HomeMy WebLinkAboutS500-Roof Planã
5-3/4"
8-3/4"
7-3/4"
6-3/4"
10:12 ROOF PITCH7:12
8:12
9:12
6:12
HEEL CUT STANDARDS
14:12
9-3/4"
13-3/4"
11-3/4"12:12
4-3/4" 5:12
3-3/4" 4:12
OVERHANG
1'-0" 2'-0"
7-3/4"
9-3/4"
11-3/4"
13-3/4"
N/A
N/A
N/A
N/A
N/A
CONNECTION SPECIFICATIONS (TYP. U.N.O.)
JOIST TO SOLE PLATE (3)10d TOENAILS
SOLE PLATE TO JOIST/BLK'G. 10d NAILS @ 6" o.c.
STUD TO SOLE PLATE (3)10d TOENAILS
BLK'G. BTWN. JOISTS TO TOP PL. (3)10d TOENAILS
RIM TO TOP PLATE 10d TOENAILS @ 6" o.c.
RAFTER/TRUSS TO TOP PLATE (3)10d TOENAILS + (1) SIMPSON
H2.5A
TOP OR SOLE PLATE TO STUD (3)10d NAILS
DOUBLE STUD 10d NAILS @ 24" o.c.
DOUBLE TOP PLATE 10d NAILS @ 24" o.c.
DOUBLE TOP PLATE LAP SPLICE (10)10d NAILS IN LAPPED AREA
TOP PLATE LAP @ CORNERS & (2)10d NAILS
INTERSECTING WALLS
WALL TO FOUNDATION WALL SHTG. LAP w/ SILL PL. &
FASTENED PER SHEAR WALL
FASTENING SPEC.
NOTE: 10d NAIL = 3" x 0.131" GUN NAIL
GAB. END TRUSS TO DBL. TOP PL. 10d TOENAILS @ 8" o.c.
R.T. w/ HEEL HT. 9 14" TO 12" 2x10 BLK EVERY 3RD BAY
FASTENED TO DBL. TOP PLATE w/
10d TOENAILS @ 6" O.C.
R.T. w/ HEEL HT. UP TO 24" LAP WALL SHTG. w/ DBL. TOP PL.
& INSTALL ON TRUSS VERT. -
FASTEN w/ 8d NAILS @ 6" O.C.
R.T. w/ HEEL HT. 24" TO 48" LAP WALL SHTG. w/ DBL. TOP PL.
& INSTALL ON TRUSS VERT. -
FASTEN w/ 8d NAILS @ 6" O.C.
PROVIDE 2x BLK @ EA. BAY AT
TOP OF HEEL
R.T. w/ HEEL HT. 12" TO 16" 2x12 BLK EVERY 3RD BAY
FASTENED TO DBL. TOP PLATE w/
10d TOENAILS @ 6" O.C.
TRUSS MANUFACTURER TO VERIFY THE FOLLOWING:
(REFER TO SHEETS 2.01F AND/OR 2.02F)
1) DO NOT LOCATE ROOF TRUSSES ABOVE PARALLEL PLUMBING WALLS
2) DO NOT LOCATE ROOF TRUSSES ABOVE HVAC CHASES (OR LEAVE
A MIN. 22-1/2” WIDE CLEAR SPACE OVER CHASE)
04/27/22