HomeMy WebLinkAbout38_L1.0_Landscape PlanPROPOSED NATATORIUM
BUILDING ADDITION
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 834.65
TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52
LOT 53
LOT 54
LOT 55
LOT 56
LOT 57
LOT 58
LOT 59
LOT 60
LOT 61
PARCEL 7
PARCEL 8
ANNUAL PLANTING BED WITH
SHREDDED HARDWOOD MULCH
PLANTING BED (220 SF)
4
UMB
2
CKL
2
CKL
12
AML
10
AML
19
AML
1
QM
1
QM
5
PAM
6
PAM
14
RAG
31
RAG
1
LT
375
HHR
155
NFW
65
HHR
3
HPJ
39
HPL
25
CAK
6
HPJ
6
VC
10
HPJ
11
VC
12
TMD
12
VC
7
LTA
25
HPJ
19
CAK
3
FG
5
CAH
5
TME
15
TMD
5
MJ
115
HHR
TYP
TYP
TYP
5
TME 25
TMD
13
TMD60
NFW
7
AML
20
TME50
NFW
3
AGA
10
AML
5
AML3
AGA
4
TME
4
TME
5
AML
70
NFW
5
AML
12
HPJ
4
TME
PROPERTY LINEPROPERTY LINE30.0'
30
.
0
'LANDSCAPE BUFFERLANDSCAPE BUFFER25.0'BUILDING SETBACKBUILDING SETBACK25
.
0
'
40 12004080
L1.0
OVERALL LANDSCAPE PLAN
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220014.00
CARMEL HIGH
SCHOOL
NATATORIUM
ADDITION AND
RENOVATIONS
CARMEL CLAY SCHOOLS
520 E MAIN STREET
CARMEL, IN 46032
PROJECT ISSUE DATE: 11.17.2021
REGULATORY REVIEW
DRAWN BY: HHW
317.848.0966
350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204
REV.
NO.DESCRIPTION DATE
CONSULTANT
A TAC SUBMITTAL 11/17/2021
19700317
No.
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what's below.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana!
PROPOSED LANDSCAPE LEGEND
PROPOSED 2 1/2" CAL. DECIDUOUS TREE
PROPOSED SHRUB
PROPOSED ORNAMENTAL GRASS
SODDED LAWN
PROPOSED PERENNIAL
PROPOSED ANNUAL BED
KEYNOTES
SODDED LAWN PER SPECIFICATIONS
4" DEEP SHREDDED HARDWOOD MULCH PLANTING BED
PER SPECIFICATIONS
PROTECT TREES TO REMAIN
TRENCH BED EDGE - PER DETAIL C/L2.0
WASHED RIVER ROCK BED - PER DETAIL E/L2.0
MULCH TREE RING - PER DETAIL A/L2.0
CONCRETE WALL W/ DECORATIVE SIGNAGE
STEEL EDGING - PER DETAIL F/L2.0
1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.
2.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT
AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH
PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE ENGINEER.
3.LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS A & B ON
SHEET L2.0. WIRE BASKET, BURLAP AND TWINE MUST BE REMOVED FROM
ROOTBALL.
4.SHREDDED HARDWOOD PLANTING BEDS TO HAVE A TRENCH BED EDGE
AGAINST LAWN AREAS PER DETAIL C/L2.0.
5.TREES PLANTED IN LAWN AREAS TO HAVE A SHREDDED HARDWOOD MULCH
TREE RING PER DETAIL A/L2.0.
6.SEE PLANT SCHEDULE ON DWG L2.0 FOR PLANT TYPE AND SIZE.
GENERAL NOTES
ZONING SUMMARY