Loading...
HomeMy WebLinkAboutCorrespondence `\,j City o rmel y i December 17, 1996 Mr. Mark Boyce C.P. Morgan Co. 301 East Carmel Drive Carmel, IN 46032 Re: Replat Application for Sycamore Farms Dear Mark: The Replat application filed for Sycamore Farms has been reviewed by our office. The following comments need to be addressed and plans updated accordingly: Application: •A variance application will need to be submitted for the proposed passing blister configuration. An application is attached for your use. •The subdivider agreement form needs to be signed and submitted. Plat: •No plat was filed. Construction Drawings: 'No comments on the construction drawings at this time. If not already done, please distribute the plans to the members of the Technical Advisory Committee immediately in preparation for the December 18th meeting. Our office will need to receive a copy of any correspondence from the committee members. If you have any comments or questions concerning this matter please do not hesitate to call us at 571-2417. Sincerely, Mark T. Monroe, AICP Planner Department of Community Services ONE CIVIC SQUARE CARMEL,INDIANA 46032 317/571-2400 r r Oln IP •ii♦ (City of Ca Fr��'FiN�;�- ►� September 23,1996 C.P. Morgan Mark Boyce 301 East Carmel Drive Suite E300 Carmel, Indiana 46032 RE: Sycamore Farms Passing Blister Dear Mark: In regards to our conversations about the variance you are considering requesting from the City of Carmel Plan Commission and Board of Public Works and Safety for a shortened passing blister at the Sycamore Farms entrance, this office would support such a variance request if it were to include certain appropriate design features as described below. As previously explained to you, the City of Carmel's preferred interest would be in PSI relocating this pole. However, as it has been discovered, the expense associated with relocation at this time is considered excessive, and site modifications are going to be necessary if the pole is to remain. The blister, as shortened, will be causing a situation in which drivers will need to be aware of the limits of horizontal clearance and the requirements of maneuvering a quicker return to the southbound lane, passing at a slower speed, and the potential hazard of obstacles immediately outside of this passing lane. This site warrants special traffic warning signs to guide the traffic back into the thru lane. Possible signage and traffic control devices may include Chevron Alignment signs, Lane Ends sign, Watch for Left Turns sign, Striped Object Markers and a Guardrail. This office and the City of Carmel's Street Department are willing to work with you on finalizing which signs/features we would ask to be installed. Beside the addition of these items to the entrance plan, you will still be required to request a variance of the CarmeUClay Subdivision Control Ordinances for this modification to the regulated passing blister and taper lengths. If such a variance request is not made, or approvals are not received, you will be required to put in the passing blister as required by ordinance. ONE CIVIC SQUARE CARMEL,INDIANA 46032 31 1571.24.\' Finally, at the time in which the neighboring property across Gray Road is being considered for development, the City would require that any entrance to such a development along Gray Road be aligned with this Sycamore Farms entrance, and the expense of the pole relocation in question be included as part of this (future) proposed plan. At that time, regulated taper lengths will be installed, and any guard rail and/or signage may be removed. If you have any questions about this issue, please do not hesitate to call. Sincerely, 777 Ka jet , M. Kate Boyle, P.E. City Engineer MKB/mkb Copy: Steve Engleking, Terry Jones, Mark Monroe - Carmel DOCS David Klingensmith, Carmel Street Department