HomeMy WebLinkAboutChange Order 1; Calumet Civil Contractors, Inc.; ($0); #16-ENG-37 116th Street and Medical Drive at Range Line Road RAB; CO #1; Date Change to 4.27.22 DocuSign Envelope ID:AD2D31C9-FE04-41DC-9F20-6DBABED53696
APPROVED
City of Carmel Project 16- ENG-37
Roundabout Improvements : 116th Street
and Medical Drive at Range Line Road
CHANGE ORDER #1
Substantial completion date for the Medical Drive and Range Line Road roundabout is being updated
due to material delays for obtaining water main HDPE pipe and other water main items. Calumet
updated the construction schedule for this roundabout to start on March 14, 2022 and be substantially
complete in 45 days on April 27, 2022.
Contract Price prior to this Change Order $5,439,000.00
Contract Price will not be changed by this Change Order $0.00
New Contract Price including this Change Order $5,439,000.00
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $5,439,000.00 N/A N/A
CO1 $0.00 $5,439,000.00 0.0%
DocuSign Envelope ID:AD2D31C9-FE04-41DC-9F20-6DBABED53696
CITY OF CARMEL
TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 1
City Engineer DATE: April 6, 2022
City of Carmel Indiana PROJECT NAME: Medical and Range Line RAB
One Civic Square CITY REQ. NO.:
Carmel, IN 46032 CITY PO NO.: 16-ENG-37
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
Substantial completion date for the Medical Drive and Range Line Road roundabout is being updated
due to material delays for obtaining water main HDPE pipe and other water main items. Original
substantial completion date was November 12, 2021. Calumet updated the construction schedule for
this roundabout to start on March 14, 2022 and be substantially complete in 45 days on April 27,
2022.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (i-)OR ( - ) DAYS
ll. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.: N/A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 5,439,000.00
Contract Price will be lowered by this Change Order
New Contract Price including this Change Order 5,439,000.00
Contract lime prior to this Change Order Days 11/12/2021 Substantial Completion Date
Contract Time prior to this Change Order Final Completion Date
Net increased/decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days 4/27/2022 Substantial Completion Date
Current Contract Time including this Change Order Final Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work,
The Above Changes Are The Above Changes Are Accepted Approved
Recommended
American Structurepoint, Inc. Calumet Civil Contractors, Inc. Not Present
ENGINEER CONTRACTOR James Brainard, Mayor
e—DocuSigned by:
9025 River Road, Suite 200 4898 Fieldstone Drive
twit,
Address Address "IVrNiATili Burke, Member
coo Signed by:
Indiana ohs, IN 46240 Whitestown IN 46075 Levi 004SGIA,
City/StaieZip '7)19)2WtftTbn, Member
Jerem ash tan, 1E,City Engineer
By: ,e7../..,,e; 71/Zcz.e. aa- By: sh,e-Gbi/matter
DocuSigned by:
ATTEST:
Phone: 317-281-9563 Phone: 317-362-1763 RillACIgn7AgliddrA
Sue Wolfgang, Clerk
4/20/2022
Date: 04-06-2022 Date: 04/07/2022 Date:
DocuSign Envelope ID:AD2D31C9-FE04-41DC-9F20-6DBABED53696
American Structurepomt, Inc.
Change Order Details
6-ENG-37 - 116th and Rane,e Line Road RAB
Description Roundabout construction at Range Line Road and 116th Street,roundabout construction at Range Line Road and Medical Drive, and corridor
improvements along Range Line Road from 116th Street to Carmel Drive including mill and resurfacing,storm sewer installation, shared-use
path and sidewalk construction,driveway construction, lighting, and landscaping.
Prime Contractor Calumet
NAlhitestown, IN
Change Order 1
Status Pending
Date Created 04/06,2022
Type Changed Conditions
Summary Change Order 4 1
Change Order Description Change order er 1 is being created to update the construction dates for the Medical RAB along Rangel ine Road. This project had to he built
during 2022 construction due to material delays on getting the I-IDPE water main at the end of 2021.
Awarded Project Amount 55,439,000.00
Authorized Project Amount 55,439,000M0
Change Order Amount 50.00
Revised Project Amount 55,439,000.00
Change Order Details: 04/06/2022
16-ENG-37- 116th and Range Line Road RAB Page 1 of 2
DocuSign Envelope ID:AD2D31C9-FE04-41DC-9F20-6DBABED53696
Time Limit Changes
- -,,,,,.-N,- --,----.,,,,,,--,.,T,---- ,A,k--,-.-',--,,-,''',>1-,'Z-:". -----,\'''-7-----7- -a„--,--,,,_,,,',--,‘,-- ---,<-_,'-----,-*:"_ - _,----- s-'s-,- „ ,•- --'*-\--.::, '------'-',-------- --',...-,-. .-'-'%-------. . ----- 1 ._.:-:D 6-!1t Olive
:,,------,---- '''', .----',.,, <-'rk-,-7'-,*-- -- -.=----,,,-;'- ,,,*.-'' '.',:„'-`,--k- -,`_ _--„,,, „•,- .. -'7.-',-,',„_,-,L'k-'1,,= =--S<------,i„'''v•--------- --- --- _-_'-----,=,„,„_,---‘,- --„,--=',- ---, ' , - Au•au ----„_,Z=,---,------,-=-_-,_-'-,,:._ ,-,._,-,_,, -,,,_.,,,-,,,-- --,
e..,:•,-‘e,p ,----._.1_,:eee--1-kee----1,--_ _1,‘‘-‘e„ ..,,,,,eee------e-e-,*eee.,--- --_,,eee_4-es.a.A.$\,Z,T,..„-er,..-1-e.\--_,,,,i.:::-.-,:e*e--,..,,-,--,-.-_ -.,,,..eee.7--\.%.,---- --„,.—e-
-,-,.-,a-,.-,-e-eeee_--z,-„ ,e,
1 66.0 Days
11:12'2021 11'122021 Completion Date 04;27.2022
Medical Drive& Range Line Road RAB - Substantial Completion
- 1 -,
Reason: Material delays in ,..0,..1
1 time limit
Change Order Details: 04/06/2022
Page 2 of 2 16-ENG-37-116th and Range Line Road RAB