Loading...
HomeMy WebLinkAbout10_GD1.1_Site Demolition Plan NorthTBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78TBM#4 = 810.78 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 4 4 4 1 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 7 7 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 7 9 9 9 9 9 9 9 9 10 10 10 10 10 F 12 12 12 12 12 12 12 12 12 12 12 12 12 14 14 17 17 17 17 17 15 15 16 16 16 16 2 A 1 18 18 18 18 4 4 11 11 11 11 17 C C C 17 17 C C C C C D D D D E E 17 3 20 6002040 GD1.1 DEMOLITION PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO.DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR (REFER TO SHEET SV-4). THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.REMOVE ALL IRRIGATION SYSTEM COMPONENTS WITHIN THE PROPOSED BUILDING FOOTPRINT. 5.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 6.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 7.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 8.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTORS RESPONSIBILITY TO REMOVE OR RELOCATE ALL ITEMS WHICH INTERFERE NEW CONSTRUCTION. 9.THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES DEMOLITION KEYNOTES 1.PAVEMENT SAWCUT LINE (ASPHALT AND CONCRETE) 2.REMOVE ASPHALT PAVEMENT 3.REMOVE CONCRETE PAVEMENT 4.REMOVE CONCRETE SIDEWALK 5.REMOVE CONCRETE CURB 6.REMOVE PORTION OF EXISTING RETAINING WALL AND FENCE 7.REMOVE SIGN 8.REMOVE EXISTING IRON VEHICLE GATE AND POSTS. SALVAGE FOR PROPOSED RELOCATION. REMOVE EXISTING FOUNDATIONS IN THEIR ENTIRETY. 9.REMOVE TREE 10.REMOVE SHRUBS 11.REMOVE GATE POST 12.REMOVE LIGHT POLE AND FOUNDATION 13.REMOVE BUILDING CANOPY AND RELATED COLUMNS, COORDINATE WITH ARCHITECTURAL PLANS 14.REMOVE AND RELOCATE FIRE HYDRANT, COORDINATE NEW LOCATION WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 15.REMOVE FIRE PROTECTION LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 16.REMOVE STORM SEWER LINE, COORDINATE LIMITS OF REMOVAL WITH UTILITY PLAN (SHEET SU1.1 AND SU1.2) 17.REMOVE STORM STRUCTURE (MANHOLE OR INLET) 18.MILL EXISTING ASPHALT PAVEMENT 1 1/2" 19.EXISTING BUILDING DEMOLITION, SEE ARCHITECTURAL PLANS 20.ADJUST EXISTING SANITARY CASTING/STRUCTURE TO NEW FINISH GRADE A.PROTECT EXISTING CURB TO REMAIN IN PLACE B.PROTECT EXISTING LIFT STATION AND CONTROL PANEL TO REMAIN IN PLACE C.PROTECT EXISTING STORM PIPE TO REMAIN IN PLACE D.PROTECT EXISTING SANITARY PIPE TO REMAIN IN PLACE E.PROTECT EXISTING SANITARY MANHOLE TOT REMAIN IN PLACE F.PROTECT EXISTING DUMPSTER ENCLOSURE TO REMAIN IN PLACE DEMOLITION LEGEND APPROXIMATE LIMITS OF ASPHALT PAVEMENT REMOVAL APPROXIMATE LIMITS OF CONCRETE PAVEMENT OR WALK REMOVAL APPROXIMATE LIMITS OF CONCRETE CURB REMOVAL APPROXIMATE LIMITS OF UTILITY OR SEWER LINE REMOVAL APPROXIMATE LIMITS OF 1 1/2" ASPHALT SURFACE MILLING APPROXIMATE LIMITS OF BUILDING DEMOLITION (SEE ARCHITECTURAL PLANS)