HomeMy WebLinkAbout21_G3.1_Erosion Control Plan NorthTBM#4 = 810.78PROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98F.F.E.= 831.98FH1FH2FH3SF
SF
SF
SF
SF SFSF SFSF
SFSFCWPTSF111111111111111111222223333333388345666666611111177STORMTRAPUNDERGROUNDDETENTION SYSTEMBMP UNITBMP UNITMATCHLINE - SHEET G3.1MATCHLINE - SHEET G3.22777206002040G3.1EROSION CONTROL PLAN - NORTHCOPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220014.00CARMEL HIGHSCHOOLNATATORIUMADDITION ANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.17.2021CONSTRUCTION DOCUMENTSDRAWN BY: HHW317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTATAC SUBMITTAL11/17/202119700317No.PROJECT MANAGER: PMR1ADDENDUM #101/25/20222ADDENDUM #202/01/2022INLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! EROSION CONTROL LEGENDCWPTSFEROSION CONTROL NOTES1.ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MY BE REQUIRED BY THE INSPECTOR.2.DURING CONSTRUCTION KEEP PAVEMENTS AND SIDEWALKS CLEAN AND WORK AREAS IN AN ORDERLYCONDITION. CLEAN WHEELS OF VEHICLES BEFORE LEAVING THE SITE TO AVOID TRACKING SOIL ONTOROADS, WALKS, OR OTHER PAVED AREAS.3.ALL PROPOSED EROSION AND SEDIMENT CONTROL SHALL BE IN CONFORMANCE WITH CHAPTER 600OF THE CITY OF CARMEL STORMWATER TECHNICAL STANDARDS MANUAL, LATEST EDITION.DISCREPANCIES BETWEEN THE PLANS AND THE MANUAL SHALL NOT ALLEVIATE THE CONTRACTORFROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE MANUAL.1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THESURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIESSHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDINGUNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATERMANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THEDEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN ACONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TORESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTIONOF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TOINSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TODOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.7.REFER TO EROSION CONTROL DETAILS ON SHEET G3.4GENERAL NOTES EROSION CONTROL KEYNOTES1.SEDIMENT BAG INLET PROTECTION2.LIMITS OF CONSTRUCTION3.TEMPORARY SEEDING4.CONCRETE WASHOUT5.PORTABLE TOILETS6.SILT FENCE7.CONSTRUCTION ENTRANCE8.EROSION CONTROL BLANKET5TAC REVIEW COMMENTS04/26/2022