Loading...
Minutes HO 02-28-22 Petitioner: Tom Lazzara • The majority of the lot cover variance is for the pool and patio addition. The house,garage,driveway,and walk paths within the property total to 35.7%of the lot coverage • We will contribute to the Carmel Engineering stormwater detention fund • The house has 3 street frontages.It was difficult to conform with the 35' front yard setbacks off of Emerson Road and 4th Avenue SW. • We met with the Cannel Historic Commission to discuss our plans and they requested to position our garage to the north,so it conforms with the aesthetics of the neighborhood. We now have a 13' setback instead of a 11'. • 25' setback to the north(Emerson)and to the east(4th Ave SW) • We received comments from a neighbor about concerns of the sightlines and visibility around the corner and we exceed all requirements. • Our pool and paver area will be 10' off of the south property line • We tapered down our driveway apron to 2-car width(24')and brought our lot coverage down to 48% • Presented elevations from all directional views Public Comments: None Department Report: Angie Conn • The Petitioner addressed all of Staff's review comments and Engineering Department concerns by tapering down the driveway apron width • Staff recommends approval of both variance requests Board Comments:Jim Hawkins • Did you receive comments from the neighbor,David Gagliano?He asked you to shift the house. What's the purpose behind that?Tom Lazzara: Yes,we did speak with him and did a site visit.If we were to shift the home, there would be less of a view of the new home from his home office window. We designed the location of the home to align with the home to the north.Mr.Gagliano told us he was supportive of the design of the home. Angie Conn: I'm aware of these conversations.It's more a preference for Mr. Gagliano.He is not here to speak of it.Jim Hawkins: If Planning Staff and the Historic Society are fine with the plans,I will approve. Approved 1-0 subject to addressing all Carmel Engineering Comments. (V)Eaton Residence Lot Cover Variance. The applicant seeks the following development standards variance approval: 4. Docket No.PZ-2022-00016 V UDO Section 2.12 Maximum 35% lot cover allowed,56% requested. The site is located at 436 1st Ave SE(Foster's Addition Replat Lot 2A)and is zoned R3/Residence.Filed by Joe Logan of Timothy Homes,LLC, for Mark Eaton,owner. Petitioner:Joe Logan • There have been other homes and lots that have been approved for additional lot coverage in this area • We are fulfilling the Cannel Engineering requests for drainage improvements Public Comments:None Department Report: Angie Conn • The lots are smaller,and houses are closer to the street in this area • Will the Petitioner pay towards the City's Stormwater fund?Joe Logan: Yes. • Staff recommends positive consideration of this variance request Board Comments:None Approved 1-0 subject to contributing into the Carmel Engineering Stormwater Fund and addressing any remaining Engineering Department comments. BZA Hearing Officer Minutes 2-28-22