Loading...
HomeMy WebLinkAboutM002.0 - EWP LAYOUTIndianapolis Design Center352 South County Road 300 EDanville, IN  46122317-745-9984These placement plans have been prepared with the specifications of TrussJoist products based on project information provided. This service is solely intendedfor product application assurance; and, is not intended to circumvent the needfor a design professional as determined by the building codes. The designerof record and/or builder/framer is responsible to assure these drawings arecompatible with the overall project. These documents are not intended to replacethe building plan (which should be used to determine bearing placement).Please insure measurements of the foundation match those provided at the timeof design.  Builder is responsible to place load bearing members in load path.Architectural Drawings Prepared By:Structural Drawings Prepared By:84 Lumber FranklinKevin BeherPyatt BuildersTG131Rev.a.ByDateDW.CommentsDrawn By:JRChecked By:Date:DW01/26/2022Soho 2200135 Sheet 1 of 1 Main Floor System Not to Scale Confirm this layout with the builder and designer of record.  Make sure all discrepencies are corrected before ordering floor system. All Dimensions are Approximate and Must Be Field Verified. 11 7/8" TJI Joists 24" O.C. Spacing 11 7/8" TJI Joists 19.2" O.C. Spacing Framing Connector Summary PlotID Qty Manuf Product Design Method Face Nails Top Nails Member Nails Skew Slope Backer Blks Filler Web Stiff H202 12 Simpson IUS1.81/11.88 Designed 10- 10dx1.5 - 2- Strong-Grip - -No No No H203 1 Simpson IUS2.37/11.88 Designed 10- 10d - 2- Strong-Grip - -No No No H204 9 Simpson IUS2.37/11.88 Designed 10- 10dx1.5 - 2- Strong-Grip - -No No No H205 1 Simpson MIU2.37/11 Designed 20- 10dx1.5 - 6- 10dx1.5 - -2 No Yes H206 2 Simpson MIU2.37/11 Designed 20- 10dx1.5 - 6- 10dx1.5 - -No No Yes H207 1 Simpson U14 Designed 14- 10dx1.5 - 6- 10dx1.5 -- 2 No Yes Products PlotID Length Product Plies Net Qty FJ101 42' 0" 11 7/8" TJI 110 joist 2 2 FJ102 20' 0" 11 7/8" TJI 110 joist 1 1 FJ103 8' 0" 11 7/8" TJI 110 joist 1 1 FJ104 6' 0" 11 7/8" TJI 110 joist 1 6 FJ105 4' 0" 11 7/8" TJI 110 joist 1 2 FJ106 28' 0" 11 7/8" TJI 360 joist 1 1 FJ107 26' 0" 11 7/8" TJI 360 joist 1 1 FJ109 24' 0" 11 7/8" TJI 360 joist 2 2 FJ108 24' 0" 11 7/8" TJI 360 joist 1 1 FJ110 20' 0" 11 7/8" TJI 360 joist 1 16 FJ111 18' 0" 11 7/8" TJI 360 joist 1 3 FJ112 24' 0" 11 7/8" TJI 560 joist 1 6 BM101 24' 0" 1 3/4" x 20" 2.0E Microllam LVL 2 2 BM102 20' 0" 1 3/4" x 16" 2.0E Microllam LVL 3 3 BM103 6' 0" 1 3/4" x 9 1/4" 2.0E Microllam LVL 2 2 BM104 4' 0" 1 3/4" x 9 1/4" 2.0E Microllam LVL 2 6 BM106 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 BM105 14' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 1 1 BM107 10' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 BM108 6' 0" 1 3/4" x 11 7/8" 1.55E TimberStrand LSL 2 2 Ca101 16' 0" 1 1/8" x 11 7/8" TJ Rim Board 1 9 Blocking PlotID Length Product Plies Net Qty Bk101 2' 0" 11 7/8" TJI 110 joist 1 33   LEVEL NOTES   Current Date:   1/31/2022   File Name:   tg131_2200135.jvl   Level Name:   Second Floor System   Building Code - Design Methodology:   IBC 2006   Members with Design Overridden:   TJ-Pro Rating (Weighted Average):   36         Minimum Level TJ - Pro Rating & Joist:   TJ-Pro rating = 31, joist = FJ112(i4166)         Maximum Level TJ - Pro Rating & Joist:   TJ-Pro rating = 41, joist = FJ110(i4164)   FLOOR   Floor Container:  FC1   Use/Occupancy:  ResidentialLivingAreas   Floor Area Loading is:  40.0 lb/ft² Live Load & 10.0 lb/ft² Dead Load   Operator Added Additional Loads   Maximum Allowed Deflection:  L/480 Live Load & L/240 Total Load   TJ-Pro Rating Information:           Weighted Average:  36           Directly Applied Ceiling:  Gypsum 1/2"           Decking Attachment:  Glue and Nail           Decking Material:  23/32"x48"x96" Weyerhaeuser Edge Panel (0/24) T&G FF           Perpendicular Partition:  No           Strapping at max 8' o.c.:  None           Blocking at max 8' o.c.:  No           Poured Flooring:  No H2BBO3BBO6 BBO12BBO8 BBO13BM103 BM108 BM102 BM105 BM106 BM101VO1 VO2 VO3 VO4FJ104FJ110 FJ110FJ104FJ110FJ110FJ104FJ110FJ110FJ104FJ110FJ110FJ104FJ108FJ110FJ104FJ107FJ111FJ106FJ111FJ101FJ112FJ112FJ112FJ112FJ110Ca101Ca101Ca101Ca101Ca101 Ca101 Ca101 Ca101Ca101 Ca101 Bk101 Bk101 Bk101 FJ103FJ105 4 3/8"FJ1026 1/8" Ca101 FJ110FJ105H207 1' 0"2' 0" 1' 0" 1' 1 3/8"FJ110FJ109Bk101 1' 0"FJ110FJ110FJ110FJ110Bk101 FJ112FJ1121' 4 13/16" 7' 8 1/2" 6 1/2" 7 9/16" 4 1/2" 1' 7 3/16"17' 5"5' 8"Ca101H204H204H205H204H204H204H20310' 0"FJ1115 7/8" 2' 0" 1' 0" H202H202H202H202H202H202H202H202H202H202H202H202BM107 H204H204H204H206H204H20610 7/8" 1' 11 1/8" BM104BM104BM1044 5/8" Flush beam depth greater than floor joist depth. Verify all loading and framing conditions prior to construction. An additional 8 PSF area dead load has been added to account for tile load in the MBA on this floor. There are different joist series of the same depth specified on this floor system.  Verify when installing that the proper TJI® joists are used in the appropriate area. 20" beam.6" bearing, req. Joist moved to avoid heading off HVAC. Joist close to plumbing drops, verify no interference with plumbing drops. 05/05/22