Loading...
HomeMy WebLinkAbout06020045-Sq. Ft. - ~ '-.... . ...~. k. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pitts) and discharge line locations p. Geothermal heat pump discharge locations *NOTE: If land is not within a platted subdivision, a legal description is required. .}> , FURTHER NOTES / NOTICES: . }> CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shali approve or deny the Improvement Location Permit within five (S) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shali be issued when the proposed structure, improvement, or use and its iocation conform in ali respects to this ordinance." . }> IN ADDmON TO THE ABOVE-USTED SUBMmAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. }> ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMmED PLANS ARE NOTOF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE,AND EXTENT: OF THE WORK PROPOSED AND TO DETERMINE COMPUANCE WITH ALL APPUCABLE CODES AND ORDINANCES. SUBMITTAL OF ADDmONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INmAL SUBMmAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. }> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining a building permit and/or proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penaities, per Z-2B9 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08. BUILDING & CODE ENFORCEMENT; CITY OF CARMEL. One Civic 5'1'; C.'met IN 46032. ph. (317) 571c2444.' ----~--~- -- .- - ~- I, the undersigned, certify that ali of the above listed information is shown completely and accurately on the attached plot or site plan(s), construction plans, and any other submitted documentation, submitted with the building permit application to the City of Carmel I Clay Township Department of Community Services. I further certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply wiil result in a replacement of the system. (Plumbing Code P-S09-S) Under the penalties of Perjury (Indiana Code 35-44-2-1), I also hereby affirm, under oath, that all of the information I have provided in the table below is true and accurate, to the best of my knowledge and belief, and that I have not knowingly or intentionaliy provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of Community Services regarding the truth of the matters addressed therein. ''''''0' BASEMENT 1st Floor 2nd Floor 3rd Front Rear Total Sq. (Finished and Floor Porch Porch or Ft. of Unfinished) Garages J()3~ /lL-Ji5 6fo TOTAL -, ~ ~, \! 2-6-00 r13~W :T~~ .ct~'l yO rJG--f (JJiJA '-f{J-t% 2012 S:Permits/FORMS/RESIDENTIAL PROCEDURES