Loading...
HomeMy WebLinkAbout06010163-State Release Would you like to reduce your turnaround time? ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT efile24-7@dhs.state.ln.us. Or VISIT OUR WEB SITE AT www.in.gov/dhsJosbc Project number _~iJr::~r';~ji! " ~\"'- -~ _.":~ \~"--i"""-"'~ --......!..~ CONSTRUCTION DESIGN RELEASE State Fonn 41191 (R9/S-98) Report Printed on: January 11, 2006 INDIANA 02 J:oo~ERAQPO Indiana Department of Homeland Security DIVISION OF FIRE SAFETY / PLAN REVIEW 402 W. Washington St., Room E245 Indianapolis, IN 46204 To: Owner J Architect I Engineer D A Levy and Associates David A Levy 00910166 345 Springside Drive AKRON OH 44333 Avallllble Af. YotIf Local Licence Branch SUPPORT HOOSIER SAFETY 315217 Construction type II-B, SPK Scope of release ARCH ELEC PLUM Release date 12/22/05 M MECH Type of release Standard Project name Clarks Clay Terrace Street address 14395 Clay Terrace Blvd C29 City CARMEL County HAMILTON Fax & e-mail: 3306668334, dlevy@dalevy.com The plans, specifications and application submitted for the above referenced project have been reviewed for compliance with the applicable rules of the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions listed below. THIS IS NOT A BUILDING PERMIT. AU required local permits and licenses must be obtained prior to beginning construction work. All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with and released by this Office before any work is'altered. This release may be suspended or revoked if it is determined to be issued in error, in violation of any rules of the Commission or if it is based on incorrect or insufficient informatron. This release shall expire by limitation, and become null and void, if the work authorized is not commenced within one (1) year from the above date. CONDITIONS: Note :(A 1A & A 1B): In accordance with the affidavit swom under penalties of perjury in the application for construction design release the plans and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000. In accordance with Section 19 of the General Administrative Rules (675 lAC 12..s-19) a complete set of plans and specifications that conform exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a copy of the design release. 3B THIS PROJECT HAS BEEN REVIEWED UNDER THE 2003 INDIANA BUILDING CODE. 4G0412AF No addition, alteration, or repair shall reduce existing exit capacities to less than that required under the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction in accordance with 675 lAC 12-4-12(d). 4G0603AF Plans and specifications for the revised fire suppression system shall be filed with the required application, fees, and complete details in accordance with 675 lAC 12-6- 3(a), 7(h)17 and 675 lAC 13-1-8. (N.F.PA #13) 3B 1 0031 The means of egress is to be physically constructed in such a way that the exit path is pennanently maintained in accordance with Section 1003.2.8, IBC (675 lAC 13-2.4). Please be advised that If an administrative review of this action is desired, a written petition for review must be filed at the above address with the Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above- stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will be conducted by an administrative law judg"e of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will be final, and you must comply with fts requirements. Page 1/2 I' , Would you like to reduce your turnaround time? ELECTRONICAlLY FILE YOUR PROJECT WITH STATE OF INDIANA AT efiJe24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.ln.gov/dhs/osbc Filed By Gode review official Code Enforcement & Plan Review Branch Director GERALD KELLEY ~~d/S~ Address (name,title of local official,street,city,state and ZIP code DEPT OF COMMUNITY SERVICE State Fire Marshal V1df' 0 ~ JIM BLANCHARD ONE CIVIC SQUARE CARMEL, IN 46032 Fax & e-mail: 3175712499, iblanchardt8lcarmel.in.aov Page 212