Loading...
HomeMy WebLinkAboutDepartment Report 07-28-97 ;, �� CAA2i` :. , G \t�� City Carmel y9'L/�`�o <<TON c°=%' DEPT. OF COMMUNITY SERVICES July 23, 1997 Department Report To: Board of Zoning Appeals Members From: Department of Community Services re: projects scheduled to be heard on July 28, 1997 Public Hearings: 111., 2h. Cellular One Tower(UV-30-97, A-33-97) The petitioner wishes to construct an 80-foot telecommunications tower. Also, by way of letter, the petitioner has requested this project be considered as a special use application in accordance with the recently approved tower ordinance. The Department recommends the project be tabled for an additional thirty days pending the proposed plan's having been brought into compliance with all ordinance requirements and its review by the Technical Advisory Committee. 3h., 4h. Prairie View Subdivision (V-45-97, V-46-97) The petitioner seeks approval to reduce the required side aggregate and side yard setbacks for lots within the Chapman's Claim at Prairie View and Moffitt Farm at Prairie View Subdivisions. The Department recommends denial. The lots within the subdivisions can accommodate houses without practical difficulty. If the developer is desirous of creating wider lots, the subdivisions should be replatted through the Plan Commission. 5h-8h. Heartland Child Development Center (SU-48-97, V-49-97, V-50-97, V-51-97) The petitioner seeks approval to construct a 22,000 square-foot day care center on 3.12 acres. The petitioner also seeks approval for the following three variances: 1. To reduce the required lot size from 5 acres to 3.12 acres. 2. To reduce the required parking spaces by 20. 3. To incorporate a cupola into the height of the building. ONE CIVIC SLL.kRE c'.ARMMEL. IN!'LANA460 3Ii 5_I-24i- Page 2 of 3 This project was approved in March of 1996, however, the Board's approval was only valid for a year from that date. The Department recommends approval pending resolution of the location of the proposed Illinois Street in relation to this site. 9h-12h. King of Glory Church (SU-52-97, V-53-97, V-54-97, V-55-97) The petitioner seeks approval to construct a 12,000 square-foot addition to the existing church and to do other site improvements. The petitioner also seeks approval for the following three variances: 1. A variance to increase the allowable height of the church expansion from 25 feet to 31 feet. 2. A variance to increase the allowable height of the church spire and bell tower from 25 feet to 60 feet. 3. A variance to eliminate the need for curbs around the new parking lot area. The Department recommends approval of the Special Use and the Variance for the height of the church addition pending resolution of the proposed landscape plan and all Technical Advisory Committee issues. The Department recommends denial of the variances relating to the height of the church spire and curbs. The proposed height of 60 feet for the church spire is excessive for this area and the curbs should be installed as the ordinance requires. 13h. Parkwood Crossing, Buildings 4, 5 and the Parking Garages (V-56-97) The petitioner seeks approval of a variance to reduce the required side yard setback from 60 feet to 9 feet. The Development Plan and Architectural Design, Lighting, Landscaping, and Signage applications have been previously approved through the Plan Commission. The Department recommends approval. 14h, 15h. Sycamore Farm Recreation Center (SU-57-97, V-58-97) The petitioner seeks approval to construct a pool and bathhouse for the Sycamore Farm Subdivision. The petitioner also seeks a variance to reduce the required lot width from 200 feet to 35 feet. The petitioner will also be required to replat the existing subdivision through the Plan Commission. , The Department recommends denial of the Special Use and the Variance. The recreation center is an appropriate use within the subdivision, but it should be located in an area that does not interfere with adjacent housing and has adequate frontage on a public street. 16h. L & W Construction Office Building (SU-59-97) The petitioner seeks approval to construct a 6,000 square-foot office building. The petitioner will also be required to replat the existing subdivision through the Plan Commission in order to maintain the proper setbacks for the building. The Department recommends approval pending resolution of all Technical Advisory 111141, Page 3 of 3 Committee issues. 17h. Twin Lakes Golf Course (SU-60-97) The petitioner seeks approval to reconstruct part of the golf course, construct a new maintenance building, and to construct a chipping green. The Department recommends approval pending resolution of the landscape plan and all Technical Advisory Committee issues. 18h. Huntington Bank (V-61-97) The petitioner seeks approval for a variance to allow an additional sign on the ATM building. The Department recommends denial. The ATM sign could be constructed within 3 square feet, which would exempt the sign from ordinance requirements. Old Business: li., 2i., 3i. Days Inn Variances (V-38-97, V-39-97, V-40-97) The petitioner seeks approval of three developmental standards variances: 1. A variance to reduce the required minimum lot size from 3 to 2 acres. (This item may be withdrawn pending the petitioner showing compliance with the Overlay Zone requirements.) 2. A variance to reduce the required side yard setback from 120 to 75 feet (measured from hotel structure to the existing house to the north). 3. A variance to reduce the required side yard landscape yard from 30 feet to 10 feet. The Department recommends approval as submitted. (This project had been tabled at the previous Board meeting and also has been tabled at the Plan Commission.)