HomeMy WebLinkAbout06020140 Sq. Ft.
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump n Show sump pump pitts) and discharge line locations
p. Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required.
-".-..., .' -. ~
)>
,
FURTHER NOTES / NOTICES:
)> CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its iocation conform in all respects to this ordinance."
)> IN ADDmON TO THE A80VE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
)> ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMffiED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMffiAL OF ADDmONALL Y REQUESTED/REQUIRED INFORMATION, AFTER THE INmAL SUBMffiAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
)> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIABLE. UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE
ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BViLDING & CODE ENFORCEMENT: CITY OF CARMEL. One Civic 5'1': Carmel. IN 46032. ph, (317) 571c2444.
~-~-- -~~. ~- ---
I, the undersigned, certify that all of the above listed information is shown completely and accurately on the
attached plot or site plan(s), construction plans, and any other submitted documentation, submitted with the
building permit application to the City of Carmel/Clay Township Department of Community Services. I further
certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-S09-S) Under the penalties of PeJjury (Indiana
Code 35-44-2-1), I also hereby affirm, under oath, that all of the information I have provided in the table below is
true and accurate, to the best of my knowledge and belief, and that I have not knowingly or intentionally
provided or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of
Community Services regarding the truth of the matters addressed therein.
BASEMENT
(Finished and
Unfinished)
1 st Floor
2nd Floor
3rd
Floor
Front
Porch
Rear
Porch or
Sun room
Total Sq.
Ft. of
Garages
11r:
~ ~E'6
TOTAL
xC~()
?6
Ii
4 NT'S SIGNATURE
j/ . JllrzcS If-cl-l-Io
NAME PRINTED
~({-ct6
~J-( I
8f
/(/()o .
~.
S:PermitsjFORMS/RESIDENTIAL PROCEDURES
20f2 I
,
~