REF #REVIEWED BYTYPEVIEWENTER YOUR COMMENT RESPONSE HEREDISCUSSIONCYCLESTATUS
CrossRoad EngineersMarkup
7 open Replotted to include Vicinity Map 1UnResolved
Willie HallC2 EXISTING TOPOGRAPHY.pdf
6/9/22 1:59 PMMap Missing
CrossRoad EngineersMarkup
8 open Note added to C2 Existing Topography to see Sheets C5-C7. Following note added to plans 1UnResolved
Willie HallC2 EXISTING TOPOGRAPHY.pdf
"PER FEMA FLOOD INSURANCE MAP 18057C0205G, EFFECTIVE 11/19/2014 THE SITE IS
6/9/22 2:01 PM102.02.v.d.
LOCATED IN ZONE X. 100 YEAR FLOODPAINS, FLOODWAY FRINGES, AND FLOODWAYS DO
Existing Project Site Layout shall include one hundred (100) year floodplains, floodway fringes, and
NOT EXISTING ON SITE. ALSO VERIFIED ON HAMILTON COUNTY GIS."
floodways, established or identified in accordance with the City of Carmel Flood Hazard Area Ordinance.
Please note if none exists.
CrossRoad EngineersMarkup
9 open Sheets C17-C20 have been revised to show extents of granular backfill. Additional notes 1UnResolved
Willie HallC17 UTILITY PROFILES.pdf
have been added to plans with respect to granular backfill material and reference to City of
6/9/22 2:50 PM102.02.vii
Carmel standard details.
The Plan and Profile Sheet(s) shall include the limits of granular backfill may be indicated on the plan and
profile sheets; however, any references with general notes, plan notes, or legends to the granular backfill
material shall reference the appropriate trench detail on the detail sheets.
CrossRoad EngineersMarkup
10 open Notes layer unthawed on grading plan. This is note #17 regarding system to be private.1UnResolved
Willie HallC12 GRADING PLAN SOUTH.pdf
6/9/22 2:58 PM102.02.xi.h
the grading and drainage plan shall indicate as to the system being public or private.
CrossRoad EngineersMarkup
11 open Table revised to include 6in release rates.1UnResolved
Willie HallC16 UTILITY PLAN CENTER.pdf
6/9/22 3:06 PM102.02.xi.m
Please include 6 IN orifice release rates as well.
CrossRoad EngineersMarkup
12 open Swales along west and east side have been labeled and maintain min 1% slope along length 1UnResolved
Willie HallC12 GRADING PLAN SOUTH.pdf
of swale.
6/9/22 3:07 PM102.02.xi.r & 303.05.7
the grading and drainage plan shall include the labeling the slopes of all surface drainage swales. minimum
Per Hamilton County Detail - underdrain only needed if less than 1% slope. Underdrain has
swale slopes are 1.0%, unless designed to act as a stormwater quality BMP. All flow shall be confined to the
been provided at swales on the east side south of the drive.
specific easements associated with each rear and side lot swale that are part of the minor drainage system.
Unless designed to act as a stormwater quality BMP, swales shall have tile underdrains to dry the swales.
We cannot run an underdrain under the west side swales due to the elevation of the swale
(See Hamilton County Surveyorâ s Office Standard Details D-16.) Tile lines may be outle?ed through a drop
structure at the ends of the swale or through a standard ?le outlet.
and the depth of the receiving storm sewer network.
CrossRoad EngineersMarkup
13 open Noted and revised 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
6/9/22 5:49 PMContradicting informations
Please make sure orifice sizes and other information coincide with each other.
CrossRoad EngineersMarkup
14 open Summary table is provided in Appendix C of the TIR. Calculated TOC are located within the 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
hydrocad reports within the TIR.
6/10/22 9:07 AM102.03.i.a
Please include the following:
rainfall intensity table
TOC calcs for pre- and post-developed scenarios (excluding 5 minute TOCs)
CN and weighted C calculations
CrossRoad EngineersMarkup
15 open Calculations provided in TIR. All pipe velocities fall within the 2.5 -10 ft/s range when 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
flowing full capacity.
6/10/22 9:11 AM305.04
minimum and maximum allowable slopes shall be those capable of producing velocities no less than 2.5 and
no greater than 10 feet per second, respectively, when the sewer is flowing at full capacity, not average
velocities or velocities resulting from conveying the flow from the design storm. Please include
CrossRoad EngineersMarkup
17 open Revised as noted 1UnResolved
Willie HallC8 SITE PLAN SOUTH.pdf
6/10/22 9:28 AM302.06.10
a minimum of fifteen (15) feet horizontally from the top of bank of the facility, or the 100-year pool if no
defined top of bank is present, shall be dedicated as permanent stormwater easement if the above-noted
boundary of the common area does not extend that far. Please revise to fit new pond dimensions
CrossRoad EngineersMarkup
19 open Pond design updated for 0.5 acre for normal pool and depth of 10 feet for at least 25 1UnResolved
Willie HallC8 SITE PLAN SOUTH.pdf
percent of pond area. Safety ledge is provided per HCSO Standard Detail. Detail added to
6/10/22 9:34 AM302.07.1
Utility Details
detention facilities designed with permanent pools or containing permanent lakes shall have awater area of
at least one-half (0.5) acre with a minimum depth of eight (8) feet. If fish are to be used to keep the pond
clean, a minimum depth of approximately ten (10) feet shall be maintained over at least 25 percent of the
pond area. The remaining pond area shall have no extensive shallow areas, except as required to install the
safety ramp, safety ledge, and stormwater BMPs as required below. Construction trash or debris shall not
be placed within the permanent pool. The pond design shall be according to the Hamilton County
SurveyorÃÃÃâÃà       s Office Standard Details D-6 through D-8. It does not appear that the normal
pool area is a minimum of 0.5 acres. Please confirm and revise if necesssary
CrossRoad EngineersMarkup
20 open Safety ramp/exit from the wet pond/lake has been provided at the northwest corner of the 1UnResolved
Willie HallC8 SITE PLAN SOUTH.pdf
basin with access from the parking lot
6/10/22 9:35 AM302.07.2
a safety ramp exit from the lake may be required in some cases and shall have aminimum width of twenty
(20) feet and exit slope of 6 horizontal to 1 vertical (6:1). The safety ramp shall be constructed of suitable
material to prevent structural instability due to vehicles or wave action.
Page 1 of 4
REF #REVIEWED BYTYPEVIEWENTER YOUR COMMENT RESPONSE HEREDISCUSSIONCYCLESTATUS
CrossRoad EngineersMarkup
21 open The existing road elevations and current right-of-way drainage drain to a low point on 141st 1UnResolved
Willie HallC22 EMERGENCY FLOOD ROUTING SOUTH.pdf
Street that drains onto and through the southwest portion of the site to the neighborhood
6/10/22 9:41 AM302.11
to the west. The site cannot flood route to the right-of-way for an emergency flood route.
emergency overflow facilities such as a weir or spillway shall be provided for the release of exceptional
Per conversations with the City from PZ-2021-00014 a variance was requested to flood
storm runoff or in emergency conditions should the normal discharge devices become totally or partially
route through the outlet control structure. This project requests the same variance
inoperative. The overflow facility shall be of such design that its operation is automatic and does not require
(included with resubmittal) due to the same site constraints. Additional calculations are
manual attention. The outlet control structure is not an acceptable outlet point for the emergency flood
provided to show the 1.25 x 100-year event routed through the outlet control structure.
routing. Please see PZ-2021-00014 TAC Islamic Life Center for comments and discussion related to this topic
CrossRoad EngineersMarkup
22 open Additional calculations provided for swales. See Appendix C of TIR under subheading of 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
swale calculations.
6/10/22 9:43 AM303.02
All channels and swales shall accommodate, as a minimum, peak runoff from a 10-year return frequency
storm calculated based on methodology described in Section 201.02. For Rational Method analysis, the
storm duration shall be equal to the time of concentration for the drainage area. In computer-based
analysis, the duration is as noted in the applicable methodology associated with the computer program.
Please provide analysis of on site swales.
CrossRoad EngineersMarkup
23 open Revised as noted.1UnResolved
Willie HallC12 GRADING PLAN SOUTH.pdf
6/10/22 9:51 AM102.02.xi.p
the grading and drainage plan shall include the definition of minimum flood protection grade in accordance
with this manual.
CrossRoad EngineersMarkup
24 open Additional calculations provided and incluced in Appendix C of the TIR 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
6/10/22 10:00 AM102.03.i.d.iii
The stormwater drainage technical report needs to include in the pipe sizing calculations the confirmation of
the sizing of existing roadside culverts to which site runoff (including water draining to culvert from offsite)
is being discharged.
CrossRoad EngineersMarkup
25 open Power will be extended to the pond to allow for future aeration if needed. The proposed 1UnResolved
Willie HallC8 SITE PLAN SOUTH.pdf
wet pond has a depth of 10'. If stagnation becomes an issue, aeration will be incorporated
6/10/22 10:02 AM302.07.4
into the pond.
methods to prevent pond stagnation, including but not limited to aeration facilities, should be considered on
all wet-bottom ponds. Design calculations to substantiate the effectiveness of proposed aeration facilities,
and any impacts on the effectiveness of the pondÃÃÃâÃà       s use as a stormwater BMP shall be
submitted with final engineering plans. Agreements for the perpetual operation and maintenance of
aeration facilities shall be included in the restrictive covenants of the development or as provided by policy
or codes.
CrossRoad EngineersMarkup
27 open Easements have been revised to include minimum 30 foot easement on swale and overflow 1UnResolved
Willie HallC8 SITE PLAN SOUTH.pdf
path.
6/10/22 10:02 AM306.02.C
rear-yard swales and emergency overflow paths associated with detention ponds shall be contained within a
minimum of 30 feet width (15 feet from centerline on each side) of drainage easement.
CrossRoad EngineersMarkup
29 open Revised as noted.1UnResolved
Willie HallC21 UTILITY PROFILES.pdf
6/10/22 10:23 AMTable
Please label table correctly.
CrossRoad EngineersMarkup
30 open Per 303.07 Lowest Adjacent Grade is the elevation of the lowest grade adjacent to a 1UnResolved
Willie HallC23 EMERGENCY FLOOD ROUTING CENTER.pdf
structure, where the soil meets the foundation around the outside of the structure; shall be
6/10/22 10:28 AM303.07
set a minimum of 2 feet above the highest noted overflow path/ponding elevation across
the Lowest Adjacent Grade for all residential, commercial, or industrial buildings shall be set a minimum of
the property frontage. Minimum Flood Protection Grade of all structures fronting a pond or
2 feet above the highest noted overflow path/ponding elevation across the property frontage. Please revise
open ditch shall be no less than 2 feet above any adjacent 100-year local or regional flood
MLAG and MFPG.
elevations.
MLAG = 2' above property frontage=912.68+2'=914.68
2' above overflow weir = 908.8+2=911.8
CrossRoad EngineersMarkup
31 open Additional volume is provided in the pond to provide 90% capacity at 48 hours under the 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
design pond (orifices less than 6") With 6" orifices, 96% of capacity of pond is restored
6/10/22 10:33 AM302.06.1
within 48 hours. See calcs in TIR Appendix C
detention facilities shall be designed in such a manner that a minimum 90% of the original detention
capacity is restored within 48 hours from the start of the design 100-year storm, not 72 hours.
CrossRoad EngineersMarkup
32 open The area adjacent to the pond is regraded as a generally flat grass area and filter strip that 1UnResolved
Willie Hall20200113.TechInfoReport_IslamicLifeCenter_5.18.22.pdf
drains to the wet pond. The thoroughfare runoff is bypassed through the site and through
6/10/22 10:38 AM701.01
the pond.
The City of Carmel requires that all water leaving a site shall be treated by a stormwater quality
management system consisting of a minimum of two different BMPs. It does not appear that all of the
onsite and thoroughfare runoff is being routed through this single Aquaswirl Str 11.2. Please route
everything through the singular BMP or add additional structures to treat all runoff prior to entering
detention pond
CrossRoad EngineersMarkup
33 open Revised as noted.1UnResolved
Willie HallC1 TITLE SHEET.pdf
6/10/22 10:48 AMTable
Please include:
Zoning
Setbacks
Anticipated start date
Page 2 of 4
REF #REVIEWED BYTYPEVIEWENTER YOUR COMMENT RESPONSE HEREDISCUSSIONCYCLESTATUS
CrossRoad EngineersMarkup
34 open Revised as noted.1UnResolved
Willie HallC31 STORM WATER POLLUTION PROTECTION PLAN.pdf
6/10/22 11:00 AMSWPPP
10-YR Pre Q does not match drainage report
CrossRoad EngineersMarkup
35 open Revised to reflect wet pond design.1UnResolved
Willie HallC31 STORM WATER POLLUTION PROTECTION PLAN.pdf
6/10/22 11:00 AMSWPPP
Wet pond?
CrossRoad EngineersMarkup
37 open Please see revised erosion control details C30 1UnResolved
Willie HallC31 STORM WATER POLLUTION PROTECTION PLAN.pdf
6/10/22 11:00 AMSWPPP
Please reflect this in the EC Details.
CrossRoad EngineersMarkup
38 open Noted. Information provided on C31.1UnResolved
Willie HallC31 STORM WATER POLLUTION PROTECTION PLAN.pdf
6/10/22 11:02 AMSWPPP
This information will need to be provided prior to plan approval.
CrossRoad EngineersMarkup
39 open Revised as noted. See Scheet C30.1UnResolved
Willie HallC27 EROSION CONTROL PLAN SOUTH.pdf
6/10/22 11:05 AMSWPPP Details needed
Please provide details for Erosion Roll and Construction Fence in plans.
CrossRoad EngineersMarkup
40 open Revised to include contact information 1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Please include full contact information prior to recording of O&M manual.
CrossRoad EngineersMarkup
41 open Revised as noted.1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Please include inspection intervals and requirements regarding the submittal of annual inspection reports to
the City of Carmel. See SWPPP Post construction plan requirements 5.h.
CrossRoad EngineersMarkup
42 open Revised O&M for additional information for wet pond 1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Please provide wet detention specific checklist. Also include Mechanical unit checklist
CrossRoad EngineersMarkup
43 open Easement documentation will be included upon acceptance of final drainage design 1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Easement documentation will need to be included.
CrossRoad EngineersMarkup
44 open Revised as noted. Discharge location indicated.1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Please indicate ultimate discharge location.
CrossRoad EngineersMarkup
45 open Pond Cross sections and critical elevations provided on page 11 of O&M Manual.1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
Please include pond cross sections with critical elevations labeled.
CrossRoad EngineersMarkup
46 open Additional plumbing sheets regarding basement pumping system have been removed.1UnResolved
Willie HallILC OM Manual 5.18.22.pdf
6/10/22 11:20 AMO&M
O&M Manual should only include information pertinent to stormwater facility maintenance. Sanitary
sewer/plumbing should not be included in this manual.
CrossRoad EngineersMarkup
47 open Spot elevations for the ramp are provided and verified that under 1/12 for no more than 30 1UnResolved
Willie HallC13 GRADING PLAN CENTER.pdf
length feet with landings at top, bottom, and mid ramp
6/10/22 11:22 AMADA
Ramp details are provided on architectural plans
Ramp appears to exceed 8.3% max slope
INDOT detail removed
CrossRoad EngineersMarkup
48 open Spot elevations for the ramp are provided and verified that under 1/12 for no more than 30 1UnResolved
Willie HallC13 GRADING PLAN CENTER.pdf
length feet with landings at top, bottom, and mid ramp
6/10/22 11:23 AMADA
Ramp details are provided on architectural plans
Please provide more information to verify ADA compliance of ramp. Please provide ramp specific details on
INDOT details for parking and sidewalk ramps updated
Site Detail sheets. The only ramp detail included is a Type K ramp, which does not apply to most of the
ramps on site
CrossRoad EngineersMarkup
49 open Grading revised to include additional spots at the ada parking and additional spots at 1UnResolved
Willie HallC13 GRADING PLAN CENTER.pdf
rampsl
6/10/22 11:26 AMADA
ADA parking appears to be compliant. Please include spot elevations at the corner of each parking stall to
verify slopes
CrossRoad EngineersMarkup
50 open Site Details have been updated.1UnResolved
Willie HallC11 SITE DETAILS.pdf
6/10/22 12:51 PMStandards
Please use latest standards that can be found on Carmels websites.
CrossRoad EngineersMarkup
51 open Revised as noted. The trench detail for Utilit;y Installations within City R/W has been 1UnResolved
Willie HallC24 UTILITY DETAILS.pdf
provided.
6/10/22 12:56 PMDetail
Please use Carmel's latest storm trench detail 10-32
CrossRoad EngineersMarkup
52 open Revised as noted. Informaton added to Pond Alignments.1UnResolved
Willie HallC24 UTILITY DETAILS.pdf
6/10/22 12:56 PMElevations
Please include 10- & 100-YR staging elevations
Page 3 of 4
REF #REVIEWED BYTYPEVIEWENTER YOUR COMMENT RESPONSE HEREDISCUSSIONCYCLESTATUS
CrossRoad EngineersMarkup
53 open Detail added to Sheet C24.1UnResolved
Willie HallC24 UTILITY DETAILS.pdf
6/10/22 12:56 PMDetail
Please use Carmel Standard Detail 10-30 for typical swale and underdrain detail.
EngineeringComment
4 Noted. Review comments will be coordinated with Crossroad Engineers and noted below in 1Info Only
Alex JordanCrossroad Engineers will be completing the full review of this under our expedited review process. Please
comments.
6/1/22 3:16 PMwork with them to address all comments and revise the plans accordingly.
FireComment
5 Noted. Fire Department ntoes added to Utility Plan.1Info Only
Carmel FireSection 3312.1 Fire Hydrants shall be fully functional tested and approved prior to any combustible
6/7/22 9:34 AMmaterials arriving on the construction site.
FireComment
6 Noted. Fire Department ntoes added to Utility Plan.1Info Only
Carmel FireSection 3310.1 Required Fire Department Vehicle Access. Approved Asphalt fire apparatus access roads
6/7/22 9:34 AMshall be provided to and through the construction site during construction. Fire Apparatus access road must
be capable of supporting the weight of fire apparatus and maintained clear at all times.
Planning & ZoningMarkup
2 open Sign Permit will be submitted separately via the Online Public Portal.1UnResolved
Angie ConnC9 SITE PLAN CENTER.pdf
6/1/22 11:00 AMsign permit
If you have not already done so, please submit for a Sign Permit Application on the online public portal. You
will be working with Aliza Shalit in the Planning Dept. for review/approval of that.
Planning & ZoningMarkup
3 open The building height will be less than 35 feet.1UnResolved
Angie ConnC9 SITE PLAN CENTER.pdf
6/1/22 11:00 AMbuilding height
What is the new proposed building height. Will it be less than or equal to 35 feet?
TriCo Regional Sewer UtilityComment
1 Responses coordinated with Ryan Hartman at TriCo Regional Sewer Utility. Revisions 1UnResolved
Ryan HartmanSent comments to Jennifer Lasch on 5.25.2022 and will wait for plan revisions.
included in this resubmittal.
5/25/22 2:12 PM
Page 4 of 4
VERIDUS GROUP, INC. | 6280 N. SHADELAND AVENUE, SUITE A | INDIANAPOLIS, IN 46220 | WWW.THEVERIDUSGROUP.COM | 317.598.6647
ENGINEERING MEMORANDUM
TO: ANGIE CONN, AICP, PLANNING ADMINISTRATOR
CITY OF CARMEL PLANNING AND ZONING DEPT.
FROM: VERIDUS GROUP, INC.
SUBJECT: ISLAMIC LIFE CENTER REVISED – TAC REVIEW
DATE: MAY 18, 2022
CC: OWNER
ARCHITECT
LANDSCAPE ARCHITECT
PURPOSE
The Islamic Life Center project has been revised to accommodate a wet pond rather than a dry pond
as part of the stormwater management strategy in order to eliminate the retaining wall along the
west side of the property line. In response to the wet pond, the finished floor has been raised so that
the basement (lower level) finished floor elevation is at least one foot above the wet pond normal
pool.
Associated site elements such as sidewalks, accessible routes, parking stairs and ramps have been
provided as needed to reflect the revised floor plan.
Some minor modifications have occurred to the sanitary and storm sewer networks to accommodate
the revised building elevation.
We do not anticipate any adverse impacts to public rights-of-way or adjacent parcels as a result of
this change.