Loading...
HomeMy WebLinkAboutSubdivider Agreement Form JAN-09-1997 14:54 FROM CARMEL CLAY UU L1 i u 9-139J 13U1U r.e_s SUBDIVIDER AGREEMENT FORM 9.6 THE SUBDIVIDER The following agreement shall be included as a submittal with the final plot application. AGREEMENT The developer shall be responsible for any drainage problems including standing water, flooding and erosion control, which arise or become evident at any tune during the 3 year maintenance period after release of subdivision bonds, and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This shall include all pipes, structures,swales,ditches,and ponds which are pertinent features to the proper drainage of the subdivision_ This responsibility of the developer shall not, however, include problems which are created, subsequent to the completion of the subdivision improvements by the improper grading by individual builders, or structures and improper grading installed or accomplished by individual homeowners. It is the intent of these requirements, that the developer shall,specifically,provide such sub-surface drains, or storm sewers or ditches as are required to properly rectify any drainage problem or sub-surface water problem which was not contemplated in the original approved subdivision design, including, but not restricted to, disposal of sub-surface water from footing drains of individual lots. ROAD IMPROVEMENTS: The typical agreement for existing contiguous Hamilton County Roads which are substandard, with Hamilton County is: The developer will put in 12 inch stone base to the required width of the road, and grade the shoulders to a minimum of 6 feet width and construct proper side-ditches, or provide storm sewers and curbs. This will be the black top grade during construction of the subdivision. Then the county will conic in and cut out 3 inches and put in 3 inch binder asphalt, after which the developer will be responsible for 1 inch of asphalt topping. This is being done as joint projects between county and developer. An agreement shall be executed, in writing, between the developer and Hamilton County, specifically detailing the exact work to be accomplished by the developer, and that to be accomplished by the County, and shall also state the road or roads or portions thereof which are included. If the subdivision is contemplated to be annexed to the City of Cannel, then the agreement shall include the City of Carmel Board of Public Works as a signatory, which shall be for the purpose of the City of Cannel agreeing to accept for maintenance and operation, the improved road facility upon completion of said improvements and completion of annexation. DEV b ER.J WITNESS JaN loco \ `oleo DATE Revised 6/94 $ycc.s,orC. Q/M SUBDIVIDER AGREEMENT FORM 9.6 THE SUBDIVIDER PI? 7'/1 poet, *8 The following agreement shall be included as a submittal with the final plot application. AGREEMENT The developer shall be responsible for any drainage problems including standing water, flooding and erosion control, which arise or become evident at any time during the 3 year maintenance period after release of subdivision bonds, and which is attributable to a deficiency in subdivision drainage design or construction of drainage improvements. This shall include all pipes, structures,swales,ditches,and ponds which are pertinent features to the proper drainage of the subdivision. This responsibility of the developer shall not, however, include problems which are created, subsequent to the completion of the subdivision improvements by the improper grading by individual builders, or structures and improper grading installed or accomplished by individual homeowners. It is the intent of these requirements,that the developer shall,specifically,provide such sub-surface drains, or storm sewers or ditches as are required to properly rectify any drainage problem or sub-surface water problem which was not contemplated in the original approved subdivision design, including, but not restricted to, disposal of sub-surface water from footing drains of individual lots. ROAD IMPROVEMENTS: The typical agreement for existing contiguous Hamilton County Roads which are substandard, with Hamilton County is: The developer will put in 12 inch stone base to the required width of the road, and grade the shoulders to a minimum of 6 feet width and construct proper side-ditches, or provide storm sewers and curbs. This will be the black top grade during construction of the subdivision. Then the county will come in and cut out 3 inches and put in 3 inch binder asphalt, after which the developer will be responsible for 1 inch of asphalt topping. This is being done as joint projects between county and developer. An agreement shall be executed, in writing,between the developer and Hamilton County, specifically detailing the exact work to be accomplished by the developer, and that to be accomplished by the County, and shall also state the road or roads or portions thereof which are included. If the subdivision is contemplated to be annexed to the City of Carmel, then the agreement shall include the City of Carmel Board of Public Works as a signatory, which shall be for the purpose of the City of Cannel agreeing to accept for maintenance and operation, the improved road facility upon completion of said improvements and completion of annexation. DEVELOPER 71/70t,-,E. i .l yre r/P Co�,.. a . es Z.P WITNESS /v/9-0/76 DATE Revised 6/94