SANITARY SEWER CONNECTION APPLICATION
CLAY TOWNSHIP REGIONAL WASTE DISTRICT
HAMILTON COUNTY, INDIANA
ii
A. Data to be submitted by the Owner/Engineer to:
P
Clay Township Regional Waste District
P .O. Box 40638
1C Indianapolis , IN 46240-0638
W
ir Location: 10755 North College
lia Phone: 844-9200
',L1
"lG PART I - GENERAL
1 . Project Title: Firestone Building Products
Location: 525 Congressional Boulevard
2 . Project Owner: Technology Center Associates. Ltd. Attn: Kevin Miller
Address: 11550 N. Meridian Street
Carmel, IN 46032
3 . Engineer: Triad Associates, Inc.
Address : 520 Virginia Avenue
Indianapolis, IN 46203
Phone: 635-1240
4 . A site map showing location, KreCeamx and mg.pcigo is attached?
X yes no
5 . Design Flow
Number of Units
1 Bdrm. apts @ 192 gpd/unit = gpd
2 Bdrm. apts @ 256 gpd/unit = gpd
Single family homes @ 256 gpd/unit = gpd
gpd
Commerical Lots @ = gpd
4;96� Acres .
31.250 -_(�ffr = 1,875 gPd
e Building _ @ 0.06 gpd/sf = gpd
@ = gpd
• TOTAL Average Flow 1,875 gpd
Peaking factor 2.0 Peak flow 3,750 gpd
0/1/14
6. (a) Is the property zoned for the intended use?
X Yes No
(b) If yes , what is the zoning class?
B-6
7. Project Description: 31,250 s.f. qtafrle tenant nffirq hniming
8 . _ Construction Schedule:
Start Construction September 1988
Complete Construction February 1989
9 . The Clay Township Regional Waste District Appli-
cation Fee made payable to the District is hereby
submitted is the amount of $ 95.00 as required
b_y ordinance.
Technology Center Associates, Ltd. ,
by t.vim_pgepastments, Inc. as agent 7-22-88
()wrier Date
Kevin A. Miller, Director of Development
There is sufficient sewer capacity and Wastewater Treat-
ment Plant Capacity for the proposed development and a Condi-
tional Permit to connect to the Clay Township Regional Waste
District (Primary) (Merdian Corridor) Project is hereby issue
with the following conditions as marked :
A. • .,/ Conditions and Limitations Recommended by the
---- District for issuance of a Final Construction
Permit from the Indiana Department of
Environmental Management. (See Supplemental
Information Sheet) .
B. ✓ Applicant' s Development Project be approved by
the Carmel Plan Commission and/or such other
Board' s , Agencies or Governmental Units having
Regulatory jurisdiction over said Project.
C_ . _ V That connection of the Development Project to
the sewerage system will require a Sewer Service
Agreement between the Project Owner and the
District relating to the Construction and
installation of Public Sewers.
D. That the Project owner pay all availability
charges and other fees imposed by the District
in connection with the Prciject which may include
costs incurred by the District for Engineering ,
Accounting and/or Legal services .
E. That the Applicant pursue the approvals and per-
mits necessary to allow the project owner to
proceed with construction of the project.
F. Other Conditions (See Attached)
. Construction on any phase of the Project shall not
commence until all conditions of the Conditional Permit
are met and the District has issued a Final Permit.
V
Issued thisg day of //1 4 , 19$P
CLAY TOWNSHIP REGIO ASTE DISTRICT
, /
Marvin i e �/
Utility Manager