HomeMy WebLinkAbout06020014-State Release
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/5-98)
Report Printed on: January 10, 2006
Would you like to reduce your turnaround time?
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA AT
efile24-7@dhs.state.in.us, Or VISIT OUR WEB SITE AT www.in.gov/dhs/osbc
ProJoect number I Release date
E-Filed, No hard
315485 copy will be mailed ! 01/10/06
i Construction type \ Occupancy classification
! I-A. SPK I B, REM
: Scope of release
I ARCH ELEC MECH
I PLUM
I Type of release
I Standard
Indiana Department of Homeland Security
DIVISION OF FIRE SAFETY / PLAN REVIEW
402 W. Washington St., Room E245
Indianapolis, IN 46204
Note :(A 1 A & A 1 B): In accordance with-the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specifications filed in c~:mjuricfiOD.~i~h this project shall comply with all of the applicable .rules'and laws of Fire 'Prevention and B:uilding Safety
qommission. Providing fa!se inforrrat,io.n constitutes an act of perjury, which is a Class 0 felony punishabl~ by a prison term and a fi~e up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 lAC 12~.1g) a complete set of plans and specifications that conform
exactly to the design that was released'by the office of the state,building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.' . ,
4G0603AF Plans. and specifications for the revised fire suppression system shall be filed with the required
. ,applic'Btion, fees, and complete details in accordance with 675 lAC 12-6- 3(a), 7(h)17 and 675 lAC
1,3-1-8. (N.F.P.A. #13) :
4G0412AC. . .~6 addition or alteration shall cause an existing building, structure, or any part of the 'permanent
heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, ;emergency
'" ' communication, or fire or explosion suppression systems to become unsafe or overloaded under
the provisions of the rules of the Commission for new construction in accordance with 675 lAC 12-4-
_1~(c)m___._ .
4G0412AF No addition, alteration, or repair shall reduce existing exit capacities to less than that required under
the provisions of the rules of the Indiana Fire and Building Safety Commission for new construction
in accordance with 675 lAC 12-4-12(d).
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above -
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will
be final, and you must comply with its requirements.
Page 1/2