HomeMy WebLinkAboutDelta Faucet System 3 Project 29602 Interconnect App SIGNED.pdfJob No. 141053
03/16
Required program use - Do not delete this space Page 1 of 3
Duke Energy proprietary business information
Phone number
Provide names and contact information for other contractors, installers or engineering firms involved in the design and installation of the
generating facilities:
GENERATING FACILITY INFORMATION
Total generating capacity of customer‐generator facility:
Type of generator: Inverter‐based Synchronous Induction
Energy source: Solar Wind Diesel‐fueled reciprocating engine Gas‐fueled reciprocating engine
Gas turbine Microturbine Other – specify:
Is the equipment certified as defined by IURC 170 IAC 4‐4.3‐5? Yes No
Indicate all possible operating modes for this generator facility:
Emergency/standby – Operated when Duke Energy service is not available. Paralleling is for short durations.
Peak shaving – Operated during peak demand periods. Paralleling is for extended times.
Base load power – Operated continuously at a pre‐determined output. Paralleling is continuous.
Cogeneration – Operated primarily to produce thermal energy. Paralleling is extended or continuous.
Renewable non‐dispatched – Operated in response to an available renewable resource such as solar or wind. Paralleling is for
extended times.
Other – describe:
Will the generation facility export power? Yes No If so, how much?
Level of interconnection review requested: Level 2* Level 3*
Fees (describe here the application fee due):
Adequate documentation and information must be submitted with this application to be considered complete. Typically this should include the
following:
1. Single‐line diagram of the customer’s system showing all electrical equipment from the generator to the point of interconnection
with Duke Energy’s distribution system, including generators, transformers, switchgear, switches, breakers, fuses, voltage
transformers and current transformers.
*Level 2 or Level 3 as defined in IURC 170 4‐4.3‐4(a)
Application for Interconnection – Indiana
Level 2* or Level 3*
Please see Appendix 1 on page 3 of this application for a description of application fees and additional required application information.
APPLICANT INFORMATION
Customer Name Account number
Customer Address Phone number Email address (optional)
City State ZIP code
Project contact person (if different than above) Email address (optional)
Delta Faucet 462100 Masco Mail Stop #8 6740-3050-01-3
PO Box 182590 (317) 848-1812
Columbus IN 43218
Daryl McClellan or Robert Drake (844) 658-8604 (844) 658-8604
Daryl McClellan or Robert Drake, Amerlight Energy, LLC, 2800 Lynch Rd. (Ste B), Evansville, IN, 47711
70kW
✔
✔
✔
✔ Potentially 70kW during down periods
Job No. 141053
03/16
Required program use - Do not delete this space Page 2 of 3
Duke Energy proprietary business information
2. Control drawings for relays and breakers.
3. Site plans showing the physical location of major equipment.
4. Relevant ratings of equipment. Transformer information should include capacity ratings, voltage ratings, winding arrangements and
impedance.
5. If protective relays are used, settings applicable to the interconnection protection. If programmable relays are used, a description of
how the relay is programmed to operate as applicable to interconnection protection.
6. For Certified** equipment, documentation confirming that a nationally recognized testing and certification laboratory has listed
the equipment.
7. A description of how the generator system will be operated, including all modes of operation.
8. For inverters, the manufacturer name, model number, AC power rating and operating manual or link to manufacturer’s website
containing such manual.
9. For synchronous generators, manufacturer and model number, nameplate ratings and impedance data (Xd, X'd and X"d).
10. For induction generators, manufacturer and model number, nameplate ratings and locked rotor current.
**Certified as defined in IURC 170 IAC 4‐4.3‐5
Zoho Sign Document ID: LRYV8KHIYNFYEBPWQCUXWHD-GNLMAR4USJU2ZZZ8AH8
Job No. 141053
03/16
Required program use - Do not delete this space Page 3 of 3
Duke Energy proprietary business information
Appendix 1
Required for informal interconnection process
APPLICATION FEE
Level 2 Non‐Refundable Application Fee: $50 plus $1.00 per kWAC
Level 3 Non‐Refundable Application Fee: $100 plus $2.00 per kWAC
Please make checks payable to Duke Energy Indiana and submit with application to:
Duke Energy Indiana
Attention: Customer Owned Generation – Mail Code DT02W
9700 David Taylor Drive
Charlotte, NC 28262
Email: CustomerOwnedGeneration@duke‐energy.com
Overnight Mailing Address:
Duke Energy Indiana
Attention: Customer Owned Generation – Mail Code DT02W
9700 David Taylor Drive
Charlotte, NC 28262
ADDITIONAL APPLICANT INFORMATION
Application is for: New Generating Facility
Capacity Change to a Proposed or Existing Generating Facility
Change of Ownership of a Proposed or Existing Generating Facility to a new legal entity
Change of Control of a Proposed or Existing Generating Facility of the existing legal entity
If capacity addition to existing Generating Facility, please describe:
ADDITIONAL GENERATING FACILITY INFORMATION
Generating Facility Address:
Generating Facility is: ☐Customer‐Owned or ☐Customer‐Leased
APPLICANT SIGNATURE
I hereby certify that, to the best of my knowledge, all information provided in this Application for Interconnection is true and correct.
For Interconnection Customer:
Signature Date:
Print Name
Street address
City State ZIP code
(Authorized Agent of the Legal Entity)
County
X
55 111th St E
Indianapolis IN 46280
Marion
✔
Zoho Sign Document ID: LRYV8KHIYNFYEBPWQCUXWHD-GNLMAR4USJU2ZZZ8AH8
✔
App fee $50 + 70kW x ($1/kW) = $120 total for Level 2 fee
Zoho Sign Document ID: LRYV8KHIYNFYEBPWQCUXWHD-GNLMAR4USJU2ZZZ8AH8