HomeMy WebLinkAbout13_G1.0_Overall Site PlanTBM#2 = 834.95TBM#4 = 810.78HAR
R
O
W
G
A
T
E
A
D
D
I
T
I
O
N
P.B
.
2
,
P
G
.
2
0
3
-
2
0
5HARROWGATE ADDITIONP.B. 2, PG. 203-205LOT 52LOT 53LOT 54LOT 55LOT 56LOT 57LOT 58LOT 59LOT 60LOT 61PARCEL 7PARCEL 8PROPOSED NATATORIUMBUILDING ADDITIONF.F.E.= 831.98F.F.E.= 831.98F.F.E.= 831.98F.F.E.= 834.65FH1FH2FH4FH3G20 - PROPOSEDPARKING SPACES74 - PROPOSEDPARKING SPACES103.0'53.9'25.0'BUILDINGSETBACK30.0'LANDSCAPEBUFFER30.0'LANDSCAPEBUFFER25.0'BUILDINGSETBACK4012004080G1.0OVERALL SITE PLANCOPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.WWW.FHAI.COMARCHITECTPROJECT NUMBER: 220014.00CARMEL HIGHSCHOOLNATATORIUMADDITION ANDRENOVATIONSCARMEL CLAY SCHOOLS520 E MAIN STREETCARMEL, IN 46032PROJECT ISSUE DATE: 12.17.2021CONSTRUCTION DOCUMENTSDRAWN BY: HHW317.848.0966350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204REV.NO.DESCRIPTIONDATECONSULTANTATAC SUBMITTAL11/17/202119700317No.PROJECT MANAGER: PMRINLETS, VALVES, AND MARKS MADE UPON THE GROUND BYALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOREXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIESSHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAYALL CONSTRUCTION.THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIESEVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUNDCAUTION !!Know what'sbelow.before you dig.CallRCall 811 or 1-800-382-5544 Before You Begin Any Digging Project.Call 48 hours or 2 working days before you dig.It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONALLEGEND.2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWNWERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NOGUARANTEES THAT THE UNDERGROUND UTILITIES SHOWNCOMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER INSERVICE OR ABANDONED.3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THEPROJECT AREA INCLUDING UNDERGROUND UTILITYCONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITECONSTRUCTION. REPORT ANY DISCREPANCIES TO THEENGINEER.4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT ANAPPROVED STORM WATER MANAGEMENT PERMIT.5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BETHE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINERELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULTIN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THEDEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHINONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALLRESTORED/REPAIRED TO THE SATISFACTION OF THE CITY ATTHE COMPLETION OF THE PROJECT. THE CONTRACTOR ISENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITYPRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THEEXISTING CONDITION OF THE RIGHT-OF-WAY.7.REFER TO SITE DETAILS ON SHEETS G4.1 AND G4.2GENERAL NOTESPROPOSED SITE LEGENDEXISTING BUILDINGBUILDING ADDITIONCONCRETE PAVEMENT / WALKASPHALT PAVEMENTLANDSCAPE OR LAWN / TURF AREA(SEE LANDSCAPE PLAN FOR INFORMATION)APPROXIMATE LIMITS OF CONSTRUCTION