the boltOm of the riser. Note-
Contractor should already be working on this as prefabrication lakes time.
Reconunend on sheet 403 to include information about dewatering bags.
Please provide me with an II"xI7" copy of sheet 304.
B 15- If there is a potential for Cutun: projects that are less than one acre. a practice summary is needed for these out lots.
Please include the standards listed in Sec. 7.5 in Rule 5.
cc: Cannel, Surveyor. File