HomeMy WebLinkAbout12_G0.1_MASTER PARKING planPROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98F.F.E.= 831.98F.F.E.= 831.98F.F.E.= 834.65FH1FH2FH4FH3GSMOKEY ROW ROAD / E 136TH STREETE MAIN STREETPARKING LOT ADDITION(NOT IN SCOPE OF THIS PROJECT)PERFORMING ARTS BUILDING ADDITION(UNDER CONSTRUCTION. NOT IN SCOPE OF THIS PROJECT)310126PAVING AT MURRAY FIELD(NOT IN SCOPE OF THIS PROJECT)1255153NATATORIUM BUILDING ADDITION1512141310109876543211122102682006000200400G0.1MASTER PARKING PLAN1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WEREPROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECTAREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTHPRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TOTHE ENGINEER.GENERAL NOTESKEYNOTESPROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS(NOT IN CONTRACT)PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS(NOT IN CONTRACT)11THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OFBICYCLE RACKS PROPOSED IN A PARTICULAR AREA.1THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATEDPARKING LOT IDENTIFICATION.PARKING LOT IDENTIFICATION NUMBERBICYCLE RACK LOCATION SUMMARY TABLE(NOT IN CONTRACT)LOCATIONBICYCLE RACKSMAIN BUILDING94FOOTBALL STADIUM28123137TENNIS COURTSMURRAY STADIUMTOTAL BICYCLE RACKS274TOTAL BICYCLE PARKING SPACESTHE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTSBICYCLE SPACES REQUIRED = 1 PER 20 STUDENTSBUILDING AREA SUMMARYYEAR(2002 THROUGH 2021)PROJECTEXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDEDREMARKS2002FRESHMAN CENTER2004LOCKER ROOM2012PHYSICAL EDUCATION2019POOL ENTRANCE #212021DOCK STORAGE2021PERFORMING ARTS776,647950,591953,243980,852981,547982,955173,9442,65227,6096951,40825,464950,591953,243980,852981,547982,9551,008,41922.400.282.900.070.142.59BZA APPROVAL WITH VARIANCESNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITIONNO CLASSROOM IN ADDITION2007TENNIS BUILDING1,700SEPARATE BUILDING AT STADIUM SITE2011SECURE ENTRANCE0NO NEW CONSTRUCTION2023NATATORIUM1,008,41993,2291,101,6489.25NO CLASSROOM IN ADDITIONOVERALL PARKING SUMMARYLOT NO.LOT NAMESTANDARD SPACEOLD SENIOR LOT651EXIST.PROPOSED65ADA SPACE0EXIST.0POLICE SPACE0EXIST.0BUS SPACE0EXIST.0TOTAL SPACES65EXIST.PROPOSED65234567891012131415DOOR 719194400002323FRONT LOT109103373300115113AUDITORIUM LOT520400000560WEST LOT69690000006969FRESHMAN CENTER LOT142142661100149149FIELDHOUSE LOT2929FITNESS CENTER LOT20222POOL LOT1100801000119TRAIL LOT152221070104152229SUBTOTAL76668627265504799697FOOTBALL HOME LOT94894811110000959959FOOTBALL SOUTH LOT143143000021 = 4221 = 42185185FOOTBALL VISITOR LOT516516990000525525FOOTBALL NORTH LOT79790000007979290000002900000000PROPOSEDPROPOSEDPROPOSED2,4452,547TOTALCITY OF CARMEL REQUIRED PARKING SPACES (174 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,323(UPON COMPLETION OF THE NATATORIUM PROJECT)SUBTOTAL1,6861,6862020001,7481,74821 = 4221 = 42AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2,644PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917NOTES:1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED.2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029.3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2)STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.4.THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 141 SPACES WILL BE AVAILABLE UNTIL THEN.5.THE CLASSROOM COUNT OF 174 EXCLUDES LABS AND OTHER EXTENDED LEARNING AREAS AS THE LATTER ARE SUPPLEMENTAL TOCLASSROOMS, AND ARE NOT OCCUPIED AT THE SAME TIME AS CLASSROOMS.11MURRAY FIELD LOT018020000020AVAILABLE PARKING SPACES AFTER JUNE 2022 = 2,351AVAILABLE PARKING SPACES AFTER DECEMBER 2023 = 2,445PROJECT PARKING SUMMARYLOT NO.(NATATORIUM BUILDING ADDITION)LOT NAMESTANDARD SPACEPOOL LOT1109EXIST.PROPOSED0ADA SPACE8EXIST.0POLICE SPACE1EXIST.0BUS SPACE0EXIST.0TOTAL SPACES119EXIST.0TRAIL LOT15210221070104152229MURRAY FIELD LOT01118020000020PROJECT TOTAL2822391091104293249NET LOSS = 44 SPACESPROPOSEDPROPOSEDPROPOSEDPROPOSEDFITNESS CENTER LOT2080200000220COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220014.00CARMEL HIGHSCHOOLNATATORIUMADDITION ANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.17.2021CONSTRUCTION DOCUMENTSDRAWN BY: HHW317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTATAC SUBMITTAL11/17/202119700317No.PROJECT MANAGER: PMR