Loading...
HomeMy WebLinkAboutM002.0 - EWP LAYOUTProducts PlotID Length Product Plies Net Qty FJ1 14-00-00 11 7/8" TJI® 110 1 2 FJ2 6-00-00 11 7/8" TJI® 110 1 3 FJ3 4-00-00 11 7/8" TJI® 110 1 5 FJ4 2-00-00 11 7/8" TJI® 110 1 1 FJ5 30-00-00 11 7/8" TJI® 360 1 6 FJ6 20-00-00 11 7/8" TJI® 360 1 3 FJ7 18-00-00 11 7/8" TJI® 360 1 4 BM1-2 22-00-00 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 2 2 BM2 20-00-00 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 1 1 BM3-2 20-00-00 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 2 2 BM4-2 14-00-00 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL 2 2 BM6-2 6-00-00 1 3/4" x 9 1/4" 2.0E Microllam® LVL 2 2 BM7-2 4-00-00 1 3/4" x 9 1/4" 2.0E Microllam® LVL 2 6 BM8-4 16-00-00 1 3/4" x 11 7/8" 2.0E Microllam® LVL 4 4 BM5-2 10-00-00 1 3/4" x 11 7/8" 2.0E Microllam® LVL 2 2 BBO2(-2) 12-00-00 3-08 x 11-14 Generic Material 1 1 Ca1 16-00-00 1 1/8" x 11 7/8" TJ® Rim Board 1 6 Connector Summary PlotID Qty Manuf Product H1 14 Simpson IUS1.81/11.88 H2 10 Simpson IUS2.37/11.88 Joist material may be substituted with IB joists.E1E2 E3E4 E19 E5E6 E7E18E8 E34 E33 E9E10 E11E12 E13 E14E15E16E17E351 2 34 5458 111213 1415 16 171819 202122 2324 2526 B1 B228B3 30 B4 B5B6 BM4-2BM5-2BM6-2BM3-2 BM2 BM8-4BM1-2 BBO2(-2)BM7-2BM7-2 BM7-2 Ca1 Ca1 Ca1 Ca1Ca1Ca1 Ca1 Ca1Ca1Ca1Ca1 FJ3 FJ3 FJ2 FJ7 FJ7 FJ7 FJ5 FJ5 FJ5 FJ5 FJ5 FJ5 FJ6 FJ6 FJ6 FJ1 FJ3 FJ2 FJ3FJ3FJ2 FJ4FJ1 FJ7 H1 H1 H1 H1 H1H1 H1 H1H1 H1H1H1 H1H1 H2 H2 H2 H2 H2 H2 H2 H2 H2 H2 1-03-05 1-06-10 ALL CRITICAL STUDS TO BE INSTALLED BEFORE INSTALLATION OF PRODUCT Floor Area: Floor Sheathing: 0 SF 0 Sheets FLOOR DATA Job#: PO#: Date: 3/14/2022 Drawn By: Designed By: Checked By: FLOOR LOADS: TCLL: 40.0 lb/ft² TCDL: 10.0 lb/ft² BCDL: 5.0 lb/ft² Live Load Deflection: L/480.000 Total Load Deflection: L/360.000 On-Center Spacing: 24" U.N.O. SHEET NUMBER: J1.1 I-JOIST & LVL Placement Plan SCALE: 1/4" = 1'-0"1850 N Graham RoadFranklin, Indiana 46131Office:(317) 346-4274Fax: (317) 346-0916TG67A - 2200401Kevin BeherPyatt Builders,1ST FLOOR I-JOIST & LVLPLACEMENT PLAN IMPORTANT THIS DRAWING IS FOR FIELD PLACEMENT OF INDIVIDUAL EWP COMPONENTS ONLY, AND DOES NOT CONSTITUTE AN ENGINEERED DOCUMENT. THE DESIGNER OF RECORD (DOR) AND/OR THE GENERAL CONTRACTOR IS RESPONIBLE TO VERIFY THE OVERALL COMPATIBILITY OF PRODUCTS SHOWN WITH THE CONSTRUCTION DOCUMENTS. NOTE PROPER BEARING AND BEARING DESIGN INCLUDING ANCHORAGE, IS THE RESPONSIBILITY OF THE BUILDING DESIGNER, ARCHITECT AND / OR BUILDING ENGINEER. REFER TO INDIVIDUAL TRUSS DESIGNS FOR REACTIONS, MINIMUM REQUIRED BEARING SIZE, UPLIFT, AND ADDITIONAL LOADS. 84 COMPONENTS DOES NOT ASSUME RESPONSIBILITY IN THESE AREAS OF CONCERN. WARNING WARNINGS, AND INSTRUCTIONS FOR ERECTION OF COMPONENTS ARE INCLUDED IN THE DELIVERY PACKAGE. KEEP THIS INFORMATION ON THE JOB SITE. THESE DOCUMENTS WILL ALSO BE NEEDED FOR JOB SITE INSPECTION. MISUSE AND IMPROPER INSTALLATION OF COMPONENTS MAY RESULT IN FAILURE, BODILY INJURY, LOSS OF PROPERTY, AND / OR LIFE. THIS LAYOUT IS INTENDED FOR THE PURPOSE OF I-JOIST & LVL LOCATION AND PLACEMENT ONLY. REFER TO THE BUILDING PLANS FOR ACTUAL BUILDING CONSTRUCTION.