Loading...
HomeMy WebLinkAboutChange_Order__2_-_A&S_General_Construction;_($1,540.00);_Carmel_Data_Center_Project;_CO__2 DocuSign Envelope ID:C28BEB39-AA3A-4A74-B5F6-707876087C77 r 1 By Sorgoy a roc/hero;at 10:25 am,Apr 26,2022 CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 2 A&S General Construction DATE: 4/1/2022 430 North Raceway Road PROJECT NAME: Carmel Data Center Indianapolis, IN 46234 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: (Brief Description) Rework metal framing for TV boxes changed in AS1-004 SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR (-) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 35,223.09 Contract Price will be increased/decreased by this Change Order $ 1,540.00 New Contract Price including this Change Order $ 36,763.09 Contract Time Prior to this Change Order Days NC Completion Date Net increased/decreased resulting from this Change Order NC Days Current Contract Time including this Change Order Days NC Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. AR-l Version 2016-08-31 DocuSign Envelope ID:C28BEB39-AA3A-4A74-B5F6-707876087C77 The Above Changes Are The Above Changes Are Approved: Recommended Requested/Accepted: ,-DocuSigned by: Studio M Architecture ASS General Construction ra �—ar�onruz OnGsl... ARCHITECT CONTRACTOR James trainard, Mayor 000usgnea by: 2 West Main Street 430 NorthRaceway Road kkt Address Address rWry.A/stld nurke, Member by: (,ori 030}(ov BWat e ber Cannel, IN 46032 Indianapolis, IN 46234 City/State/Zip City/State/Zip Audie Tarpley, D Construction Project Manager CudeA- es Crider, Director of By: fitut By: , Administration A.l TEST(-DocuSigned by: Phone: 317.810.1502 Phone: 3� - T 50 cd-2 w? S"` (kW O°"� Sue Wolf an Date: 04/12/2022 Date: Lief 01/.2 - Date: 5/6/2022 AR-2 Version 2016-08-3I DocuSign Envelope ID:C28BEB39-AA3A-4A74-B5F6-707876087C77 DATE 03/24/22 A&S GENERAL CONSTRUCTION DILLON CONSTRUCTION GROUP CARMEL DATA CENTER CHANGE ORDER WAIT MOUNT TV REPLECE THIS WOULD BE THE PRICE FOR REPLACING THE WALL MOUNT TV THE REPLACEMENT REQUIERES REMOVING THE METAL FRAME AND REBUILDING THE WALL AND INSTALLING THE NEW 4 BOXES OR WALL MOUNT TV THIS PRICE INCLUDES MATERIAL AND LABOR $ 1,540