HomeMy WebLinkAbout32_SU1.3_Site Utility Plan Gas ServiceE MAIN STREETHARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 1LOT 48LOT 49LOT 50LOT 51LOT 52LOT 53LOT 54LOT 55LOT 56LOT 57LOT 58LOT 5PARCEL 7PARCEL 8ADJOINERADJOINERPROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98F.F.E.= 831.98F.F.E.= 831.98F.F.E.= 834.65FH1FH4FH3GGNATURAL GAS SERVICE. COORDINATEWITH M.E.P. PLANS FOR LOCATION.PROPOSED NATURAL GAS LINE.COORDINATE LOCATION ANDINSTALLATION WITH CENTERPOINTENERGY.PROPOSED NATURAL GAS LINE.COORDINATE LOCATION ANDINSTALLATION WITH CENTERPOINTENERGY.CONNECT PROPOSED NATURAL GAS LINETO EXISTING GAS MAIN LOCATED WITHMAIN STREET RIGHT-OF-WAY. COORDINATEWITH CENTERPOINT ENERGY.EXISTING GAS MAINPROPOSED BUILDING ADDITION18,240 SFT.FINISH FLOOR ELEV. = 851.55 (EAST)FINISH FLOOR ELEV. = 852.89 (WEST)FIRE LANE NO PARKINGFIRE LANE NO PARKINGFIRE LANE NO PARKIN
GSANSANSANPERFORMING ARTS PROJECTNOT IN CONTRACT, FOR REFERENCE ONLY60180060120SU1.3UTILITY PLANGAS SERVICECOPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220014.00CARMEL HIGHSCHOOLNATATORIUMADDITION ANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.17.2021CONSTRUCTION DOCUMENTSDRAWN BY: HHW317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTATAC SUBMITTAL11/17/202119700317No.PROJECT MANAGER: PMRINLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT ANAPPROVED STORM WATER MANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BETHE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINERELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULTIN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THEDEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALLRESTORED/REPAIRED TO THE SATISFACTION OF THE CITY ATTHE COMPLETION OF THE PROJECT. THE CONTRACTOR ISENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITYPRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THEEXISTING CONDITION OF THE RIGHT-OF-WAY.GENERAL NOTESUTILITY LEGENDNEW STORM SEWER LINENEW FIRE PROTECTION LINENEW SANITARY LATERAL LINENEW NATURAL GAS LINEEXISTING STORM LINEEXISTING WATER LINEEXISTING SANITARY LINEEXISTING ELECTRICAL LINE